Tamil Nadu Government Gazette Extraordinary 211: Annexure XXIII
Tamil Nadu Government Gazette Extraordinary 211: Annexure XXIII
Annexure XXIII
1) The following guidelines are issued for the purpose of treating the building as
completed for issue of completion certificate
a) In respect of commercial buildings, the following items should have been
completed in all respects. However, interior completion works, fixtures, flooring
and partition need not be insisted.
(i) Terrace Floor with weathering course including parapet wall
(ii) Lift Machine Room, OHT and Stair-case Head room
(iii) Electrical installations (switch boxes and fixtures not to be insisted)
(iv) Sanitary and water supply installations (fixtures not to be insisted)
(v) Sump for water storage
(vi) Outer plastering of the building
(vii) Frames for joinery
(viii) No dowel rods left out in the building for vertical or horizontal expansion
(ix) Completion of Internal Plastering and Flooring need not be insisted
b) In case of residential buildings, the following items shall have been completed in
the said project to consider it for issue of Completion Certificate
(i) Terrace Floor with weathering course including parapet wall
(ii) Lift Machine Room, OHT and Stair-case Head room
(iii) Electrical installations (switch boxes and fixture not to be insisted)
(iv) Sanitary and Water Supply installations (fixtures not to be insisted)
(v) Sump for Water storage
(vi) Outer plastering of the building
(vii) Frames for Joinery
(viii) Kitchen (Provision on Modular Kitchen is permitted provided provision for
water supply / drainage is made)
(ix) Internal partition walls
(x) No dowel rods left out in the building for vertical or horizontal expansion
(xi) Completion of Internal Plastering and Flooring need not be insisted.
2) Completion Certificate Norms
1. Dimension of the Building The increase in the dimension of the building shall
not exceed 0.30 mts in length and 0.30 mts in
width.
b) Norms for Non High Rise buildings upto 18.30m height and exceeding 16
dwelling units and exceeding 300 square meters of commercial building shall be
regulated according to the table below::
1. Dimension of the building The increase in the dimension of the building shall
not exceed 0.30 mts. In length and 0.30 mts. in
width.
4. FSI Tolerance Limit FSI Tolerance limit will be 0.03 of FSI or 50 Sq.mt.
floor area whichever is higher over and above the
permissible FSI.
16. Structures permitted in Access steps to Ground floor and ramps, (without
affecting ventilation of Basement Floor) closed Well,
the set back area Water and Sewage Treatment Plant, Generator, Box
type transformers are permitted in the set back area
subject to availability of minimum driveway of 3.00
mts. and parking requirements as per the approved
plan.
17. Structures permitted in AC Plant and Two toilets in every block are
permitted in the Terrace Floor Architectural feature
the Terrace Floor in the periphery on the top most floor (Terrace
Floor) up to 3.00 mts. height is permissible subject
to the condition that the portion constructed over
allowable 1.5 mts. height parapet wall shall be non
continuous with solid portion not exceeding 50% of
the surface area.
18. Installation of Solar 1/3 rd area of the total terrace area to be reserved
Energy System for erecting Solar Photo Voltaic Panels. The
approximate space required for erecting Solar
Voltaic Panel is 10 sq.mt for generating 1 KW of
electricity.
c) Norms for High Rise buildings shall be regulated according to the table below::
1. Dimension of the building The increase in the dimension of the building shall
not exceed 0.30 mts. in length and 0.30 mts. in
width.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 215
2. Set Backs / Distance The reduction of 0.30 mts. In the set back space is
Between Blocks. permissible on all sides, subject to availability of
minimum 6.70 mts., for the buildings of within 30
mts. height. With increase in height above 30 mts.
corresponding increase in setback to be insisted.
4. FSI Tolerance Limit FSI Tolerance limit will be 0.03 of FSI or 50 Sq.mt.,
floor area whichever is higher over and above the
permissible FSI.
5. Architectural projection Service ducts upto 1.0 mt. here and there and not
to the entire width and length of the building and
& service ducts Architectural projection upto 0.60m. in width where
it is continuous and upto 1.0 mt. where it is dis-
continuous are permissible, subject to availability of
minimum clear set back of 6.70 mts. where required
set back is 7.0 mts. and minimum clear set back of
7.70 mts. where required set back is 8.0 mts. and
minimum set back of 8.70m. where required set
back is 9.0 mts.and so on
17. Structures permitted in Access steps to Ground floor and ramps, (without
affecting ventilation of Basement Floor) closed Well,
the set back area Water and Sewage Treatment Plant, Generator, Box
type transformers are permitted in the set back area
subject to availability of minimum set back of 6.7
mts. and satisfying the parking requirements.
18. Structures permitted in AC Plant and Two toilets in every block are
permitted in the Terrace Floor. Architectural feature
the Terrace Floor in the periphery on the top most floor (Terrace
Floor) up to 3.00 mts. height is permissible subject
to the condition that the portion constructed over
allowable 1.5 mts. height parapet wall shall be non
continuous with solid portion not exceeding 50% of
the surface area.
19. Installation of Solar 1/3 rd area of the total terrace area to be reserved
Energy System for erecting Solar Photo Voltaic Panels. The
approximate space required for erecting Solar
Voltaic Panel is 10 sq.mt for generating 1 KW of
electricity.
HARMANDER SINGH,