Estimate Program
Estimate Program
80)
0.80
CONCRETE
area = 0.8 x 0.8
= 0.6 sq.m.
thickness = 0.25 m
# of footing = 8 pcs.
0.80
VolCF = 1.28 cu.m.
REINFORCEMENT
LCB = l- [cc x 2] + 9d
= 0.794 m
# of CB/ 6m RSB = 7.55668 pcs
= 7 pcs
TOTAL LCB = 80 pcs. 0.25
SECTION 0.075
no. of 6m RSB = Lt/(# of CB/6m RSB)
= 11.4286 pcs.
no. of 6m RSB = 12 pcs.
TIE WIRES
LT = r x j x (alow.)
= 8.25 m
no. of pcs. = 8 pcs
LT = 66 m
LT /kilogram = 1.25 kls.
= 2 kls.
REINFORCEMENT DETAILS
dia. of bar (d) = 0.016 m
concrete cover (cc) = 0.075 m
CONCRETE 0.30
area = 0.30 x 0.30
= 0.09 sq. m.
height = 3.89 m
0.30
Volume = 0.35 cu.m.
no. of column = 4 pcs
VOLcolumn = 1.4004 cu.m.
3.89
Main Reinforcement
eff. length = h+(t-cc2-d1*2)
eff. length = 4.03 m
#of ver. Bars = 4 pcs
# of column = 4 pcs
LT = 64.53 lm
# of 6m RSB = LT/6
# of 6m RSB = 10.75 pcs
# of 6m RSB = 11 pcs
Lateral Ties
LT = 2(A+B)+20d
LT = 0.96 m
# ties / 6m RSB = 6/eff length
= 6.25 pcs
# ties / 6m RSB = 6 pcs therefore: 12.6036 bags of CEMENT
# of ties = (eff height/spacing)+1 0.7002 cu.m. of SAND
= 42.89 pcs 1.4004 cu.m. of GRAVEL
# of ties = 42 pcs 11 pcs. of 16 mm Ø RSB
# of column = 4 pcs 28 pcs. of 10 mm Ø RSB
# 6m RSB = 28.00 pcs 5 kls. of # 16 wire
# 6m RSB = 28 pcs
Tie Wires
LT = (# of ties) x (# of vert. bars) x r x (allow)
= 55.44 m
no. of pcs. = 4 pcs
LT = 221.76 m
LT /kilogram = 4.18 kls.
= 5 kls.
CONCRETE 0.20
area = 0.20 x 0.30
= 0.06 sq. m.
height = 4.1 m
0.30
Volume = 0.25 cu.m.
no. of column = 4 pcs
VOLcolumn = 0.984 cu.m.
4.1
Main Reinforcement
eff. length = h+(t-cc2-d1*2)
eff. length = 4.24 m
#of ver. Bars = 4 pcs
# of column = 4 pcs
LT = 67.89 lm
# of 6m RSB = LT/6
# of 6m RSB = 11.31 pcs
# of 6m RSB = 12 pcs
Lateral Ties
LT = 2(A+B)+20d
LT = 0.76 m
# ties / 6m RSB = 6/eff length
= 7.89 pcs
# ties / 6m RSB = 7 pcs therefore: 8.856 bags of CEMENT
# of ties = (eff height/spacing)+1 0.492 cu.m. of SAND
= 44.29 pcs 0.984 cu.m. of GRAVEL
# of ties = 44 pcs 12 pcs. of 16 mm Ø RSB
# of column = 4 pcs 26 pcs. of 10 mm Ø RSB
# 6m RSB = 25.14 pcs 5 kls. of # 16 wire
# 6m RSB = 26 pcs
Tie Wires
LT = (# of ties) x (# of vert. bars) x r x (allow)
= 58.08 m
no. of pcs. = 4 pcs
LT = 232.32 m
LT /kilogram = 4.38 kls.
= 5 kls.
COLUMN DETAILS
length (l) = 0.30 m
width (w) = 0.30 m
height (h) = 3.89 m
effective length = h+(t-cc2-d1*2)
effective length = 4.03 m
no. of column = 4 pcs
thicknes col.footing (t) = 0.25 m
VERTICAL REINFORCEMENT DETAILS
dia. of bar (d1) = 0.016 m
concrete cover for col. (cc1) = 0.045 m
concrete cover col.footing (cc2) 0.075 m
# of vertical bars (d1) = 4 pcs
0.15
Volume = 0.53 cu.m.
no. of wf = 1 pcs
VOLbeam = 0.5292 cu.m.
