Project Procurement Process Control
Project Procurement Process Control
•Project Specification
Rejected Rejected Rejected Rejected
•SAMSS
•Form-175
•Drawings
Requisition
Quality Plan Procurement List
Review
Rejected
•Special Requirements
• High Material Cost
Project START
Proposal • Complex Equipment
Accepted Pre-Inspection
Rejected • Critical Item involving Safety, Environment,
Survey Meeting
Reliability & Productivity of the Operation
•Review Notated Orders Assessment
•Past Experience with the Equipment/Vendor
•Inspection Level
•Final Disposition Report to •To be Reviewed •Contractor to Issue •Un-announced Quality •Two Weeks Look Ahead
be Submitted to VID & PID by SAIR Final Release Visit Schedule
•Final Inspection on- •Inspection Monitoring •Spot Inspection Visits.
Hold Report
•Inspector Evaluation
MR MATERIAL REQUISITION
Witness Point A stage, defined in an appropriate document, beyond which an activity may
proceed if not attended by designated organization or authority without their
approval. (Contractor/SA/TPI).
Review Point A stage, defined in an appropriate document, beyond which an activity must be
review. (Contractor/TPI).
Non Destructive Non-destructive Testing covers the use of eddy current, liquid penetrate testing,
Testing (NDT) magnetic testing, radiographic testing, and ultrasonic testing for discontinuity
location. This term shall also apply to visual inspection, leak testing, neutron
radiography, acoustic emission, and other NDT methods where national
certification programs exist.
Inspection Level “0” Material must be procured from an approved manufacturing plant. No visual
inspection or certificate review is required, and no SA-175 form is needed for
this material.
Inspection Level “1” Material certificates only are to be reviewed and released by SA inspector/TPI as
per SA-175 from prior to delivery to site. Material must be procured from an
approved manufacture.
Inspection Level “2” A Pre-inspection meeting shall be conducted & NMR-601 must be approved by
Company (SA) prior start the fabrication process. The W, H, R, points shall be
finalized during the meeting. Surveillance inspection is required prior final
inspection.
Inspection Level “3” Level 3 inspection is equivalent to level 2, more surveillance visits , hold &
witness point shall be added.
Inspection Level “4” A resident Inspector (TPI) must be assigned through out the manufacturing
process. All the major process activities shall be witnessed and reports shall be
submitted to Company (SA).