This document provides instructions for filling out a Non-Conformance Report (NCR). The NCR is used to document any non-conformances with the work. It includes sections to describe the non-conformance, its cause, the proposed disposition, approvals from management, and verification that the disposition was completed.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
324 views1 page
How To Fill A NCR: Non-Conformance Report
This document provides instructions for filling out a Non-Conformance Report (NCR). The NCR is used to document any non-conformances with the work. It includes sections to describe the non-conformance, its cause, the proposed disposition, approvals from management, and verification that the disposition was completed.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
HOW TO FILL A NCR
Workmanship The work is not done properly.
Number of NCR delivered by QC Manager Quality of
material The work is done according to Method the documents but not the right Non-Conformance Report Implementation way. NCR No .. Shop drawings The work is not done TRADE PACKAGE NO. CONTRACTOR conformity according to shop drawings WORKS There is an error in the shop Document drawings or in the method CAUSE : 1.Quality of Material 2. Methods Statement 3. Workmanship 4. Shop draw ings 5. Design or Documents statement implementation conformity REPORTED BY DATE RECORDED BY DATE
DETAILS OF NON-CONFORMANCE Description of what is not as per drawings, or
METHOD STATEMENT NO. DRWG. NO. Method statement, or procedure. LOCATION SAMPLE NO. Description of the Non Conformance:
Analysis of the causes: why did it happen?
Causes of the Non Conformance:
Manager in Charge and QC Manager
approve and record the Non Manager in Charge DATE Conformance finding CAR required : YES/NO QC Manager DATE
PROPOSED DISPOSITION PREPARED BY
DATE 1. Repair 2. Use as is 3. Rework 4. Replace Details: Manager in Charge and QC Manager approve and record the proposed disposition
Manager in Charge DATE
QC Manager DATE The Project Manager approves the total management of the Non APPROVAL : Project Manager Conformance and decides if the Comments Client approval is required
CLIENT APPROVAL REQUIRED YES/NO DATE SIGNED
Client Representative: DATE SIGNED
VERIFICATION OF COMPLETED DISPOSITION
NOTES The verification of the completed disposition is done by the PM and the Sign-off of NCR Client if required. DATE / / DATE / / NCR revision A: Sep 14