1.may - 2018 (Credit Pattern)
1.may - 2018 (Credit Pattern)
5
3:0
T.E. (Mechanical)
3:5
METROLOGY AND QUALITY CONTROL
81
5/2 1
9
(2015 Pattern)
01
Time : 2½ Hours]
8 1 30 [Max. Marks : 70
.23 01
4/0
Instructions to the candidates:
P
1) Answer Q1 or Q2, Q3 or Q4, Q5 or Q6, Q7 or Q8.
8.2 G
5
5) Figures to the right indicate full marks.
3:0
49
3:5
Q1) a) Differentiate between Precision & Accuracy with Suitable examples. [5]
81
91
01
b) Draw a neat sketch of micrometer & how to calculate least count of
30
5/2
OR
GP
81
Q2) a) a) Explain any one method of assessing the surface finish. [5]
.23
CE
5
.24
3:0
Q3) a) Explain laser interferometer & its application. [5]
49
3:5
OR
01
30
5/2
Q4) a) State & Explain Taylors principle of gauge design with example. [5]
01
4/0
b) Explain method of measuring effective diameter using two wires with neat
GP
81
sketch. [5]
.23
CE
16
8.2
b) State seven new quality tools. Explain any three in detail. [8]
49
OR
P.T.O.
Q6) a) What is cost of quality? Explain Cost of failure, Cost of appraisal &
cost of prevention. [8]
b) What is initial planning for quality? Explain in details. [8]
5
3:0
3:5
Q7) a) What are advantages of sampling inspection over 100% inspection?
81
5/2 1
Explain the difference between single sampling & double sampling plan.
9
01
[8]
b) 8 1 30
Following is the record for successive lots of part being produced by
.23 01
4/0
plastic molding press. As each lot is come off the line a random sample
P
of 150 pieces were inspected (results are expressed to the nearest 0.1%)
8.2 G
Calculate p, Control limits & plot control chart and comment. [8]
.24 CE
16
5
3:0
2 150 8
49
3:5
3 150 2
81
91
4 150 4
01
30
5/2
5 150 4
01
4/0
6 150 6
GP
81
7 150 10
.23
CE
8 150 4
16
8.2
9 150 6
5
.24
3:0
10 150 8
49
3:5
OR
81
91
b) Explain single sampling plan with flow chart. For the given data
5/2
01
calculate sample size and AOQ for single sampling plan [8]
4/0
[5353]-515 2
e)
a)
c)
d)
b)
[5353]-515
49
Kanban
.24 CE FMECA
TS-16949
8.2 G
16 P
Zero defects
Quality Audit
.23 01
8 1 30
4/0 9
5/2 1
49
.24 CE 01
Q9) Write short note on (Any three) :
8.2 GP 81
16 3:5
3
.23 01 3:0
81 30 5
4/0 91 eee
49 5/2
.24 CE 01
8.2 GP 81
16 3:5
.23 01 3:0
81 30 5
4/0 91
5/2
01
81
3:5
3:0
5
[18]