The document provides a summary estimate for providing a single village water scheme to Lingareddy Kottala Village in YSR District. The estimate includes 2 items: 1) Providing drinking water supply and 2) Provision for unseen items such as price increases. It was prepared by the Assistant Executive Engineer of the Rural Water Supply and Sanitation Sub Division of Proddatur.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
388 views24 pages

RCC Railing To OHSR

The document provides a summary estimate for providing a single village water scheme to Lingareddy Kottala Village in YSR District. The estimate includes 2 items: 1) Providing drinking water supply and 2) Provision for unseen items such as price increases. It was prepared by the Assistant Executive Engineer of the Rural Water Supply and Sanitation Sub Division of Proddatur.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 24

GENERAL ABSTRACT ESTIMATE

Name of Work: Providing Single Village Scheme to Lingareddy Kottala Village of Proddatur Mandal in YSR

Sl.No. Description of Item Quantity

1 Providing Drinking water supply as per sub estimate 1

2 Provision for Unseen items such as increase in power charges, road crossings,
escalation of prices, execution adjustments

Executive Engineer Dy.Executive Engineer Asst. Executive Engin


RWS & S Division RWS & S Sub division RWS & S Sub divisio
Pulivendula Produttur Proddutur

Project Manager
DPSU, APRWSSP, Kadapa
AL ABSTRACT ESTIMATE

Lingareddy Kottala Village of Proddatur Mandal in YSR District

Rate Amount

#REF! #REF!

Total Rs #REF!

Asst. Executive Engineer


RWS & S Sub division
Comprehensive Planning of Water supply Service
Final Detailed Project Report
Improvements in Vizianagaram Municipality

LABOUR RATES (2011-12)

Basic Rate of Labour


Sl No. CATEGORY OF WORKER

I. SKILLED CATEGORY:
1 Bar bender 300.00
2 Black smith / Tin smith / Rivetor 285.00
3 Blaster ( Licensed ) 310.00
4 Carpenter Cl- I 285.00
5 Electrician ( Licensed ) 310.00
6 Fitter Cl- I 285.00
7 Floor Polisher / Tile Layer 285.00
8 Foreman 310.00
9 Gauge reader 260.00
Maistry / Work Inspector with Non-technical Qualification
10 275.00
SSLC/SSC/HSC
11 Mason Cl- I / Brick layer Cl- I 285.00
12 Mechanic Cl- I 285.00
13 Operator Air compressor / DG set 285.00
14 Operator Batching plant 310.00
15 Operator Bus/Ambulance/ Lorry/ Tanker 285.00
16 Operator Concrete / Asphalt mixer 285.00
17 Operator Concrete / Asphalt paver 285.00
18 Operator Concrete pump / Placer/ ice plant 285.00
19 Operator Core drilling machine 310.00
20 Operator Crane/ Tower crane/ Cable way 310.00
21 Operator Drilling jumbo / Loco / Winch 285.00
22 Operator Grouting/ Guniting/ Shotcreting 285.00
23 Operator Jackhammer/Pneumatic tamper 285.00
24 Operator Pump / Ventilation fan 285.00
25 Operator Lathe/Drilling/Shearing machine 310.00
26 Operator Bending / Planing machine 285.00
27 Operator Road roller 285.00
28 Operator Shovel / Scraper / Dozer 310.00
29 Operator Spillway / Sluice gate 285.00
30 Operator Crusher / Conveyor / Mucker 285.00
31 Operator Tipper / Dumper / Transit mixer 310.00
32 Operator Concrete vibrator 285.00
33 Operator Vibratory plain / pad foot roller 285.00
34 Operator Wagon drill / Drifter 310.00
35 Painter Cl- I 300.00
36 Plumber ( Licensed ) / Pipe fitter 285.00
37 Sarang / Khalasi 285.00
38 Spun pipe moulder 285.00
39 Stone chiseller CI- I / Stone cutter Cl- l 285.00
40 Struct. steel Fabricator / Marker / Erector 310.00
41 Welder / Gas Cutter 285.00
42 Welder (X-ray quality) 310.00
Andhra pradesh Municipal Voyants Solutions Pvt Ltd
Development Project (APMDP)
Comprehensive Planning of Water supply Service
Final Detailed Project Report
Improvements in Vizianagaram Municipality

LABOUR RATES (2011-12)

