RESEARCH GAP
✓ Building Information Modelling (BIM) have not fully developed in Indonesia because due
to internal factors, including: costs and capacity of human resources.
✓ The application sometimes causes misunderstanding due to no relation in the project
cycle with the companies
OBJECTIVES
1. To identify the current BIM awareness in Indonesia, Work TITLE
Java Island. BIM – Awareness, Challenges &
2. To evaluate the challenges of implementation in Opportunities for Implementation in
project design stage. Asian Countries - Indonesia
3. To determine the possible benefits of BIM which is
said to ease coordination, quicker information and
cost saving.
SIGNIFICANT OF RESEARCH
1. Helps to manage plan
scheduling and strategies so
RESEARCH QUESTION PROBLEM STATEMENT
that there will be no delay,
1. How to implement 1. Not everyone knows about budget loss and problems
BIM in construction Building Information implementing.
industry of Indonesia? Modelling (BIM), thus 2. Acts as a guideline for future
2. What are the barriers lacking in expertise of BIM. projects.
in implementing it? 2. Less budget to start 3. Improving method of project
implementing BIM. management approach.
METHODOLOGY
1. Conduct the literature review on the opportunities and strategies for BIM implementation in Java Island, Indonesia.
2. Collecting data and surveys about BIM from questionnaire that has been made in order to determine the potential
of implementing.
3. Identifying the difficulties and barriers, then plan on a strategy and opportunities for improving the existence of BIM
in Indonesia.