Whose Turn Is It? Phasing, Rings, and Barriers: Number and Title Type
Whose Turn Is It? Phasing, Rings, and Barriers: Number and Title Type
One of the primary functions of a traffic signal is to provide a time separation between the conflicting
movements at an intersection. A stop sign accomplishes the same result but leaves much of the discretion
to the driver to decide “whose turn it is.” A traffic signal provides clear instructions to drivers traveling
through the intersection that it is their “turn to go” using an appropriate signal or display.
In Chapter 3, you will complete a set of activities to learn about the most commonly used method of
separating conflicting movements at an intersection. Known as NEMA (National Electrical Manufacturing
Association) phasing, this method assigns numbers to each of the four left turn and four through movements,
and provides a logical process through which each of the movements is served in turn. Each movement
is controlled by a phase (or “timing unit”), and eight phase numbers account for the basis of a NEMA
phasing plan. Left turn phasing is of particular importance, particularly the determination of whether a left
turn should be protected (indicated by a green arrow) or permitted (indicated by a flashing yellow arrow
or a green ball). Left turn phasing is covered in Chapter 8 of this book.
When you have completed the activities in this chapter, you will be able to
• Describe NEMA phasing and the concept of rings and barriers
• List the phase numbers at a standard intersection with eight movements
• Draw and describe a ring barrier diagram in which there are two rings and eight phases
• Determine the phasing pattern and sequence for a signalized intersection in the field
• Begin to appreciate how theoretical information about phasing, rings, and barriers is used and applied
by professionals
This chapter begins with a Reading activity and ends with an In Practice activity. The reading content
describes the concept of the ring barrier diagram and how phases are sequenced. The In Practice activity
provides further information on these concepts. The chapter also includes two other activities. Activity
#14 is an exercise to practice what you’ve learned from the reading. In Activity #15, you will document
the phasing pattern for an intersection in the field using the NEMA phasing scheme.
14 What Do You Know About Phasing and Ring Barrier Diagrams? Assessment
This activity will give you the opportunity to learn how movements and phases are safely sequenced.
Provide a definition for each of the following terms and variables. Paraphrasing a formal definition (as
provided by your text, instructor, or another resource) demonstrates that you understand the meaning of
the term or phrase.
concurrency
group
movement
NEMA phase
numbering
overlap
phase
ring
ring barrier
diagram
When you have completed the reading, prepare answers to the following questions.
What is the purpose of the ring barrier diagram?
3. Why use a ring barrier diagram instead of a conflict matrix to describe the sequencing of phases?
The Cabinet
The controller is housed in a box called the cabinet, which is
located at the intersection. See Figure 49. Modern cabinets have
16 detector amplifiers, a controller that can accommodate up to
16 phases and 4 rings, and 16 load switches. Figure 50 shows an
example of the location of the detector amplifiers, the controller,
and the load switches inside a cabinet.
• A detector amplifier accepts calls from one or more
loop detectors; each loop detector monitors traffic on
one or more lanes. Each loop sets up an inductance field
which is used to sense vehicles and generates an output Figure 49. Cabinet at intersection
signal to the traffic controller. The sensitivity of the loop is based on how well the metal interrupts the
inductance field and the sensitivity of the amplifier settings that is needed to generate an output. The
output signal from the amplifier effectively closes the detection circuit to the controller.
• The controller interprets this signal (on or off) as either a call or no call. The call is registered when an
algorithm in the controller has processed the input.
• The controller provides the logic for determining when and how long each phase will time, based
on the calls received from the detectors and the timing plan that has been programmed. A phase is a
timing unit that controls the operation of one or more movements. One phase generally drives one load
switch, although through the use of overlaps it can drive multiple outputs (load switches). Overlaps
can also combine phases to meet special needs.
• Based on outputs from the controller, the load switches drive the displays that users respond to by
converting the low voltage controller output to a higher voltage that drives the traffic signal display.
Each display typically has up to three indications, the maximum number of indications driven by a
load switch. The indications include a “go” indication that indicates that a user has the right-of-way
and can safely proceed through the intersection and a “stop” indication that tells the user not to enter
the intersection.
For example, suppose that the phase 1 display indicates green. Either phase 5 or phase 6 can also display green
concurrently with phase 1 green as shown in Figure 53 and Figure 54. This means that either movements 1 and
5 or movements 1 and 6 can be served concurrently.
