Reference 2
Reference 2
Ahmed, S., Hassan, M. H., & Taha, Z. (2005). TPM can go beyond maintenance:
excerpt from a caseimplementation. Journal of Quality in
Maintenance Engineering.
Ahmed, T., Ali, S. M., Allama, M. M., & Parvez, M. S. (2010). A Total
Productive Maintenance(TPM)Approach to Improve Production
Efficiency and Development of Loss Structure in aPharmaceutical
Industry. Global Journal of Management and Bussiness Research.
Ben-Daya, M., & Duffuaa, S. O. (1995). Maintenance and Quality : the missing
link. Journal of Quality in Maintenance Engineering.
Dal, B., Tugwell, P., & Greatbanks, R. (2000). Overall equipment effectiveness as
a measure ofoperational improvement - A practical analysis.
International Journal of Operations &Production Management.
Sharma, A., Yadava, G. S., & Deskmukh, S. G. (2011). A Literature Review and
Future Perspectives on Maintenance Optimization. Journal of Quality
in Maintenance Engineering.
Takahashi, K., & Nakamura, N. (2000). Agile control in JIT ordering systems.
International Journal of Agile Management Systems.
Thomas, A. J., Chard, J., John, E., Davis, A., & Francis, M. (2011). Defining a
bearing replacement strategy using Monte Carlo methods.
International Journal of Quality & Reliability Management
Wahjudi, D., Tjitro, S., & Soeyono, R. (2009). Studi Kasus Peningkatan Overall
Equipment Effectiveness (OEE) Melalui Implementasi Total
Productive Maintenance(TPM).