Description T OP M1 M2 M3 Description T OP M1 M2 M3

The document is a template for recording the proposed method for a process and analyzing the cycle times of the operator and machines M1, M2, and M3 involved over a period of 50.5 seconds in 0.5 second increments. It includes fields to document the diagram number, person elaborating the method, date, and cycle times and idle percentages of the operator and machines.
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views

Description T OP M1 M2 M3 Description T OP M1 M2 M3

The document is a template for recording the proposed method for a process and analyzing the cycle times of the operator and machines M1, M2, and M3 involved over a period of 50.5 seconds in 0.5 second increments. It includes fields to document the diagram number, person elaborating the method, date, and cycle times and idle percentages of the operator and machines.
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Actual Method: Diagram No:___________________

Proposed Method: Elaborated by:_________________________________________________


Date:_________________________ Page: ________ of ________

Description t OP M1 M2 M3 Description t OP M1 M2 M3
0.5 25.5
1 26
1.5 26.5
2 27
2.5 27.5
3 28
3.5 28.5
4 29
4.5 29.5
5 30
5.5 30.5
6 31
6.5 31.5
7 32
7.5 32.5
8 33
8.5 33.5
9 34
9.5 34.5
10 35
10.5 35.5
11 36
11.5 36.5
12 37
12.5 37.5
13 38
13.5 38.5
14 39
14.5 39.5
15 40
15.5 40.5
16 41
16.5 41.5
17 42
17.5 42.5
18 43
18.5 43.5
19 44
19.5 44.5
20 45
20.5 45.5
21 46
21.5 46.5
22 47
22.5 47.5
23 48
23.5 48.5
24 49
24.5 49.5
25 50

Operator Cycle Time:__________________________________________ Operator Idle Percentage (%):_____________________________________


M1 Cycle Time:_______________________________________________ M1 Idle Percentage (%):_________________________________________
M2 Cycle Time:_______________________________________________ M2 Idle Percentage (%):_________________________________________
M3 Cycle Time:_______________________________________________ M3 Idle Percentage (%):_________________________________________