0% found this document useful (0 votes)
42 views5 pages

Chávez Cotrina, Joel Lidwer: Laboratorio 4

This document contains data on mineral grades by block levels for a copper mine. It lists the copper and silver grades in percentage for 47 different block levels ranging from 2500 to 2160. It also provides information on costs for mining, administration, commercialization, and plant operations. The cutoff grade for the mine is 0.22% copper equivalent. The estimated tonnages per block level are 2,300 tons for levels 2500 to 2180, and 2,600 tons for deeper levels. The volume of topsoil to be removed is estimated at 8,000 cubic meters.

Uploaded by

joel lidwer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views5 pages

Chávez Cotrina, Joel Lidwer: Laboratorio 4

This document contains data on mineral grades by block levels for a copper mine. It lists the copper and silver grades in percentage for 47 different block levels ranging from 2500 to 2160. It also provides information on costs for mining, administration, commercialization, and plant operations. The cutoff grade for the mine is 0.22% copper equivalent. The estimated tonnages per block level are 2,300 tons for levels 2500 to 2180, and 2,600 tons for deeper levels. The volume of topsoil to be removed is estimated at 8,000 cubic meters.

Uploaded by

joel lidwer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Chávez Cotrina, Joel Lidwer

LABORATORIO 4

SOLUCIÓN
DATA GENERAL
Leyes de mineral de cobre por bloques
COSTO Lastre Mineral NIVEL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

Mina 1.2 1.5 (US$/ton) 2500 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2480 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Administración: 0.2 0.2 (US$/ton)
2460 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Comercialización: 0.02 (US$/ton) 2440 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Planta: 10.0 (US$/ton) 2420 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 1.2 11.7 (US$/ton) 2400 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2380 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.23 0.23 0.23 0.25 0.23 0.28 0.23 0.23 0.23 0.23 0.23 0.23 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2360 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.23 0.23 0.23 0.25 0.23 0.28 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2340 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.23 0.23 0.23 0.35 0.35 0.35 0.35 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.37 0.37 0.37 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
REM Cu Ag 2320 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.53 0.53 0.53 0.53 0.53 0.35 0.35 0.35 0.35 0.41 0.41 0.41 0.56 0.71 0.86 1.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Recuperación Metalurgica: 90.0 (%) 87.0 % 2300 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.23 0.23 0.35 0.60 0.60 0.60 0.60 0.60 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.53 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Precio: 2.75 (US$/lb) 14.50 (US$/oz) 2280 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.41 0.41 0.41 0.47 0.47 0.62 0.62 0.62 0.23 0.23 0.62 0.01 0.01 0.01 0.01 0.01 0.23 0.23 0.23 0.23 0.23 0.23 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2260 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.59 0.59 0.59 0.53 0.53 0.62 0.62 0.62 0.62 0.62 0.62 0.01 0.01 0.23 0.23 0.23 0.41 0.41 0.41 0.41 0.67 0.67 0.67 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2240 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.41 0.41 0.41 0.41 0.37 0.61 0.53 0.35 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.87 0.35 0.41 0.53 0.53 0.67 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2220 