Basic Rate of Labour


Sl No. CATEGORY OF WORKER

43 Well Sinker 310.00

Andhra pradesh Municipal Voyants Solutions Pvt Ltd


Development Project (APMDP)
Comprehensive Planning of Water supply Service
Final Detailed Project Report
Improvements in Vizianagaram Municipality

LABOUR RATES (2011-12)

Basic Rate of Labour


Sl No. CATEGORY OF WORKER

II. SEMI SKILLED CATEGORY:


1 Asphalt Sprayer / Boiler attendant 260.00
2 Bhisti 260.00
3 Boatman with boat 272.00
4 Carpenter Cl- II / Erector shuttering 260.00
5 Cartman with double bullock cart 305.00
6 Cartman with single bullock cart 282.00
7 Chavali / Navagani 260.00
8 Crowbarman / Jumper man 260.00
9 Fitter Cl- II 260.00
10 Gang man / Head / Survey mazdoor 260.00
11 Gardener / Trained mali 260.00
12 Helper Air compressor / DG set 260.00
13 Helper Batching plant 260.00
14 Helper Blasting 260.00
15 Helper Bus/ Ambulance/ Lorry/ Tanker 260.00
16 Helper Bending/Shearing/Planing machine 260.00
17 Helper Carpenter 260.00
18 Helper Concrete / Asphalt mixer 260.00
19 Helper Concrete / Asphalt paver 260.00
20 Helper Core drilling machine 260.00
21 Helper Crane/ Tower crane/ Cable way 260.00
22 Helper Drilling jumbo / Loco / Winch 260.00
23 Helper Fitter / Fabrication 260.00
24 Helper Grouting/ Guniting/ Shotcreting 260.00
25 Helper Jack hammer / Pneumatic tamper 260.00
26 Helper Laboratory / Instrumentation 260.00
27 Helper Road roller 260.00
28 Helper Shovel / Scraper / Dozer 260.00
29 Helper Crusher / Conveyor / Mucker 260.00
30 Helper Tipper / Dumper/ Transit mixer 260.00
31 Helper Vibrator 260.00
32 Helper Vibratory plain/ pad foot roller 260.00
33 Helper Wagon drill/ Drifter 260.00
34 Lineman Electric / Telephone 260.00
35 Mason Cl- ll / Brick layer Cl-II 285.00
36 Mechanic Cl- II 260.00
37 Painter Cl- II 260.00
38 Patkari / Neeraganti / Sowdy 260.00
39 Stone Chiseller Cl- II 260.00
40 Stone breaker / Hammer man 260.00
41 Valve man / Canal sluice operator 260.00

Andhra pradesh Municipal Voyants Solutions Pvt Ltd


Development Project (APMDP)
Comprehensive Planning of Water supply Service
Final Detailed Project Report
Improvements in Vizianagaram Municipality

LABOUR RATES (2011-12)

Basic Rate of Labour


Sl No. CATEGORY OF WORKER

III. UN-SKILLED CATEGORY:


1 Cement / Asphalt handling mazdoor 215.00
2 Civic worker 215.00
3 Heavy mazdoor 215.00
4 Light mazdoor 215.00
5 Watchman 215.00
IV. OTHER CATEGORY:
1 Care-taker / conductor / Lift attender 260.00
2 Cook / Mess man 260.00
3 Dhobi 260.00
4 Diploma Engineer / Surveyor 400.00
5 Diver with headgear 317.00
6 Graduate / Laboratory Assistant 317.00
7 Graduate Engineer/ Geologist 500.00
8 Horticulture Assistant / Photographer 275.00
9 ITI certificate holder / Tracer / Printer 325.00
10 Literate mazdoor 260.00
11 Stenographer / Computer Operator 365.00
12 Telephone / Wireless Operator 325.00
13 Typist / Job Typist 325.00
NEW ITEMS:
14 CAD operator with Diploma in Engineering/General degree wit 400.00
15 Jeep Driver 310.00
16 Data Processing Operator 450.00

Andhra pradesh Municipal Voyants Solutions Pvt Ltd


Development Project (APMDP)
Comprehensive Planning of Water supply Service
Final Detailed Project Report
Improvements in Vizianagaram Municipality

