Master Test Plan: Department of Veterans Affairs
Master Test Plan: Department of Veterans Affairs
This template contains a paragraph style called Instructional Text. Text using this paragraph style is
designed to assist the reader in completing the document. Text in paragraphs added after this help text is
automatically set to the appropriate body text level. For best results and to maintain formatting
consistency, use the provided paragraph styles. Delete all instructional text before publishing or
distributing the document Revision History.
This template conforms to the latest Section 508 guidelines. The user of the template is
responsible to maintain Section 508 conformance for any artifact created from this template.
Revision History
1. Introduction..........................................................................................1
1.1. Purpose...............................................................................................................1
1.2. Test Objectives...................................................................................................1
1.3. Roles and Responsibilities...............................................................................2
1.4. Processes and References...............................................................................2
2. Items To Be Tested..............................................................................3
2.1. Overview of Test Inclusions..............................................................................3
2.2. Overview of Test Exclusions............................................................................3
3. Test Approach......................................................................................3
3.1. Product Component Test..................................................................................3
3.2. Component Integration Test.............................................................................3
3.3. System Tests......................................................................................................4
3.4. User Functionality Test......................................................................................4
3.5. Enterprise System Engineering Testing..........................................................4
3.6. Initial Operating Capability Evaluation............................................................4
4. Testing Techniques.............................................................................4
4.1. Risk-based Testing............................................................................................4
4.2. Enterprise Testing..............................................................................................4
4.2.1. Security Testing.........................................................................................5
4.2.2. Privacy Testing...........................................................................................5
4.2.3. Section 508 Compliance Testing..............................................................5
4.2.4. Multi-Divisional Testing.............................................................................5
4.3. Performance and Capacity Testing..................................................................6
4.4. Test Types...........................................................................................................6
4.5. Productivity and Support Tools........................................................................8
5. Test Criteria..........................................................................................8
5.1. Process Reviews................................................................................................8
5.2. Pass/Fail Criteria................................................................................................9
5.3. Suspension and Resumption Criteria..............................................................9
6. Test Deliverables.................................................................................9
7. Test Schedule....................................................................................10
8. Test Environments............................................................................10
8.1. Test Environment Configurations..................................................................10
8.2. Base System Hardware...................................................................................11
8.3. Base Software Elements in the Test Environments.....................................12
2. Items To Be Tested
List those test items - software, hardware, and supporting product elements that serve as
targets for testing. A test item may include source code, object code, job control code, control
data, documentation, or a collection of these.
The following components and features and combinations of components and features will be
tested:
3. Test Approach
The Test Approach is the implementation of the Test Strategy. The Test Approach cites how the
Development Team plans to cover the testing activities specified in the Product Build and
Independent Test and Evaluation processes in ProPath.
4. Testing Techniques
Testing Techniques describes the approach to risk-based testing, requirements for enterprise
testing, test types, iterations, and tools that are used to test the designated test items as
applicable.
5. Test Criteria
5.1. Process Reviews
The Master Test Plan under goes two reviews:
Peer Review – upon completion of the Master Test Plan
Formal Review – after the Development Manager approves the Master Test Plan
For more information on the reviews associated with testing, see the Product Build, Test
Preparation, and Independent Test and Evaluation processes.
6. Test Deliverables
The Test Deliverables listed below represent some possible deliverables for a testing project. The
Test Deliverables table may be tailored to meet project needs. Do not include Delete any listed
test deliverable that is not used by the Product Build, Test Management, and Independent Test
and Evaluation processes.
Table 4 lists the test deliverables for the {project name here} project.
Table 4: Test Deliverables
Test Deliverables Responsible Party
Master Test Plan {Name}, Role
Performance Test Plan {Name}, Role
Iteration Test Plans (when appropriate) {Name}, Role
Test Execution Risks {Name}, Role
Test Schedule {Name}, Role
Test Cases/Test Scripts {Name}, Role
Test Data {Name}, Role
Test Environment {Name}, Role
Test Evaluation (including performance test {Name}, Role
results)
Traceability Report or Matrix {Name}, Role
8. Test Environments
A test environment is an environment containing hardware, instrumentation, simulators, software
tools, and other support elements needed to conduct a test.
Signed: Date:
< Program/Project Manager >
Signed: Date:
< Business Sponsor Representative >
Signed: Date:
<Project Team Test Manager>