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.41 0.41 0.41 0.56 0.56 0.56 0.56 0.01 0.01 0.01 0.53 0.53 0.88 1.14 1.40 1.66 1.92 0.56 0.01 0.01 0.01 0.63 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LEY DE CORTE: 0.22 (% Cu eq.T) 2200 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.58 0.63 0.74 0.53 0.53 0.53 0.23 0.56 0.56 0.56 0.23 0.14 0.05 0.56 0.56 0.64 0.64 0.64 0.35 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2180 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.56 0.56 0.41 0.41 0.41 0.63 0.53 0.57 0.61 0.65 0.69 0.73 0.72 0.77 0.81 0.85 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2160 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.61 0.61 0.30 0.61 0.01 0.65 0.01 0.66 0.82 0.23 0.65 0.01 0.76 0.01 0.64 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Toneladas x BLQ: 2,300 2,600 (ton)
Volúmen topsoil x BLQ 8,000 (m3)
LEYES EQUIVALENTES
Leyes de mineral de cobre por bloques
NIVEL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
2500 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2480 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2460 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2440 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2420 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2400 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2380 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.46 0.46 0.46 0.48 0.46 0.51 0.46 0.46 0.46 0.46 0.46 0.46 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2360 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.46 0.46 0.46 0.48 0.46 0.51 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2340 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.46 0.46 0.46 0.58 0.58 0.58 0.58 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.60 0.60 0.60 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2320 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.65 0.65 0.65 0.65 0.65 0.58 0.58 0.58 0.58 0.53 0.53 0.53 0.68 0.76 0.91 1.06 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2300 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.46 0.46 0.58 0.72 0.72 0.72 0.72 0.72 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.65 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2280 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.53 0.53 0.53 0.59 0.59 0.67 0.67 0.67 0.46 0.46 0.67 0.01 0.01 0.01 0.01 0.01 0.46 0.46 0.46 0.46 0.46 0.46 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2260 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.71 0.71 0.71 0.65 0.65 0.67 0.67 0.67 0.67 0.67 0.67 0.01 0.01 0.46 0.46 0.46 0.53 0.53 0.53 0.53 0.72 0.72 0.72 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2240 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.53 0.53 0.53 0.53 0.60 0.66 0.65 0.58 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.92 0.58 0.53 0.65 0.65 0.72 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2220 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.53 0.53 0.53 0.68 0.68 0.68 0.68 0.01 0.01 0.01 0.65 0.65 0.88 1.14 1.40 1.66 1.92 0.68 0.01 0.01 0.01 0.68 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2200 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.70 0.68 0.79 0.65 0.65 0.65 0.46 0.68 0.68 0.68 0.46 0.14 0.05 0.68 0.68 0.69 0.69 0.69 0.58 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2180 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.68 0.68 0.53 0.53 0.53 0.68 0.65 0.69 0.66 0.70 0.74 0.78 0.77 0.82 0.86 0.90 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2160 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.66 0.66 0.53 0.66 0.01 0.70 0.01 0.71 0.87 0.46 0.70 0.01 0.81 0.01 0.69 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FINOS

