0% found this document useful (0 votes)
102 views3 pages

Portal Ratol & Rates Premo: Cawangan Kontrak Dan Ukur Bahan 04.11.2019

This document provides average rates in Malaysian Ringgit (RM) for various road construction works like asphalt paving of different thicknesses (40mm, 50mm, etc.) across several locations (A, B, C, etc.). The rates range from RM14-RM35 per square meter depending on the work item and location. Contact information is provided for any questions regarding the rates.

Uploaded by

John Smith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views3 pages

Portal Ratol & Rates Premo: Cawangan Kontrak Dan Ukur Bahan 04.11.2019

This document provides average rates in Malaysian Ringgit (RM) for various road construction works like asphalt paving of different thicknesses (40mm, 50mm, etc.) across several locations (A, B, C, etc.). The rates range from RM14-RM35 per square meter depending on the work item and location. Contact information is provided for any questions regarding the rates.

Uploaded by

John Smith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 04.11.2019

Work Item Unit Overall Average (RM)


ROADS, HARDSTANDING, FOOTPATHS AND m2 Location Range (RM) Average (RM) RM 24.50
PAVINGS
C 24.50 - 24.50 24.50
Roads
Surfacing
Asphaltic concrete binder course as specified
100mm Thick
ROADS, HARDSTANDING, FOOTPATHS AND m2 Location Range (RM) Average (RM) RM 35.00
PAVINGS
A 35.00 - 35.00 35.00
Roads
Surfacing
Asphaltic concrete binder course as specified
100mm Thick, slopping not exceeding 15 degree from
horizontal
ROADS, HARDSTANDING, FOOTPATHS AND m2 Location Range (RM) Average (RM) RM 22.96
PAVINGS
B 20.00 - 22.00 21.33
Roads
Surfacing C 20.00 - 25.00 21.72
Asphaltic concrete binder course as specified D 14.00 - 29.00 22.34
60mm Thick
E 10.80 - 35.70 25.78
F 18.00 - 32.00 23.60
ROADS, HARDSTANDING, FOOTPATHS AND m2 Location Range (RM) Average (RM) RM 17.88
PAVINGS
B 15.00 - 16.00 15.50
Roads
Surfacing C 20.00 - 20.00 20.00
Asphaltic concrete binder course as specified D 18.00 - 18.00 18.00
40mm Thick
E 6.00 - 23.80 17.96
F 13.10 - 22.00 17.93
ROADS, HARDSTANDING, FOOTPATHS AND m2 Location Range (RM) Average (RM) RM 22.04
PAVINGS
A 18.00 - 21.00 19.50
Roads
Surfacing B 16.50 - 16.50 16.50
Asphaltic concrete binder course as specified C 23.50 - 25.40 24.45
50mm Thick
D 21.00 - 21.00 21.00

1/3
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.11.2019

Work Item Unit Overall Average (RM)


E 22.00 - 22.00 22.00
F 16.70 - 16.70 16.70
G 25.20 - 25.20 25.20
H 30.00 - 32.00 31.00
ROADS, HARDSTANDING, FOOTPATHS AND m2 Location Range (RM) Average (RM) RM 20.00
PAVINGS
C 20.00 - 20.00 20.00
Roads
Surfacing
Asphaltic concrete binder course as specified
65mm Thick
ROADS, HARDSTANDING, FOOTPATHS AND m2 Location Range (RM) Average (RM) RM 31.50
PAVINGS
A 28.00 - 28.00 28.00
Roads
Surfacing F 35.00 - 35.00 35.00
Asphaltic concrete binder course as specified
70mm Thick

2/3
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 04.11.2019

Nota Catatan
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

u.p: En Husnan Husin


Tel: 03-26161111
Email: [email protected]

3/3

You might also like