Drawing Mini PIle Area Sta 17+950

This document is an engineering drawing for a toll way project in Sumedang Sub-Province, West Java. It provides details for the cross section at station 17+950, including dimensions for the road width, shoulders, slopes, and elevations. The drawing was prepared by PT. CECI In Collaboration with multiple contractors and consultants and approved by the Engineering Section of the Ministry of Public Works & Housing.

Uploaded by

ari dwi n
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views1 page

Drawing Mini PIle Area Sta 17+950

This document is an engineering drawing for a toll way project in Sumedang Sub-Province, West Java. It provides details for the cross section at station 17+950, including dimensions for the road width, shoulders, slopes, and elevations. The drawing was prepared by PT. CECI In Collaboration with multiple contractors and consultants and approved by the Engineering Section of the Ministry of Public Works & Housing.

Uploaded by

ari dwi n
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Engineering Consultant : Contractor : Prepared by: Approved by : Consultant Drawing Title : Drawing No.

:
MINISTRY OF PUBLIC WORKS & HOUSING Contractor Engineering Section MCC/SD/CSD/B-08/49
PT. CECI In Collaboration with
SHOP PT. DAYA CREASI MITRAYASA METALURGICAL CORPORATION OF Ref. Dwg : REV DED
GENERAL DIRECTORATE OF HIGHWAY CILEUNYI - SUMEDANG - DAWUAN TOLL WAY PT. INDRA KARYA (Persero)
Cross Section STA 17+950
CHINA Ltd.-WIKA-NINDYA-WASKITA B-08
DRAWING Sumedang Sub-Provincce, West Java PT. PARAMA KARYA MANDIRI
DIRECTORATE OF TOLLWAY AND URBAN ROAD PT. CIRIATAMA NUSAWIDYA CONSULT Xie Ding Ding Chen, Shyh - wen Scale : NTS
JOINT OPERATION
PT. SEECONS Chief Engineer Team Leader Professional Engineer Rev. : 01

41.079 272.73

10.297 30.782 35.551 237.18

780
ROW

ROW
770 FINAL STAGE 2.50 FINAL STAGE
7.20 1.50 1.50 7.20 3.00 1.50 3.60
3.60 1.50 3.00
3.60 3.60 0.40 3.60 3.60
ROW

ROW
EL.CL 754.795
0.50 0.50
760

1.50

0.84
3.00
TMP 755.396

2.00
3.50

TMP 753.396
EL. BC 751.847 1.15
ROW

ROW
1.00

750
ROW

ROW
740

730
-40 -30 -20 -10 0 10 20 30 40 50 270

You might also like