0% found this document useful (0 votes)
33 views2 pages

Transportation Presprective Analysis

This document contains a table showing the daily capacity and production levels across 4 facilities over 4 days in March. It also includes the daily demand levels. The objective is to minimize the overall function by finding the sum of products of the differences between daily production and demand across all facilities and days.

Uploaded by

Lavanya Shetty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views2 pages

Transportation Presprective Analysis

This document contains a table showing the daily capacity and production levels across 4 facilities over 4 days in March. It also includes the daily demand levels. The objective is to minimize the overall function by finding the sum of products of the differences between daily production and demand across all facilities and days.

Uploaded by

Lavanya Shetty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1-Mar 2-Mar 3-Mar 4-Mar capacity

fac1 5 4 6 3 250
fac2 7 8 8 1 300
fac3 4 4 3 6 100
fac4 8 7 6 8 200
demand 250 200 200 200

1-Mar 2-Mar 3-Mar 4-Mar capacity


fac1 250
fac2 300
fac3 100
fac4 200

demand 250 200 200 200

O.F MINIMISE 0
SUMPRODUCT