8.82
Continuous
length = 8.82 m
#of cont. Bars = 3 pcs
# of wf = 1 pcs
LT = 26.46 lm
# of 6m RSB = LT/6
# of 6m RSB = 4.41 pcs
# of 6m RSB = 5 pcs
Trans. Bars
LT = 2(A+B)+20d
LT = 0.536 m
# ties / 6m RSB = 6/eff length
= 11.19 pcs
# ties / 6m RSB = 11 pcs therefore: 4.7628 bags of CEMENT
# of ties = (eff height/spacing)+1 0.2646 cu.m. of SAND
= 36.28 pcs 0.5292 cu.m. of GRAVEL
# of ties = 36 pcs 5 pcs. of 12 mm Ø RSB
# of beam = 1 pcs 4 pcs. of 10 mm Ø RSB
# 6m RSB = 3.27 pcs 2 kls. of # 16 wire
# 6m RSB = 4 pcs
Tie Wires
LT = (# of ties) x (# of hor. bars) x r x (allow)
= 95.04 m
no. of pcs. = 1 pcs
LT = 95.04 m
LT /kilogram = 1.79 kls.
= 2 kls.
BEAM DETAILS COLUMN DETAILS
length (l) = 0.40 m length (l) = 0.30 m
width (w) = 0.15 m width (w) = 0.30 m
length (h) = 8.82 m
eff length = h-2x(dim of col/2)
effective length = 8.52 m
no. of beam = 1 pcs
HORIZONTAL REINFORCEMENT DETAILS
dia. of bar (d1) = 0.016 m
concrete cover for col. (cc1) = 0.04 m
# of horizontal bars = 8 pcs
STIRRUPS DETAILS
eff length (A) = 0.30 m
eff width (B) = 0.05 m
dia. of bar (d) = 0.012 m
ties spacing = 0.25 m
TIE WIRES DETAILS
Gage # = 16
alowance = 10%
1.1
min. length (r) = 0.3 m
kilogram/meter = 53 kls.
ROOF BEAM (with length of 3.65)
CONCRETE 0.20
area = 0.20 x 0.30
= 0.06 sq. m.
eff length = 7.02 m
0.30
Volume = 0.42 cu.m.
no. of beam = 1 pcs
VOLbeam = 0.4212 cu.m.
7.32
Main Reinforcement
length = 7.32 m
#of hor. Bars = 4 pcs
# of beam = 1 pcs
LT = 29.28 lm
# of 6m RSB = LT/6
# of 6m RSB = 4.88 pcs
# of 6m RSB = 5 pcs
Stirrups
LT = 2(A+B)+20d
LT = 0.8 m
# ties / 6m RSB = 6/eff length
= 7.50 pcs
# ties / 6m RSB = 7 pcs therefore: 3.7908 bags of CEMENT
# of ties = (eff height/spacing)+1 0.2106 cu.m. of SAND
= 49.80 pcs 0.4212 cu.m. of GRAVEL
# of ties = 49 pcs 5 pcs. of 16 mm Ø RSB
# of beam = 1 pcs 7 pcs. of 10 mm Ø RSB
# 6m RSB = 7.00 pcs 2 kls. of # 16 wire
# 6m RSB = 7 pcs
Tie Wires
LT = (# of ties) x (# of hor. bars) x r x (allow)
= 64.68 m
no. of pcs. = 1 pcs
LT = 64.68 m
LT /kilogram = 1.22 kls.
= 2 kls.
BEAM DETAILS COLUMN DETAILS
length (l) = 0.20 m length (l) = 0.30 m
width (w) = 0.30 m width (w) = 0.30 m
length (h) = 7.32 m
eff length = h-2x(dim of col/2)
effective length = 7.02 m
no. of beam = 1 pcs
HORIZONTAL REINFORCEMENT DETAILS
dia. of bar (d1) = 0.016 m
concrete cover for col. (cc1) = 0.04 m
# of horizontal bars = 4 pcs
STIRRUPS DETAILS
eff length (A) = 0.10 m
eff width (B) = 0.20 m
dia. of bar (d) = 0.010 m
ties spacing = 0.15 m
TIE WIRES DETAILS
Gage # = 16
alowance = 10%
1.1
min. length (r) = 0.3 m
kilogram/meter = 53 kls.
WALL
CONCRETE
AREAWALL = 19.995 sq.m.