DATO
PRODUCCIÓN 20 ktp

capacidad de desmontera y Top soil (tons)


LASTRE (perfil de
RESERVAS ley media SR V. operacional(días) LASTRE TOTAL (tons) TOP SOIl (tons)
diseño)
ton n n n
n block FINOS ton block 0.584 56.77 ton block ton block
block block block block
212 2,600.0 3,342.47 140 2,300.0 254 2,300.0 101 8,000.0

RESERVAS (tons) ley media (%) LASTRE (tons) LASTRE TOTAL (tons) TOP SOIl (tons)

551,200 0.606 322,000 584,200.0 808,000.0

capacidad de desmontera y Top soil (tons)


1,392,200.0
Leyes de mineral de cobre por bloques
NIVEL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
2500 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2480 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2460 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2440 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2420 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2400 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2380 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 11.99 11.99 11.99 12.51 11.99 13.29 11.99 11.99 11.99 11.99 11.99 11.99 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2360 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 11.99 11.99 11.99 12.51 11.99 13.29 11.99 11.99 11.99 11.99 11.99 11.99 11.99 11.99 11.99 13.67 13.67 13.67 13.67 13.67 13.67 13.67 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2340 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 11.99 11.99 11.99 15.11 15.11 15.11 15.11 13.67 13.67 13.67 13.67 13.67 13.67 13.67 13.67 13.67 13.67 13.67 13.67 15.63 15.63 15.63 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2320 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 13.67 13.67 13.67 13.67 13.67 13.67 13.67 16.79 16.79 16.79 16.79 16.79 15.11 15.11 15.11 15.11 13.67 13.67 13.67 17.57 19.66 23.56 27.46 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2300 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 11.99 11.99 15.11 18.61 18.61 18.61 18.61 18.61 13.67 13.67 13.67 13.67 13.67 13.67 13.67 16.79 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2280 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 13.67 13.67 13.67 15.23 15.23 17.32 17.32 17.32 11.99 11.99 17.32 0.01 0.01 0.01 0.01 0.01 11.99 11.99 11.99 11.99 11.99 11.99 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2260 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 18.35 18.35 18.35 16.79 16.79 17.32 17.32 17.32 17.32 17.32 17.32 0.01 0.01 11.99 11.99 11.99 13.67 13.67 13.67 13.67 18.62 18.62 18.62 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2240 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.40 13.67 13.67 13.67 15.63 17.06 16.79 15.11 13.67 13.67 13.67 13.67 13.67 13.67 13.67 13.67 13.67 23.82 15.11 13.67 16.79 16.79 18.62 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2220 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.40 0.40 13.67 17.57 17.57 17.57 17.57 0.01 0.01 0.01 16.79 16.79 22.79 29.55 36.31 43.07 49.83 17.57 0.01 0.01 0.01 17.58 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2200 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 18.09 17.58 20.44 16.79 16.79 16.79 11.99 17.57 17.57 17.57 11.99 0.14 0.05 17.57 17.57 17.84 17.84 17.84 0.40 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2180 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 17.57 17.57 13.67 13.67 13.67 17.58 16.87 17.91 17.15 18.19 19.23 20.27 19.92 21.31 22.35 23.39 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2160 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.01 0.01 0.01 0.01 0.01 0.01 17.06 17.06 13.81 17.06 0.01 18.10 0.01 18.36 22.52 11.99 18.10 0.01 20.96 0.01 17.84 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
INTERPRETACIÓN

Se observa que desde la cota 2000 y 2400 (perfil del pit); los indicadores como las reservas, ley media y SR, resultan muy
favorables, por ejemplo:
 El SR presenta un valor muy razonable, y no un valor critico; y se diera el caso de que el SR sea critico se optaría por cambia
de método de explotación.
 La ley media (0.606 % cu eq.) está muy por encima del cut off (0.22% cu eq.) y justifica su explotabilidad.
 Tenemos buena cantidad de reserva – blocks minables.
 Al tener un menor precio en el cobre nuestra ley de corte se incrementa porque al reducir nuestras reservas se disminuye el
número de bloques.
 los beneficios son inversamente proporcional al precio del mineral ya que es necesario saber la ley de corte para saber que
bloques se explotaran y nos darán beneficios.
 Una vez terminado los cálculos, contamos con una vida útil del tajo para 30.81 y esto tiene una gran influencia para la compra
de maquinarias.
 presenta una gran cantidad de reserva y por el tipo de yacimiento , la reserva es 616200.00
 para sacar una tonelada de mineral tengo que mover 2,62 ton de desmonte
 En 1tn de mineral que ingresa a planta me pagan 130.73 $
Sin embargo, Los resultados obtenidos también nos indican que se tienen que hacer unos ajustes en cuanto a la perfilación del
pit; porque tal como se presenta en el cuadro de resultados se deduce que:
 Se necesita una gran capacidad de desmontera y top soil, y además se debe de profundizar 100m para poder empezar a
minar nuestras reservas, y todo ese tiempo que necesitamos para retirar el desmonte y top soil que recubre nuestro pit será de
un elevado costo y eso puede tener repercusión en la viabilidad de nuestro proyecto.
Una vex que iniciemos con la explotación, nosotros tendríamos que optar por iniciar con una primera fase, la cual se indica en
el grafica; esto se hace con el fin de que en el tiempo que estemos retirando el desmonte y el top soil, todo no sea gastos sino
por el contrario empezar a minar reservas que nos aseguren utilidades en un corto periodo. Otro objetivo que tiene el tener
utilidades es que con eso se pueda ir pagando costos como gastos generales, administración, equipos, accesorios, etc.

You might also like