0% found this document useful (0 votes)
219 views4 pages

Bleo Holm

BLEO HOLM FPSO The BLEO HOLM’s main functions are: ? Receipt of fluids from subsea wells; ? Control of the subsea wells; ? Processing of the incoming fluids for separation into crude, water and gas; ? Storage of the stabilised crude oil and maintaining it at the required temperature; ? Treatment of effluent for discharge of water to the sea; ? Chemical injection; ? Export of produced gas to the Frigg pipeline. Part of the gas is utilized as fuel; ? Offloading of crude into “tandem moored

Uploaded by

perrychem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
219 views4 pages

Bleo Holm

BLEO HOLM FPSO The BLEO HOLM’s main functions are: ? Receipt of fluids from subsea wells; ? Control of the subsea wells; ? Processing of the incoming fluids for separation into crude, water and gas; ? Storage of the stabilised crude oil and maintaining it at the required temperature; ? Treatment of effluent for discharge of water to the sea; ? Chemical injection; ? Export of produced gas to the Frigg pipeline. Part of the gas is utilized as fuel; ? Offloading of crude into “tandem moored

Uploaded by

perrychem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

BLEO HOLM

FPSO
Data Sheet
2/4
BLEO HOLM FPSO

The BLEO HOLM’s main functions are:

� Receipt of fluids from subsea wells;


� Control of the subsea wells;
� Processing of the incoming fluids for separation into crude, water and gas;
� Storage of the stabilised crude oil and maintaining it at the required temperature;
� Treatment of effluent for discharge of water to the sea;
� Chemical injection;
� Export of produced gas to the Frigg pipeline. Part of the gas is utilized as fuel;
� Offloading of crude into “tandem moored” shuttle tankers;
� Power generation for process, gas export, offloading and utilities
� Provide accommodation for operating and maintenance personnel
� Provide helideck for helicopter operations

All systems are designed for a minimum annual average production up- time of 95%.

VESSEL DATA

Length 242.3 m

Breadth moulded 42 m

Depth moulded 21.2 m

Dead weight tonnage 105,000dwt

Deck area 7,985 m2

Accommodation 90 persons

PERFORMANCE DATA

Storage capacities

3
Exportable crude 109,000 m (689,472 bbls)

3
Slop tanks 7,602 m (41,838 bbls)

3
Diesel Oil 2,900 m (19,430 bbls)
3/4

Processing Capacities

Fluid capacity 140,000 bpd

Crude 100,000 bpd

Produced water (max) 135,000 bwpd

Oil content water discharged < 30 ppm

Offloading (max) 33,000 bbls/ hr

Stabilised crude

RVP 10-12 psia

H2S 0 ppm

BS&W < 1.0 %

Water injection

Capacity (max) 140,000 bwpd

Design pressure 3500 psia

Gas lift

Design pressure 2900 psia

Operating temperature 45 °C

Flow rate 58 MMscfd

Power

Main generators 2 x gas turbine, 1 x diesel

Capacity 2 x 10 MW + 1 x 5.3 MW

Emergency generator 1 x 0.5 MW Diesel

Offloading

Parcel size 500,000 bbls


4/4

Gas export

Flow rate (max) 40 MMscfd

Pressure 1,750 psia