Inspection and Test Plan Rev.0
Inspection and Test Plan Rev.0
DOCUMENT TITLE
PL-QC-ITP-001
PROJECT NAME
PRESSUREOF
DEHYDRATE VESSEL 31-V161410-S12
CENTRIFUGE & 31-V20
SITE OTHER
Page 1 of 2
2 MATERAIL INCOMING
- Procurement Review Puchase Oder ASME Sec. II Part A,B,C,D R
- Receiving Inspection Check, marking, dimension check NDE. Purchase Order S I/H H/W HOLD POINT
if req'd.,quantity, check for damage
- Material test certificate Verify P.O. & Code compliance ASME Sec. II Part A,B,C,D S R R
3 SHOP FABRICATION
- Rolling and bending of shell Diameter and thickness check Fabrication Drawing S I SW
- Fit-up of shell Diameter,Roundness,Bevel,Root opening Fabrication Drawing S I SW
- Welding of longtudinal shell Verfy WPS , welder, visual inspection ASME Sec. IX S I SW
- Fit-up of head, flange to shell Check alignment, cleanliness,visual Fabrication Drawing S I H/W HOLD POINT
inspection of tack welds,Bevel,Root opening
- Fabrication nozzle and pad plate Verrify material ID markings,dimension Material certificate S I SW
check, fit-up inspection Fabrication Drawing
- Lay-out, cutting & bevelling nozzle openings Check orientation & dimension Fabrication Drawing I SW
- Fit-up pads,nozzle neck to head & Shell Check alignment, cleanliness,visual, projection, Fabrication Drawing S I SW
Elevation, Orientation, Flange tilt
SIGNATURE
DATE 27/8/2019
28/12/2017
Page 2 of 2
4 NDE.
- 100% PT or MT for Nozzle By PILIN PT&MT Level II ASME Vlll Div.1 S I SW
(cat.D and remove all weld to shell)
- 100% PT or MT for knuckle of Heads By PILIN PT&MT Level II ASME Vlll Div.1 S I SW
- 100% PT for removed all tack welds to pressure part By PILIN PT&MT Level II ASME Vlll Div.1 S I SW
5 FINAL INSPECTION
- Check internal & external Final visual inspection, verify Fabrication Drawing S I/H H/W HOLD POINT
as-built dimension, orientation,projection,
6 HYDROTEST
- Pressure increment Holding time ASME Code Sec. VIII Div.1 S H H/W HOLD POINT
- Inspection Check all welding seam for leak Hydrostatic test procedure S I/H H/W HOLD POINT
As per approved for construction
- Test Pressure Pressure monitor S I/H H/W HOLD POINT
drawing
- Cleaning & drying Check for cleanliness, dryness
9 QUALITY CONTROL DOSSIER Verify for cindition All shop inspection report S R R
COMPANY PILIN PROJECT CO.,LTD. UBE CHEMICALS (ASIA) PUBLIC CO.,LTD UBE CHEMICALS (ASIA) PUBLIC CO.,LTD
SIGNATURE
DATE 27/8/2019
28/12/2017