SOLUTION:
Loading/ unloading dock is to be located near to a corner of the proposed
building (X):
K= 2(L+B)
= 2(400+600)
= 2000 sq. ft.
Cost of construction= 400000*$75
= 30000000
Annualizing the cost= 30000000/25
= 1200000
On a perimeter per feet cost= 1200000/2000
= 600ft K
C= holding cost (monthly throughput*12)
= $.075(150000*12)
= $135000/ft
W*= √(c+8k)/(2c+8k) √S
= √139800/274800 √400000
= 0.713255651*632.455532
= 451ft apx.
L*= S/W*
= 400000/451
= 867 ft apx.
TCx= 2√[((1/2)*c)+2k][((1/4)*c)+2k] √S
= 2√[((1/2)*135000)+2*600][((1/4)*135000)+2*600] √400000
TCx= $61,936,000
W*= √S
= √400000
= 632 ft
L*= √S
= √400000
= 632 ft
TCy= [((1/2)*c) +4K] √S
= [((1/2)*135000) + 4*600] √400000
= 69900*632
= $44,176,800
TCx – TCy = $61,936,000 - $44,176,800
= $17,759,200
The cost of locating the loading/unloading dock near to the center is less in comparison to the
dock located near the corner. There is the total cost saving is of $17,759,200 if the dock will be
made at the center rather than making it at the corner.
Q1) Loading/ unloading dock is to be located near to a corner of the proposed building?
A1) W*= √(c+8k)/(2c+8k) √S
= √139800/274800 √400000
= 0.713255651*632.455532
= 451ft apx.
L*= S/W*
= 400000/451
= 867 ft apx.
Q2) Loading/ unloading dock is to be located near to the center of the proposed building?
A1) W*= √S
= √400000
= 632 ft
L*= √S
= √400000
= 632 ft
Q3) The total relevant cost for both the cases when loading/ unloading dock is to be located near
to a corner and to the center?
A3) TCx= 2√[((1/2)*c)+2k][((1/4)*c)+2k] √S
= 2√[((1/2)*135000)+2*600][((1/4)*135000)+2*600] √400000
TCx= $61,936,000
TCy= [((1/2)*c) +4K] √S
= [((1/2)*135000) + 4*600] √400000
= 69900*632
= $44,176,800
Q4) What is the cost difference for both the cases mentioned in above question?
A4) TCx – TCy = $61,936,000 - $44,176,800
= $17,759,200