Figure 53. Phase 1 green and phase 5 green can be Figure 54. Phase 1 green and phase 6 green can be
displayed concurrently displayed concurrently
Figure 55 shows the phases that are both compatible with and in conflict with phase 1 in the form of a conflict
matrix. Phases that conflict with phase 1 (phases 2, 3, 4, 7, and 8) are marked with an “X” in the column under
Subject Phase 1. The empty squares next to phases 5 and 6 indicate that they are compatible with phase 1.
Figure 55. Conflict Matrix showing conflicting Figure 56. Example conflict matrix
and compatible phases for phase 1
Now let’s fill in the Conflict Matrix for all phases at a standard four leg intersection, as shown in Figure
56. Considering each subject phase in turn, the empty squares in each column show the phase pairs that are
compatible, in which the movements controlled by these phases can move at the same time. The “X” squares
show incompatible phases, in which the movements controlled by these phases cannot operate at the same
time. The conflict matrix will be the basis for constructing a ring barrier diagram, which we will do in the next
section of this reading.
Ring Barrier Diagram
The ring barrier diagram specifies the safe sequencing of phases (and thus the movements that they control)
at a signalized intersection. We can construct the ring barrier diagram as follows. First, we separate the phases
Chapter 3: Whose Turn is it? Phasing, Rings, and Barriers 91
ACTIVITY 13: PHASING, RINGS, AND BARRIERS
This depiction of the sequencing of the eight phases is now complete. However, there is an important feature
of this sequencing that provides for more efficient operation when the timing of the phases is tied to the level
of demand for each movement during a given signal cycle, as occurs with actuated signal control. Suppose, for
example, that phase 1 times for 10 seconds, while the demand for the movement served by phase 5 requires 20
seconds to be served. We can represent this timing pattern in a partial ring barrier diagram as shown in Figure 60.
Figure 60. Partial ring barrier diagram Figure 61. Example partial ring barrier
showing phases 1 and 5 diagram for north-south
concurrency group
When phase 1 ends, phase 2 can begin timing since it can run concurrently with phase 5. If phase 2 then times
for 30 seconds, and phase 6 times for 20 seconds, we can represent the partial ring barrier diagram for the
phases serving the north-south movements as shown in Figure 61. Note that both rings 1 and 2 must “cross
the barrier” at the same time, meaning that the active phases in these rings (in this case, phases 2 and 6) must
end at the same time.
Consider another situation in which the demand for phase 1 requires 15 seconds, while the demand for phase
5 requires 10 seconds. Figure 62 shows the partial ring barrier diagram for this condition.
Now, what if the demand for phases 2 and 6 each requires 25 seconds to serve? What does the ring barrier
diagram look like? Even though phase 6 requires 25 seconds, it will actually time for 30 seconds (with five
seconds of slack time, or time that is not needed to service vehicle demand) because phase 2 and 6 must cross
the barrier at the same time, as shown in Figure 63. During this “slack time” period, phase 6 is not timing but
“resting in green.”
Figure 62. Example partial ring barrier diagram Figure 63. Example partial ring barrier diagram
for north-south concurrency group for north-south concurrency group
with slack time
Other Issues
Phasing is a complex topic, and this reading covers only some of the basic concepts related to phasing.
However, it is worth mentioning four other topics, including left turn phasing, split phasing, single ring
operations and overlaps, and phasing for T-intersections.
Left turns
The previous discussion assumed leading protected left turns for the phasing sequence. This means that
left turn movements are served first, before the compatible through movements, and that the left turn
movements are protected. It is also common for left turns to be permitted, in which case left turning
drivers must wait for a safe gap in the opposing traffic stream to complete their maneuver. An example
ring barrier diagram for permitted left turn phasing is shown in Figure 64. Here all six movements in
the north-south concurrency group are served at the same time by phases 2 and 6, while phases 4 and 8
simultaneously serve the six movements in the east-west concurrency group. The left turn movements (1,
3, 5, and 7) are shown as a dashed line since they are permitted and must yield to opposing through traffic.
Various left turn phasing options will be discussed in more detail in Chapter 8 of this book.
Figure 64. Ring barrier diagram for permitted left turn phasing
Split Phasing
Another phasing scheme is called split phasing. Split phasing is when each of the four intersection
approaches is served in turn, sequentially, as shown in the ring barrier diagram in Figure 65. Split phasing
is often used when the intersection geometrics limit opposing left turn movements from traveling at the
same time. Split phasing can be accomplished with a single ring, a concept that will be discussed further
in the next section.
