Monitoring and Verification Activities: Section: Sub-Section
Monitoring and Verification Activities: Section: Sub-Section
MONITORING
No specific facility Water test results Ensure water testing Visually verify
WATER
program exists; from ISO 17025 certificate is valid Operations Manager SQF Practitioner current testing Annually
MICROBIOLOGY
certificate only compliant laboratory and current. certificate
AND QUALITY
Engineering and
Maintenance
Personnel
Completed CityIce
Maintenance
Work Orders Operations Manager As needed, after
Program Ensure corrective Initials/Signature on
each corrective
maintenance was completed CityIce
Operator’s Daily SQF Practitioner maintenance task
CORRECTIVE effective. Work Order
Checklist for Electric has been completed.
MAINTENANCE
Forklifts Engineering and General Manager
Maintenance
Personnel NOTE: NOT the
same person as the
PREMISES AND one who completed
EQUIPMENT the task.
MAINTENANCE
SQF Practitioner
Maintenance
Ensure completion of Initials/Signature on
Program Work Order Operations Manager
all preventive Work Order
Summary Task Quarterly
maintenance tasks Summary Task
PREVENTIVE Count Report General Manager
from previous period. Count Report
MAINTENANCE
Chief Engineer
Warehouseman
Ensure completion of Initials on completed
Equipment Operator’s Daily Warehouse Foreman Operations Manager
preoperational “Operator’s Daily
Cleanliness Checklist for Electric or their designated Daily
equipment Checklist for Electric
Program Forklifts Utility Personnel representative
inspections. Forklifts” Tracker
Head Lumper
Document #: 26.3
Ensure temperatures
have been
maintained within
proper ranges.
Ensure corrective
action was initiated
and documented in
response to any
nonconformities.
Document #: 26.3