0% found this document useful (0 votes)
86 views

IV 01 Condition Monitoring

tutorial
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views

IV 01 Condition Monitoring

tutorial
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

UTINNOVATION

Condition Monitoring

Knowledge . Empowering . You

IEC 61850 Edition 2


Two Day Training Course

Content
•  IEC 61850 aspects of monitoring

•  SCADA services

•  Alarm handling

•  Naming

© 2015

IEC 61850 Edition 2 Condition Monitoring 1


UTINNOVATION

IEC 61850 and Monitoring


•  What is monitoring

•  Modeling monitoring in IEC 61850

•  Sensors

•  Measuring and metering

•  Supervision and protection

•  Condition monitoring

© 2015

Monitoring and supervision - examples


•  Supervision of an insulation media – resulting in some
actions taken by the system (e.g. trip breakers)

•  Supervision of a heating – resulting in actions initiated by


an operator (e.g. send maintenance people on place)

•  Collect information about the condition of an equipment –


can be analyzed by a specific tool to produce
recommendations for maintenance

© 2015

IEC 61850 Edition 2 Condition Monitoring 2


UTINNOVATION

Monitoring in IEC 61850


Measuring Analysing
(Sensors)
Txxx
VA=220.1k

Processing V
VB=220.2k
V

Mxxx VC=220.1k
V

Electrical
e.g. TCTR
Protection Trip System decides to
Pxxx
Non electrical take actions à
e.g. TPRS standardization of
Supervision Trip
Start semantic required
Sxxx

Al1=TRUE

Cond monitor
Sxxx

© 2015

Logical nodes for sensors


•  TCTR and TVTR for electrical quantities

•  Many LNs for non electrical quantities are added in Edition 2

•  Output of sensor logical nodes is typically an analog signal


modeled as sampled values

•  Data EEHealth used to supervise the sensor

© 2015

IEC 61850 Edition 2 Condition Monitoring 3


UTINNOVATION

Interaction between LNs on different levels

•  Not shown on this picture: Figure 20 IEC 61850-90-3

–  Supervision logical nodes “S” (e.g. SIMG – Supervision Insulation


Medium Gas).
•  “S” logical nodes are used at the bay level and communicate with
“T” logical nodes

© 2015

Measuring and metering


•  Measured quantities are further processed to generate
valuable information like
–  Currents, voltage, power and impedance in a three phase system
(MMXU)
–  Calculation of energy in a three phase system (MMTR)
–  Calculation of harmonics and interharmonics (MHAI)

•  Statistical evaluation of these values is possible


–  Maximum or minimum value over a defined period
–  Creating a history of this information

© 2015

IEC 61850 Edition 2 Condition Monitoring 4


UTINNOVATION

Supervision and protection


•  Measured quantities are evaluated with the purpose to
detect dangerous situations
–  A supervision of the quantities like e.g. an insulation medium in
Sxxx logical nodes
–  A processing of the quantities in Pxxx logical nodes

•  Based on results, the system initiates actions


–  No human involved in decisions
–  Well defined semantic required for interoperability

© 2015

Supervision – Example STMP

•  Well defined semantic


•  Settings are standardized

© 2015

IEC 61850 Edition 2 Condition Monitoring 5


UTINNOVATION

Supervision – Example SIMG

•  Supervises pressure, density and temperature


•  Well defined semantic
•  Related settings are currently not part of the standard

© 2015

Status information of LN SIML


SIML

InsAlm (stVal=T) InsAlm (stVal=F)


Insulation
Liquid Level InsBlk (stVal=T)
(SIML.Lev) liquid refilled
[Analogue
Value] InsTr (stVal=T)

(private) hysteresis
configuration
(private)

Time

SIML.InsAlm

© 2015

IEC 61850 Edition 2 Condition Monitoring 6


UTINNOVATION

Condition monitoring
•  Monitor the condition of equipment
–  Power transformers
–  Switchgear
–  Sensors
–  Auxiliary system (e.g. heating, cooling)
–  Power lines

•  Purpose
–  Failure detection
–  Guidance for maintenance personal
–  Condition based maintenance
–  Life time extension

© 2015

Health of the system


•  Standardized data object
Health (or EEHealth) is
used by operator

•  More detailed information


may be available for the
•  Green: everything ok specialist to determine the
source of the problem
•  Yellow: abnormality – still
safe to use equipment

