100% found this document useful (4 votes)
23K views2 pages

Blue Prism

The document discusses various concepts and components related to Blue Prism including: - The Navigate stage is used to launch an application in Object Studio. The Collection stage can store multiple pieces of data in columns and rows in Process Studio. - Object Studio does not have a Main Page but does have 2 default pages. Reusable logic is not included in any of the listed layers. - The reset button in Process Studio must always be pressed before re-running a process. The Action stage calls a Business Object page from a process. - The Wait stage enables an object to pause and wait for an application element and is available in Object Studio but not Process Studio.

Uploaded by

Aman Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
100% found this document useful (4 votes)
23K views2 pages

Blue Prism

The document discusses various concepts and components related to Blue Prism including: - The Navigate stage is used to launch an application in Object Studio. The Collection stage can store multiple pieces of data in columns and rows in Process Studio. - Object Studio does not have a Main Page but does have 2 default pages. Reusable logic is not included in any of the listed layers. - The reset button in Process Studio must always be pressed before re-running a process. The Action stage calls a Business Object page from a process. - The Wait stage enables an object to pause and wait for an application element and is available in Object Studio but not Process Studio.

Uploaded by

Aman Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 2

--Which stage is used in Blue Prism Object Studio to launch an application?

Navigate
--Which stage in Process Studio, can be used to store multiple pieces of data in
Columns and Rows? Collection
--What is correct about Object Studio? Object Studio does not have a Main Page, but
It does have 2 default page
--Reusable logic shall be in which layer? None of the option
--What are all the spy modes in Blue Prism? Win 32 Mode, HTML Mode, Active
Accessibility Mode, Region Mode
--The reset button in Process Studio must always be pressed ________.Before re-
running a Process.
--We can step through a diagram one stage at a time. Which of the following is used
to traverse pages more quickly? Step over and Step Out
--What is the purpose of Action Stage? It�s used to call a Business Object page
from a Processes.
--Which stage is available in Object Studio but not in process studio? Wait Stage
--Which stage enables a Business Object to pause and wait for an application
element? Wait stage

--The objects created in Object Studio can be made available in Control Room? False
--Which of the following statements is correct regarding the key field of the Work
Queue? The key field value must be unique
--Which of the following statement is correct? All exceptions are recoverable
--What is correct about Recovery Mode in Blue Prism? The �Preserve� checkbox is
only applicable when in Recovery Mode.
--What is the purpose of Action Stage? It�s used to call a Business Object page
from a Processes.
--We can call Initialize and Cleanup Actions of Object from Process. True
--Identify the two stages that that should always be there in process definition
Calculation Stage & Decision Stage
--The reset button in Process Studio must always be pressed. Before re-running a
Process.
--Exception Bubbling means Exception travel upwards towards the Main Page of the
Process
--How many times a session can run? Once
--Once a business object has launched an application, any attempt to launch again
will cause an exception.True
--Which of the following statements are correct? When Blue Prism encounters an
exception, it must terminate its processing and notify a user.
--Which of the following statements is true when employing multiple object in
object layer?Reduces the risk to the process layer when a change is made in object
layer
--Which Business Object is used to interact with Work Queue? Work Queue � Internal
--Which of the System Manager module of Blue Prism provides the below
functionalities? All the options
--Which stage needs to be used to call Business object Page from Process? Action
--Which part of Blue Prism interacts with the target system (the application a user
would use)? Application Modeller
--Which stage in Process Studio can be used to store multiple pieces of data in
Columns and Rows? Collection
--To spy the elements in any mode in an application, the keyboard shortcut is CTRL
+ Left Click
--Reusable logic shall be in which layer? None of the options