HIRE CHARGES OF MACHINERY


FOR THE YEAR : 2011-12
Hire Fuel Crew
S.No Description of machinery Unit charge in charge in Charge in Total in Rs
Rs Rs Rs.
1 2 3 4 5 6 7
1 Agitator car / Transit mixer 2 cum Hour 1467.20
2 Air compressor 5 cmm ( electric ) Hour 318.90
3 Air compressor 7 cmm ( diesel ) Hour 871.40
4 Air compressor 7 cmm ( electric ) Hour 391.70
5 Air compressor 8.5 cmm ( diesel Hour 1042.50
6 Air compressor 8.5 cmm ( electric) Hour 455.40
7 Air compressor 15 cmm ( electric) Hour 718.70
8 Angle Dozer 90 hp Hour 1881.00
9 Batching plant 0.5 cum Hour 364.80
10 Batching plant 2 x 1.00 cum Hour 646.30
11 Batching plant 2 x 1.50 cum Hour 770.40
12 Bending machine 3000 x 12 mm Hour 159.90
13 Clamp shell and hoisting ropes Hour 4.20
14 Concrete bucket 1.5 cum Hour 12.80
15 Concrete hand mixer 45 / 30 ltr Hour 3.90
16 Concrete mixer 300 / 200 ( diesel) Hour 248.40
17 Concrete mixer 300 / 200 ltr ( electric) Hour 203.00
18 Concrete mixer 600 / 400 ( diesel) Hour 342.50
19 Concrete mixer 600 / 400 ltr ( electric Hour 246.50
20 Concrete paver 100 sqm / hr Hour 560.00
21 Convey mucker Hour 922.90
22 Core drilling machine Hour 611.00
23 Diesel generating set 30 KVA Hour 628.70
24 Diesel generating set 50 KVA Hour 890.30
25 Diesel Loco 45 hp Hour 767.80
26 Dewatering pump 5 hp ( diesel ) Hour 141.40
27 Dewatering pump 5 hp ( electric ) Hour 75.60
28 Dewatering pump 10 hp ( diesel ) Hour 207.10
29 Dewatering pump 10 hp ( electric Hour 96.90
30 Dewatering pump 20 hp ( diesel ) Hour 356.90
31 Dewatering pump 20 hp ( electric Hour 140.10
32 Drifter Hour 436.70
33 Drilling jumbo Hour 437.60
34 Dumper 4.5 cum Hour 853.10
35 Geophysical Electric resistivity meter Hour 62.90
36 Grouting pump Hour 209.70
37 Guniting / sand blast equipment Hour 228.60
38 Ice plant & accessories 30 t / day Hour 797.50
39 Jack hammer Hour 226.10
40 Needle vibrator 40 mm ( petrol ) Hour 120.40
41 Needle vibrator 40 mm ( electric ) Hour 112.70

Andhra pradesh Municipal Voyants Solutions Pvt Ltd


Development Project (APMDP)
Comprehensive Planning of Water supply Service
Final Detailed Project Report
Improvements in Vizianagaram Municipality

Hire Fuel Crew


S.No Description of machinery Unit charge in charge in Charge in Total in Rs
Rs Rs Rs.
42 Needle vibrator 60 mm ( petrol ) Hour 126.80
43 Needle vibrator 60 mm ( electric ) Hour 115.70
44 Planing machine 4 m stroke Hour 287.30
45 Plate shearing machine upto 12 mm Hour 201.70
46 Pneumatic placer 0.5 cum Hour 191.90
47 Pneumatic tamper Hour 183.50
48 Pug cutting machine Hour 7.80
49 Pusher leg Hour 8.30
50 Road roller diesel 10 t Hour 844.40
51 Shovel 0.50 cum 75 hp Hour 1217.20
52 Shovel 0.85 cum 110 hp Hour 2009.50
53 Stationery derric crane Hour 66.20
54 Tipper 5 cum Hour 696.40
55 Tipping tub 1.5 cum Hour 33.60
56 Tower crane 5 tonne Hour 921.30
57 Transformer 250 KVA Hour 3932.50
58 Truck 10 t Hour 626.00
59 Truck mounted derric crane 5 t Hour 762.50
60 Upright drilling machine Hour 159.10
61 Ventilation fan 20 hp Hour 105.20
62 Vibratory pad foot roller 8 t Hour 1886.90
63 Wagon drill Hour 323.40
64 Water tanker 8000 ltr Hour 626.00
65 Welding set Hour 61.20
66 Winch 35 hp ( electric ) Hour 367.40
Rates as per amendment & as per quotation
68 Motor grader 110 HP 50 cum per hour Hour As per ENC(PH) approved quotation
Three wheel 80-100 kN static roller @10
69 Hour As per item No. 51 of hire charges
cum per hour
70 Tractor with rotovator Hour As per ENC(PH) approved quotation
71 Hydraulic excavator Hour As2009.5
per item No. 52 of hire charges
72 Weigh Botcher' Hour As per Batching plant rate
Air compressor, 210 cfm with 2 jack Hour
hammers
Air compressor Hour 871.4 Item No 3 (Page - 131)
2 jack hammers 410.8 Item No38 CSSR
1282.2
old rate 5% extra Total
Front end loader 1 cum bucket capacity
73 Hour 66 1386.00
@ 30 cum / hour
74 Dozer D-50 @ 50 cum per hour Hour 82 1718.00
75 Electrical Generator (a) 100 KVA Hour 46 966.00
76 Paver with elcetronic sensor Hour 127 2657.00
77 Plate compactor Hour 2 42.00

