Specifications: How To Write Specification
Specifications: How To Write Specification
Specification
• Drawings with specification “ will completely define the structure
How to write specification
Necessity of specification
Description of materials
• Describe the quality and quantity of materials required for • quality and size of materials
construction work • Proportion of mixing or treatment of materials if required before use
• Specifies the workmanship and method of doing work
Workmanship
• Work carried as per specification and contractor is paid for same
• method of mixing to proportion , method of laying ,preparation of base or
• Necessary to specify the equipments , tools and plants to be engaged surface , compaction, finishing ,curing ……….applicable to work shall be
for a work clearly stated in different clauses
• Necessary to verify and check the strength of materials for a work
involved in a project Tools and plants‐
• method of operation and by whom to be supplied shall be stated
• Cost of unit quantity of work is governed by its specification
1
9/18/2019
Types of specification
General specifications
Expression
• Express requirements clearly and in concise form avoiding repetition
and unusual words • Nature and class of work , name of materials and proportion that
should be used in various items shall be described
• Style of tense shall remain same throughout
• Only a brief description is given
Clauses
• Clauses shall be arranged in order in which work shall be carried out
• Useful for estimating the project
Standard specification
Detailed specifications
• Detailed specification for different items of work are drawn up by
• Specify the quality , quantity and proportion of materials and engineering department and printed to serve as a guide to
method of preparation and execution for that item of work department
• Physical, chemical , and electrical test if any required are described • And to refer it in the specification part of a tender paper to avoid
writing lengthy specification
• types of machinery ,equipments ,special tools and plants , their
method of operation • Specification of earthwork, concrete work, brickwork …..
• While writing detailed specification same order of sequence ,as • CPWD, PWD, Irrigation and waterways , railway department have
work is carried out is maintained their departmental standard specification ……..revised periodically
2
9/18/2019
Restricted specification
Open or manufacturers specification
• Specification of products given by manufacturers • material of an item of work is described and procurement among
some approved manufactures or brands of material is restricted
which state both physical and chemical properties
and other information of product
• Standard of materials such as plumbing , painting , fittings ….are
assured to be of certain degree of quality up to satisfaction of
owner
• Strength , weight, thickness, …..
• Composition of chemical components of products
• Steel, cement, pipes, valves, bricks…
General specification of first class building General specification of first class building
• Foundation and plinth : Brickwork in foundation and plinth shall be
of first class brick in cement or lime mortar over cement or lime
concrete
• Flooring : Mosaic flooring shall be provided in all floors including staircases
• Filling : Foundation trenches and plinth shall be filled with local sand
• Finishing : Inside and outside shall be 12 mm thick cement plastered .The
inside of the drawing , dining and bedroom shall be distempered and
• Damp proof course : DPC shall be 2.5 cm thick cement mortar with remaining portions whitewashed 3 coats .The outside shall be 2 coats
5% pudlo by weight of cement or other standard water proofing decorative waterproofing cement coating .Wall surface of lavatory shall be
covered with glazed tile up to top level of door
material
• Door and windows : Door and window frames shall be of seasoned teak
• Superstructure : first class brickwork in cement mortar wood and shutters of 3 cm thick teak wood panelling. Brass fittings shall be
provided .Doors and windows shall be varnished with french polish.
• Roofing : Roof shall be 10 cm thick RCC slab with 10cm average thick • Miscellaneous : Rain water pipes shall be of asbestos cement or cast iron ,
lime terracing over it finished with paint .All sanitary , water supply and electrical fittings shall be
of first class materials
3
9/18/2019
General specification of second class building General specification of second class building
• Foundation and plinth : Brickwork in foundation and plinth shall be
of first class brick in lime mortar over lime concrete
• Filling : Foundation trenches and plinth shall be filled with earth • Flooring : floor shall be 2.5cm cement concrete over 7.5cm lime
concrete
• Damp proof course : DPC shall be 2 cm thick cement mortar with 5% • Finishing : The inside walls shall be plastered with lime or cement
pudlo by weight of cement or other standard water proofing mortar , outside walls shall pointed or plastered with lime or
material cement mortar. Inside shall be white washed 3 coats and outside
colour washed 2 coats over one coat of white wash
• Superstructure : second class brickwork in mud mortar
• Door and windows : Door and window frames shall be of seasoned
teak wood and shutters of 4.5 cm thick shisham or deodar wood
• Roofing : Roof shall be flat terraced roof or RB roof panelling. Iron fittings shall be provided .Doors and windows shall be
painted with 2 coats
First class bricks
First class bricks
• Bricks should be moulded from good earth , free from all traces of • They shall be homogenous in texture and emit a clear ringing sound
saltpetre or other salts on being struck
• They should be of uniform deep red , cherry or copper colour , • Dry bricks shall not absorb more than one sixth of their weight
thoroughly burnt without being vitrified
when immersed in water for one hour
• They should be hard , sound and of uniform size and shape having
each two adjacent plane surfaces at true right angles • They should not break when two bricks in hands are struck together
or dropped from 1.3 ht from ground
• Bricks should be free from cracks , chips, flaws or hump of any kind
• Bricks should be of standard dimensions as per ISI 19 x 9 x 9 cm
• They should not show efflorescence either in dry state or after
soaking in water
4
9/18/2019
Sand
Cement
• Cement used for reinforced concrete works shall be of ordinary • The fine aggregate shall conform to IS 383‐1963
Portland cement or rapid hardening portland
• cement or blast furnace slag cement or high alumina cement • It shall be clean , sharp, heavy and gritty to touch
Sand
Water
• If the sample of sand contain more than 4 to 6 percent of clay , it
should be washed thoroughly
• In concrete works water used for both mixing and curing shall be
free from injurious amount of deleterious materials.
• Sand should be perfectly dry before it is used . Otherwise bulking
of sand should be taken into account
• Potable water is considered satisfactory for mixing and curing
• Sand for all concrete works shall be coarse .It should not pass concrete
through IS sieve no: 480 (4.75mm) and retain on No: 15 sieve
(5.5 mm )