REINFORCEMENT
ver. bars = area x multiplier Total no. of
ver. bars = 42.5894 pcs CHB = 250 pcs 5"
RSB = 14.2631 pcs 10mmØ RSB
hor. bars = area x multiplier Cement = 20.35491 bags
hor. bars = 42.9893 pcs Sand = 1.687578 cu.m
7.755
16.836
4.596
19.995
SLAB
CONCRETE
area = 2.0 x 1.76
= 3.5 sq.m.
thickness = 0.02 m
VolSLAB = 0.0528 cu.m.
REINFORCEMENT
vertical bars 2
length = 2
no of bars = (width/spacing)+1
no of bars = 6.0286 pcs.
no of bars = 6 pcs.
1.76
Lt = 12 lm
no of 6m RSB = Lt/6
no of 6m RSB = 2 pcs
no of 6m RSB = 2 pcs
horizontal bars
width = 1.76
no of bars = (length/spacing)+1
no of bars = 6.7143 pcs.
no of bars = 6 pcs.
Lt = 10.56 lm
no of 6m RSB = Lt/6
no of 6m RSB = 1.76 pcs
no of 6m RSB = 2 pcs
COLUMN 0.30
perimeter = 2(a+b) + .20
= ( 0.30 + 0.30 ) * 2 + 0.2
0.30
= 1.4 m
height = 3.89 m
no. of columns = 1
area = 5.446 sq.m
3.89
scaffold and staging
height total = 3.89 m
vertical = 27.23 bd.f
hor. = 123.2 bd.f
FORM WORKS
COLUMN 0.20
perimeter = 2(a+b) + .20
= ( 0.20 + 0.30 ) * 2 + 0.2
0.30
= 1.2 m
height = 4.1 m
no. of columns = 2
area = 9.84 sq.m
column
board f. per m ht
Hor. Brace
21 11.7
31.67 17.5
42.25 23.35
beam
board f. per m ht
Hor.
4.7
7
9.35
post
12mm (1/2")
20.33
30.5
column
board f. per m ht
Hor. Brace
21 11.7
31.67 17.5
42.25 23.35
beam
board f. per m ht
Hor.
4.7
7
9.35
Plastering
Wall Column Beam
area1 = 20.00 sq.m. area1 = 5.15 sq.m. area1 = 2.16 sq.m.
no of wall with the same dimesnions no of col. with the same dimesnions no of beam with the same dimesnions
= 1 = 1 = 1
area1 = 19.995 sq.m. area1 = 5.152 sq.m. area1 = 2.16 sq.m.
no of side to be plastered no of side to be plastered no of side to be plastered
= 2 = 1 = 1
area1 = 39.99 sq.m. area1 = 5.152 sq.m. area1 = 2.16 sq.m.
Areatotal = 4 sq.m.
101
PROJECT:
LOCATION:
OWNER:
BILL OF MATERIALS
IV CONCRETE WORKS
Washed Sand (S-1) cu.m 290.00
Washed Gravel (3/4) cu.m 325.00
Portland Cement bags 210.00
Sahara Waterproofing Compound kg 40.00
SUB-TOTAL
V RSB
Deformed Bar 16mm dia x 6.00m pcs. 336.00
Deformed Bar 12mm dia x 6.00m pcs. 337.00
Deformed Bar 10mm dia x 6.00m pcs. 130.00
Ga#16 G.I. Wire kg 80.00
SUB-TOTAL
VI DOORS AND WINDOWS
D-1 Panel type door 60x210cm set 5000
wooden door jamb 2x6" (60x210cm) set 1100
W-1 Awning window (Analok) 1.10x0.30m sets 889
W-2 Awning type window (Analok) 0.80x1.10m set 2368
W-3 Sliding window (Analok) 0.40x1.10m sets 1184
**SUB-TOTAL
X HARDWARES
Entrance set w/ dead bolt (stanley) set 3500.00
Euro Door lock set 1950.00
4"x4" loose pin hinges sets 150.00
door stopper pc 450.00
SUB-TOTAL
SUMMARY
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2,900.00
2,100.00
1,625.00
-
-
-
-
-
-
-
-
-
-
-
6,625.00
-
-
-
-
-
-
-
-
-
-
-
13,200.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
13,200.00
SUB-TOTAL
-
-
-
-
-
-
-
6,625.00
-
-
13,200.00
-
19,825.00
5,947.50
-
25,772.50