•  Red: failure – unsafe to


use equipment
© 2015

IEC 61850 Edition 2 Condition Monitoring 7


UTINNOVATION

Condition monitoring in IEC 61850


•  IEC 61850-90-3: Using IEC 61850 for Condition
Monitoring Diagnosis and Analysis

•  Topics covered include:


–  Use of existing Logical Nodes for condition monitoring
–  Extensions to existing logical nodes
–  New logical nodes
–  Communication requirements

© 2015

SCADA services
•  Overview on SCADA services

•  Event oriented transmission

© 2015

IEC 61850 Edition 2 Condition Monitoring 8


UTINNOVATION

Overview
•  Client / server communication in IEC 61850 includes
typical SCADA services
–  Control
–  Data acquisition (read)
–  Event oriented transmission
–  File transfer

© 2015

Status information (Single Point Status)

SPS class
Attribute Attribute Type FC TrgOp Value/Value Range M/O/C
Name
DataName Inherited from Data Class (see IEC 61850-7-2)
event
DataAttribute (data change,
status quality change)
stVal stVal BOOLEAN ST dchg TRUE | FALSE M
q Quality ST qchg M
t TimeStamp ST M
substitution
subEna BOOLEAN SV PICS_SUBST
subVal BOOLEAN SV TRUE | FALSE PICS_SUBST
subQ Quality SV PICS_SUBST
subID VISIBLE STRING64 SV PICS_SUBST
configuration, description and extension
d VISIBLE STRING255 DC Text O
dU UNICODE STRING255 DC O
cdcNs VISIBLE STRING255 EX AC_DLNDA_M
cdcName VISIBLE STRING255 EX AC_DLNDA_M
dataNs VISIBLE STRING255 EX AC_DLN_M
Services
As defined in Table 13
Description

© 2015

IEC 61850 Edition 2 Condition Monitoring 9


UTINNOVATION

Status monitoring function

Reports from server to client


(or store entries into IED log)
stVal
(Status
Value)
value (tn) value (tn+1) value (tn+2) value (tn+3)

TRUE

FALSE
tn tn+1 tn+2 tn+3 Time

© 2015

Analog information

Trigger Option

range,
mag

deadband

range

© 2015

IEC 61850 Edition 2 Condition Monitoring 10


UTINNOVATION

Range monitoring function

Reports from server to client


(or store entries into IED log)
Analogue
h, t hh, t max,t
Value

RangeConfig:

max = 120
instMag

hhLim = 70

hLim = 55
Good
Maintenance required Maintenance Failure
demanded
min lLim llLim = 0
Time

Range: normal high high-high max

© 2015

Dead-band monitoring function

Reports from server to client (or log entries)

Analogue
value (tn) value (tn+1) value (tn+2) value (tn+3)
Value

mag

instMag

db (deadband
configuration):

+/-10 %
of (Min-Max) value

tn tn+1 tn+2 tn+3 Time

start

© 2015

IEC 61850 Edition 2 Condition Monitoring 11


UTINNOVATION

Alarm handling
•  Aspects of alarm handling

•  Alarm handling in IEC 61850

© 2015

Alarm handling
•  TC WG10 Taskforce established in 2012 to address
alarm handling
–  Use cases currently identified:
Alarm System

Dynamically
View Alarms Configure System

Asset Management Field test engineer


«extend»

Detect missing alarm


notifications
Create Alarm

Expert System Acknow ledge Alarms

Legacy System

Shelv e/Un-shelv e Create Alarm Group


Alarms

System Designer

Inhibit un-inhibit
System Operator
Alarms Prioritise Alarms

© 2015

IEC 61850 Edition 2 Condition Monitoring 12


UTINNOVATION

Principles
•  Any event can create an alarm

•  Alarm handling consists of


–  Creating group alarms
–  Creating alarm lists
–  Acknowledgment of alarms

•  Multiple practices are in use


–  Does an unacknowledged alarm disappear when the condition is
gone
–  Local acknowledgement versus remote acknowledgement

•  Standardization in IEC 61850 is currently limited

© 2015

Alarm handling in IEC 61850

•  Some alarms are standardized in the LNs; e.g.


–  EEHealth
–  PmpAlm – loss of pump in cooling group
•  LN CALH to create group alarms
•  No specifications about alarm handling