Andhra pradesh Municipal Voyants Solutions Pvt Ltd


Development Project (APMDP)
Comprehensive Planning of Water supply Service
Final Detailed Project Report
Improvements in Vizianagaram Municipality

Hire Fuel Crew


S.No Description of machinery Unit charge in charge in Charge in Total in Rs
Rs Rs Rs.
Joint Cutting Machine with 2-3 blades
78 Hour 250 5250.00
(for rigid pavement)
79 Concrete mixer 300/200 (diesel) Hour 248.4

Andhra pradesh Municipal Voyants Solutions Pvt Ltd


Development Project (APMDP)
LEAD STATEMENT

Description of Conveyanc
S.No Unit Source of supply
material e charges
(Excluding Add 25%
13.615% for Total
Lead in contractor Initial Blasting crushed Seiniorag amount
KMs profit) cost charges metal e charges (Rs.)
Pennar River
1 Sand for filling cum 38 438.41 95.00 0.00 0.00 50.00 583.41
Chennur
Penna River
2 Sand for mortor cum 38 438.41 95.00 0.00 0.00 50.00 583.41
Chennur
20 mm HBG SS
3 cum Muddanur 60 647.54 1036.00 70.00 259.00 75.00 2087.54
M/c Metal

4 Cement 1 MT local 3882 3882

5 Steel 1 MT local 42000 42000

Certified that the above leads are correct to the best of my knowledge

Assistant Engineer Deputy Executive Engineer


RWS&S Rajupalem Mandal RWS&S Sub division
Proddatur
DATA SHEET-II
1. PVC PIPES- Earth Work Data based on 2016-17 Common SSR
S.No Quantity Description of Item Rate Per Amount (Rs.)

Earth work excavation in B.C soils, Red Earth and ordinary gravelly soils for pipe line trench of size 0.7 X 1.00 Mt using 2/3 quantity with
1 machinery and 1/3 quantity with manual including cost of sand filling of 100 mm thick sand bed and refilling the trench with excavated earth
including all labour charges etc complete.,

Earth work with Mechanical means (machinery) of 2/3 quantity, rates as per
0.467 cum 82.53 1 cum 38.54
A.P standard data calculation

Earth work with manual of 1/3 quantity, rates as per A.P standard data
0.233 cum 127.40 1cum 29.68
calculation
Add 75% for narrow trenches on manual only 22.26
0.07 cum Sand for filling including cost, conveyance and seigniorage charges 583.41 1cum 40.84
0.07 cum Labour charges for sand filling (0.31 days X Rs.350) 108.50 1 cum 7.60
TOTAL 138.92

2. DI PIPES- Earth Work Data based on 2016-17 Common SSR


Earth work excavation in B.C soils, Red Earth and ordinary gravelly soils for pipe line trench of size 0.9 X 1.20 Mt using 2/3 quantity with
2
machinery and 1/3 quantity with manual and refilling the trench with excavated earth including all labour charges etc complete.,

Earth work with Mechanical means (machinery) of 2/3 quantity, rates as per
0.720 cum 82.53 1 cum 59.42
A.P standard data calculation

Earth work with manual of 1/3 quantity, rates as per A.P standard data
0.36 cum 127.40 1cum 45.86
calculation
TOTAL 105.29