Figure 67. Ring barrier diagram for single ring and overlaps
A more standard overlap operation is shown in Figure 68. Here, the overlaps are each right turns that
shadow what might be generally thought of as a conflicting left turn movement. For example, overlap A
would “shadow” the parent phase 1. Standard cabinets can accommodate up to four overlaps, each one
driving a load switch, which in turn drives a display and the included indications.
Figure 69. Movement diagram for T-intersection Figure 70. Phase diagram for T-intersection
The purpose of this activity is to test your understanding of the material covered in the Reading on ring
barrier diagrams. This includes gaining a basic level of understanding of the concept of rings and barriers,
and how they are used to safely separate the operation of conflicting movements at a signaled intersection.
• Prepare a one page document that includes your results from Tasks 1 through 5
Sketch a four leg intersection, showing an exclusive left turn lane and one through lane on each approach.
Number each movement and list the phase number corresponding to the standard NEMA numbering
scheme that would control each movement.
Prepare a sketch of a ring barrier diagram that represents the condition described in Task 1.
Prepare a brief description of the timing process for this eight phase operation by describing the order and
manner in which each phase is served. Consider the various sequences that may occur depending on traffic
flow volumes.
Suppose the traffic demand for the east-west movements at a signalized intersection requires the following
times for each movement to be served. Draw a partial ring barrier diagram showing the sequence and the
timing of the phases controlling these movements. (See Table 7, following page.)
EBTH 2 25
WBLT 1 10
WBTH 6 15
Figure 72 shows an intersection with five approaches. The movement are shown and numbered. Prepare a
conflict matrix and a ring barrier diagram that would provide safe operation for this intersection.
The purpose of this activity is to give you the experience of observing the operation of an actuated
controlled intersection in the field and to document the phasing sequence that you observe.
• Determine the phasing pattern and sequence for a signalized intersection in the field
• Prepare a one page document including your field observations and the resulting ring barrier diagram
You will be assigned an intersection in the field from which you will observe and record phasing
information.
Prepare a sketch of the intersection to which you have been assigned, including the geometry and the
movements that you observe at the intersection.
Based on standard NEMA phasing, add the phase numbers to the sketch of the movements that you
prepared in Task 1.
Observe the intersection for a period of 15 minutes. Record the sequence in which each movement is
served during this period in Table 8.
Prepare a ring barrier diagram showing the sequence of phases that you believe exist at this intersection.
Document any differences between the normal sequence (Figure 59) and any special phasing sequences
that you observe.
The purpose of this activity is to extend your understanding of the topics already encountered in this
chapter.
• Appreciate how theoretical information about phasing, rings, and barriers is used and applied by
professionals
Read the section of the Traffic Signal Timing Manual assigned by your instructor.
When you have completed the reading, prepare answers to the following questions:
1. What is the logic for the sequence of phases that are included in a ring?
2. What impact did your field experience have on your understanding of phasing, rings, and barriers?
by Peter Koonce
The standard ring barrier configuration has been helpful to standardize design, operations, and
maintenance functions of signalized intersections. Yet, there are some cases where the strength of the
ring barrier diagram may limit our willingness to think outside the box. The intersection of NE 82nd
& Airport Way in Portland, Oregon is a heavily travelled intersection with light rail in close proximity.
Medians separating the movements provided an opportunity to allow pedestrians to cross in three stages
during non-conflicting vehicle phases. This was done to insure safe operation of the light rail preemption.
The sketch of the intersection on the left shows the vehicle phases numbered 2, 4, 5, and 6. The pedestrian
phases, numbered P4 and P6, operate at the same time as the vehicle phases 4 and 6, respectively. A
pedestrian crossing Airport Way would be served by three sequential pedestrian phases: P4, P6, and P4.
The sketch on the right shows a design that used overlaps to cross the barriers for pedestrians allowing
the signal timing to permit crossings over the entire length of a cycle, reducing the pedestrian crossing
time by up to 75 seconds. It also improved crossings for people on bicycles, addressing a complaint
from a cyclist who correctly noted that the ring barrier structure prioritized vehicle movements with little
concern for efficient pedestrian operations. A simple modification to the allowable phases and the order
of the movements allowed a person on a bicycle to cross on the pedestrian movement more efficiently
by assigning multiple phases to the various overlaps at the intersection.
Before After
Terms and variables that should appear in your map are listed below.
Student Notes: