The document discusses various concepts related to software development including: 1. A feasibility study involves testing technical, economic, operational, and schedule feasibility to determine if a project should proceed. 2. The waterfall model is a commonly used sequential software development process where each phase must be completed before the next begins, and modifications can only be made to previous phases. 3. A data flow diagram graphically represents how a system transforms input data and uses symbols like processes, data flows, data stores, and external entities. It has different levels like context, first, and second level DFDs.

Uploaded by

Jinal Hirani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
264 views

Feasi Info

The document discusses various concepts related to software development including: 1. A feasibility study involves testing technical, economic, operational, and schedule feasibility to determine if a project should proceed. 2. The waterfall model is a commonly used sequential software development process where each phase must be completed before the next begins, and modifications can only be made to previous phases. 3. A data flow diagram graphically represents how a system transforms input data and uses symbols like processes, data flows, data stores, and external entities. It has different levels like context, first, and second level DFDs.

Uploaded by

Jinal Hirani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Feasibility study

 It is a series of test to check whether we should proceed further


or not.
 There are four types of feasibility study.

1. Technical feasibility
 A system request technical feasibility if the organization has
resources to develop or purchase an operating system.

2. Economical feasibility
 It means that the projected benefits of the proposed system
considered TCO-total cost of ownership which includes cost like
development, maintenance and setup.

3. Operational feasibility
 It means that the proposed system will be used effectively after
it has been develop.

4. Schedule feasibility
 It means that a project can be implemented in a specified type.

Waterfall model
 It is commonly used software development process model.
 That is a sequence of activities working from top to bottom.
 The diagram shows some arrow pointing upwards and
downwards.
Feasibility study

Requirement gathering

Analysis

System design

Program design

Coding

Testing

Implementation

 It is indicate that the next activity can only be started when first
is completed.
 The back arrow indicates that we can modify only previous
activity if some changes are required.
 There are no. of activities in waterfall model.
1. Feasibility study
 It is a series of test to check whether we should proceed
further or not.
2. Requirement gathering
 Requirement from client is collected.
3. Analysis
 It is done for the system to be develop.
4. System design
 The outline plan for the entire system is created.
5. Program design
 Individual modules are design in detail.
6. Coding
 The programming is done to implement different modules
of the system.
7. Testing
 Individual modules are tested and integrated to test the
entire system.
8. Implementation
 The system is implemented on some hardware platform.

Data flow diagram (DFD)


 It is a graphical representation to describe an information.
 It uses various symbols to show how system transforms
input data into useful.
 It does not show program logic.

Components
 Process
 Data flow
 Data store
 External entity

0 level OR Context level DFD


 It describes the information systems and its related
entities
 It does not include data store.

1 st level DFD
 It describes major processes of the system with data
store.

2 nd level DFD
 It is used when processes can be extended to sub
processes.

You might also like