Assistant Engineer Deputy Executive Engineer


RWS&S, Rajupalem (M) RWS&S, Sub-Division
Proddatur

Executive Engineer Superintending Engineer


RWS&S, Division RWS&S, Circle
Pulivendula Kadapa
DATA SHEET -III
PVC pipes - Earth work data based on 2016-17 Common SSR
Earth work excavation in all soils upto SDR for P.V.C pipes with 100 mm thick sand cushion and filling the excavated trench with excavated soils including lowering, layin
1 jointing and testing of pipe line but excluding cost of pipes & specials etc. complete

Trench size 0.50M X0.70 M 0.70m x 1.00m 0.80m x 1.10m


Pipe dia in mm = 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm

a Earth work (rate as per Data sheet-II) 138.92 138.92 126.27

Lowering, laying, jointing and testing to Hydraulic


b Test pressure for UPVC pressure pipes in ready made 7.08 8.66 9.84
trenches true to alignment and gradient including all
sundries but excluding cost and conveyance of pipes
from source of supply and jointing material as per
BIS No.7634 Part III- 1975 (rate as per data sheet- I)
Total 146.01 147.58 136.11

Assistant Engineer Deputy Executive Engineer Executive Engineer


RWS&S, Rajupalem(M) RWS&S Sub division RWS&S Division
Proddatur Pulivendula

Superintending Engineer
RWS&S, Circle Kadapa
s including lowering, laying,

1.10m
200 mm

ineer
sion
DATA SHEET - IV
PVC Pipes Data based on 2016-17 common SSR
PVC Resin rate: Rs.68825/- Per MT Cost of specials : 1.20 %

PVC Pipes of Guage 6 Kg/cm2


Earthwork with 2/3rd Machinary and 1/3rd Manual
Trench size 0.70m x 1.00m 0.80m x 1.10m
Pipe dia in mm = 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm
A) Materials component
Cost of PVC pipe (2016-17 SSR) 149.00 215.00 274.00
CED @ 12.50% 18.63 26.88 34.25
Cost of pipe specials @ 1.20% 1.79 2.58 3.29
Earth work excavation including laying,
jointing and testing of PVC pipes (from 146.01 147.58 136.11
data sheet - III)
Sub Total 315.42 392.03 447.65

Add contractors profit @ 13.615% 42.94 53.38 60.95

TOTAL (Rs.) 358.36 445.41 508.60

PVC Pipes of Guage 4 Kg/cm2


Earthwork with 2/3rd Machinary and 1/3rd Manual

Trench size 0.70m x 1.00m 0.80m x 1.10m


Pipe dia in mm = 75mm 90mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm
A) Materials component
Cost of pipe 104.00 151.00 197.00
CED @ 12.50% 13.00 19.00 25.00
Cost of specials (1.20%) 1.25 1.81 2.36
Earth work excavation including laying,
jointing and testing of PVC pipes (from
data sheet -III) 146.01 147.58 136.11
Sub-Total 264.25 319.39 360.47
Add contractors profit @ 13.615% 35.98 43.49 49.08

TOTAL (Rs.) 300.23 362.88 409.55


Assistant Engineer Deputy Executive Engineer Executive Engineer Superintending Engineer
RWS&S Rajupalem Mandal RWS&S Sub division RWS&S Division RWS&S, Circle, Kadapa
Proddatur Pulivendula
Detailed Estimate
Name of the Subwork : Providing CI Pipes and Specials to the OHSR's of Capacity 200000

Cast Iron Rate Rs. 58.00 Kg

Pig Iron Rate Rs. 29000 MT


S. Measurments
No. Description No. Qty. Units
L B D
1 Supply and Delivery of 80 mm dia CI D/F pipes 2mts
long 28 Nos
47 Kgs each
2 Supply and Delivery of 80 mm dia Bell Mouth 3 Nos
7.00 Kgs each
3 Supply and Delivery of 80 mm dia CI D/F pipes
0.6mts long 5 Nos
19.88 Kgs each
4 Supply and Delivery of 80 mm dia CI Tail Pieces
0.6mts long 2 Nos
7.4 Kgs each
5 Supply and Delivery of 80 mm dia CI 90* bends 2 Nos
13 Kgs each
6 Supply and Delivery of 80 mm dia CI Duck foot
bends 4 Nos
21 Kgs each
7 Supply and Delivery of 80 mm dia CI Semicircular
bends 1 Nos
25 Kgs each
8 Supply and Delivery 6 mm thick rubber packing for
Ci Joints 10 KG
9 Supply and Delivery of 80 mm dia CI Jointing
Materials Such as bolts and nuts etc 20 KG
Total
10 CED 14.42 On CI Specials

Executive Engineer Dy. Executive Engineer


RWS&S Kadapa RWS&S Proddatur
Project Manager
DPSU, APRWSSP, Kadapa
R's of Capacity 200000 lit

Amount
Rate Per
(Rs.)

