Appendix B - Wind Load Calculations With Extension
Appendix B - Wind Load Calculations With Extension
Building data
Type of roof Gable
Length of building b = 13490 mm
Width of building d = 8119 mm
Height to eaves H = 10612 mm
Pitch of roof 0 = 5.7 deg
Mean height h = 10612 mm
Topography
Topography factor not significant Kzt = 1.0
Velocity pressure equation q = 0.6131N/m2 Kz K zt K d V 2 / (1m/s)2
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(m) (kN/m2) (kN/m2) (m2) (kN)
A (-ve) 10.61 -1.08 2.16 -3.17 55.04 -174.20
B (-ve) 10.61 -1.08 2.16 -3.17 16.90 -53.49
C (-ve) 10.61 -0.70 2.16 -2.47 38.14 -94.16
Total vertical net force Fw,v = -320.25 kN
Total horizontal net force Fw,h = -2.64 kN
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(m) (kN/m2) (kN/m2) (m2) (kN)
A1 4.57 0.80 1.87 0.08 61.68 5.20
A2 7.62 0.80 2.03 0.20 41.12 8.03
A3 10.61 0.80 2.16 0.28 40.38 11.32
B 10.61 -0.50 2.16 -2.10 143.16 -300.98
C 10.61 -0.70 2.16 -2.47 87.81 -216.80
D 10.61 -0.70 2.16 -2.47 87.81 -216.80
Overall loading
Projected vertical plan area of wall Avert_w_0 = b H = 143.16 m2
Projected vertical area of roof Avert_r_0 = b d/2 tan(0) = 5.48 m2
Minimum overall horizontal loading Fw,total_min = pmin_w Avert_w_0 + pmin_r Avert_r_0 = 112.3
kN
Leeward net force Fl = Fw,wB = -301.0 kN
Windward net force Fw = Fw,wA_1 + Fw,wA_2 + Fw,wA_3 = 24.6 kN
Overall horizontal loading Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 322.9 kN
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(m) (kN/m2) (kN/m2) (m2) (kN)
A1 4.57 0.80 1.87 2.46 61.68 151.50
A2 7.62 0.80 2.03 2.57 41.12 105.56
A3 10.61 0.80 2.16 2.65 40.38 107.10
B 10.61 -0.50 2.16 0.27 143.16 38.59
C 10.61 -0.70 2.16 -0.10 87.81 -8.52
D 10.61 -0.70 2.16 -0.10 87.81 -8.52
Overall loading
Projected vertical plan area of wall Avert_w_0 = b H = 143.16 m2
Projected vertical area of roof Avert_r_0 = b d/2 tan(0) = 5.48 m2
Minimum overall horizontal loading Fw,total_min = pmin_w Avert_w_0 + pmin_r Avert_r_0 = 112.3
kN
Leeward net force Fl = Fw,wB = 38.6 kN
Windward net force Fw = Fw,wA_1 + Fw,wA_2 + Fw,wA_3 = 364.2 kN
Overall horizontal loading Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 325.6 kN
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(m) (kN/m2) (kN/m2) (m2) (kN)
A (-ve) 10.61 -1.03 2.16 -3.08 43.29 -133.37
B (-ve) 10.61 -0.79 2.16 -2.63 43.29 -113.67
C (-ve) 10.61 -0.61 2.16 -2.31 23.48 -54.31
Total vertical net force Fw,v = -299.85 kN
Total horizontal net force Fw,h = 0.00 kN
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(m) (kN/m2) (kN/m2) (m2) (kN)
A (+ve) 10.61 -0.18 2.16 0.86 43.29 37.06
B (+ve) 10.61 -0.18 2.16 0.86 43.29 37.06
C (+ve) 10.61 -0.18 2.16 0.86 23.48 20.10
Total vertical net force Fw,v = 93.76 kN
Total horizontal net force Fw,h = 0.00 kN
Ref. Ext pressure Peak velocity Net pressure Area Net force
Zone height coefficient cpe pressure qp p Aref Fw
(m) (kN/m2) (kN/m2) (m2) (kN)
A1 4.57 0.80 1.87 2.46 37.12 91.18
A2 7.62 0.80 2.03 2.57 24.75 63.53
A3 11.02 0.80 2.17 2.66 25.94 69.06
B 10.61 -0.37 2.16 0.51 87.81 44.96
C 10.61 -0.70 2.16 -0.10 143.16 -13.89
D 10.61 -0.70 2.16 -0.10 143.16 -13.89
Overall loading
Projected vertical plan area of wall Avert_w_90 = d H + d 2 tan(0) / 4 = 87.81 m2
Projected vertical area of roof Avert_r_90 = 0.00 m2
Minimum overall horizontal loading Fw,total_min = pmin_w Avert_w_90 + pmin_r A vert_r_90 = 67.6
kN
Leeward net force Fl = Fw,wB = 45.0 kN
Windward net force Fw = Fw,wA_1 + Fw,wA_2 + Fw,wA_3 = 223.8 kN
Overall horizontal loading Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 178.8 kN