This document is a checklist used to track changes across four main categories - Man, Machine, Material, and Method - for various processes in a manufacturing line. It includes boxes to check Yes or No for each category of change and space to record the date. There are sections for multiple lines and shifts to record information.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
720 views6 pages
4M Change Management-AL Check Sheet
This document is a checklist used to track changes across four main categories - Man, Machine, Material, and Method - for various processes in a manufacturing line. It includes boxes to check Yes or No for each category of change and space to record the date. There are sections for multiple lines and shifts to record information.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6
4M Change Management-AL Check Sheet
4M Check Point Y /N Date
Contract/ Temporary Manpower Extended shift working Skill level change / Upgrade Operator change (in between shift) MAN
Quality awareness for Customer Complaints
Operator Joins after Planned leave Operator Awareness wrt Process Parameters Safety Awareness Others (if specify) Tool & Die Change Jig & Fixture Change Removal / Addition of Poka-Yoke M/C & Testing Rig Parameter Change MACHINE
Machine start up with fresh cycle (Power failure etc)
Machine or Fixture under gone any maintenance Inspection Equipment Change / Breakdown EOL Equipment spec or parameter change Others (if specify) Process Sequence Change (Verification Reqd) Sub assembly process change (Verification Reqd) Packaging & Transportation mode change If any changes in Inspection method & frequency Limit sample change METHOD
Process Parameter Change (New or Additional)
Adequacy of Measuing instruments Fixture & Gauges condition & Calibration. Instrument error & breakdown Effectiveness of Poka Yoke (Woring condition) Others (if specify) Raw material different Spec / Grade Changes in Raw Material Source MATERIAL
Child-part change or any deviation
Any Change through ECN Changes to the existing tooling, jigs & fixtures Others (if specify) Line/Cell Name: Line Actions / Contols Reviewed Approved 4M Change Control-Wabco, Chennai Dt / Shift: Man A B C MC A B C MET A B C MAT A B C OTH A B C Prod. Process: Bearing Pressing Cyl.Greasing & Seal Cylinder sub assy Flange sub assy Twist lock station Sub Assy Testing Clampring assy Endfitting station Dry leak testing Wet leak testing Final assy Retightening station PDI & Packing Leader Mfg Line: L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Man Machine Material Method Others
Dt / Shift: Man A B C MC A B C MET A B C MAT A B C OTH A B C
Prod. Process: Bearing Pressing Cyl.Greasing & Seal Cylinder Sub Assy Flange sub assy Twist lock station Sub Assy Testing Clampring assy Endfitting station Dry leak testing Wet leak testing Final assy Retightening station PDI & Packing Leader Mfg Line: L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Man Machine Material Method Others Dt / Shift: Man A B C MC A B C MET A B C MAT A B C OTH A B C Prod. Process: Bearing Pressing Cyl.Greasing & Seal Cylinder Sub Assy Flange Sub Assy Twist lock station Sub Assy Testing Clampring assy Endfitting station Dry leak testing Wet leak testing Final assy Retightening station PDI & Packing Leader Mfg Line: L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Man Machine Material Method Others
Dt / Shift: Man A B C MC A B C MET A B C MAT A B C OTH A B C
Prod. Process: Bearing Pressing Cyl.Greasing & Seal Cylinder sub assy Flange sub assy Twist lock station Sub Assy Testing Clampring assy Endfitting station Dry leak testing Wet leak testing Final assy Retightening station PDI & Packing Leader Mfg Line: L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Man Machine Material Method Others
Dt / Shift: Man A B C MC A B C MET A B C MAT A B C OTH A B C
Prod. Process: Bearing Pressing Cyl.Greasing & Seal Cylinder sub assy Flange sub assy Twist lock station Sub Assy Testing Clampring assy Endfitting station Dry leak testing Wet leak testing Final assy Retightening station PDI & Packing Leader Mfg Line: L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Man Machine Material Method Others
Dt / Shift: Man A B C MC A B C MET A B C MAT A B C OTH A B C
Prod. Process: Bearing Pressing Cyl.Greasing & Seal Cylinder sub assy Flange sub assy Twist lock station Sub Assy Testing Clampring assy Endfitting station Dry leak testing Wet leak testing Final assy Retightening station PDI & Packing Leader Mfg Line: L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Man Machine Material Method Others