2632.00 each 73696.00

406.00 each 1218.00

1079.18 each 5396.00

429.20 each 858.00

754.00 each 1508.00

1218.00 each 4872.00

1450.00 each 1450.00

73.00 Kg 730.00

89.00 Kg 1780.00
91508.00
13195.00
104703.00

Assistant Engineer
RWS&S Proddatur
DATA SHEET BASED ON SSR 2017-18

S.No Qnty Unit Description of item Rate (Rs.) Unit Rate (Rs.)

Cement concrete(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour
1
charges,seignorage charges etc complete.

0.9 cum 20mm HBG graded metal Rs. 2087.54 cum 1878.79
0.45 cum Sand for concrete Rs. 583.41 cum 262.53
400 Kgs Cement Rs. 3882.00 MT 1552.80
0.133 day 1st Class Mason Rs. 465.00 day 61.85
0.267 day 2nd Class Mason Rs. 420.00 day 112.14
3.6 day Mazdoor (Both Men and Women) Rs. 370.00 day 1332.00
1 hour Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity Rs. 352.50 hour 352.50 bldg.21-A
0.133 Liters Cost of Diesel for Miller Rs. 61.73 Liters 8.21
0.667 Liters Cost of Petrol for Vibrator 71.68 Liters 47.81
1.2 kl Water (including for curing) 77.00 kl 92.40
5701.03
Overheads & cp 13.615% 776.19
Total rate per cum 6477.22

VRCC (1:1.5:3) using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but
2
excluding cost of steel and its fabrication charges
1.00 Cum Cost of CC (1:1.5:3) 5701.03 1 Cum 5701.03
1.00 Cum Centering charges for RCC Pedestals 1068.00 1 Cum 1068.00
--- Sub-Total 6769.03
Overheads & cp 13.615% 921.60
Total 7690.63

Assistant Engineer Dy.Executive Engineer


RWS&S, Mydukur (M) RWS&S, Sub-Division
Mydukur
Estimate

Calculating cost of Executed quantities of RCC Railing of Staircase, Landing portion and on Top Slab of 20KL OHSR

S.No Description of Items Nos L B H Qnty Units Rate

Hand railing of Stair Case


1 using VRCC (1:1.5:3) with 1 X 1 24.1 0.075 0.08 0.1446 Cum 7690.63
20mm HBG metal

vertical standposts of
2 staircase using VRCC 1 X 49 0.55 0.785 0.01 0.21156 Cum 7690.63
(1:1.5:3) with 20mm HBG
metal

vertical standposts of
3 staircase using VRCC 1 X 13 0.98 0.785 0.01 0.10001 Cum 7690.63
(1:1.5:3) using 20mm HBG
metal on landing portion

vertical standposts of
4 staircase using VRCC 1 X 18 0.96 0.785 0.01 0.13557 Cum 7690.63
(1:1.5:3) using 20mm HBG
metal on Top slab

Top and Middle SS railing of


5 25 mm dia over Gallery 1 X 2 16.80 _ _ 43.68 Kg 331.00
(Landing)

6 Top and middle SS railing of 1 X 2 14.63 _ _ 38.038 Kg 331.00


25 mm dia over Top Slab
10 mm dia HYSD steel rods
7 for VRCC hand railing of stair 1 X 2 25 - - 30.8261 Kg 42.00
case

10 mm dia HYSD steel rods


8 for vertical VRCC stand posts 49 X 2 0.7 - - 42.2935 Kg 42.00
of stair case

10 mm dia HYSD steel rods


9 for vertical VRCC stand posts 2 X 13 1.20 - - 19.2355 Kg 42.00
on landing portion

10 mm dia HYSD steel rods


10 for vertical VRCC stand posts 2 X 18 1.20 - - 26.6338 Kg 42.00
on Top slab

TOTAL
nd on Top Slab of 20KL OHSR

Amount
Per
(Rs.)

1 Cum 1112

1 Cum 1627

1 Cum 769

1 Cum 1043

1 Kg 14458

1 Kg 12591

1 Kg 1295

1 Kg 1776

1 Kg 808

1 Kg 1119

36598