Phase 1 involves researching the causes of traffic in Porac and possible solutions. Phase 2 includes preparing a plan by setting up a meeting with the municipality to discuss road widening, planning locations, deciding on a timeline, and obtaining needed materials. Phase 3 is about finalizing, evaluating, and validating the project by widening roads in targeted areas, monitoring the traffic system, and creating a schedule for vehicle passage.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
65 views1 page
Conceptual Framework
Phase 1 involves researching the causes of traffic in Porac and possible solutions. Phase 2 includes preparing a plan by setting up a meeting with the municipality to discuss road widening, planning locations, deciding on a timeline, and obtaining needed materials. Phase 3 is about finalizing, evaluating, and validating the project by widening roads in targeted areas, monitoring the traffic system, and creating a schedule for vehicle passage.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
CONCEPTUAL FRAMEWORK
Phase 1: Research about the
causes of Traffic in Porac Phase 2: Preparation Planning Step 4: Set an appointment to talk Step 1: Determine the causes and have a permission to the and possible solutions of the Municipality regarding road widening traffic in Porac for some areas..
Step 5: Plan out the things and
location that you want to do Step 2: Identify where do the regarding the road widening for some traffic starts and usually begin areas in Porac.. on its specific time. Step 6: Decide the time interval and how long would it takes if it is already approved and canvass the materials needed. Step 3: Know the most affected areas cause of traffic in Porac and 8. Decide and canvass the materials finalize the gathered data and needed. Step 7: Look for a professional information. engineer to help and to guide in performing and implementing this project.
Test Results
Phase 3: Finalizing, Evaluation and Validation
Step 11: Come up a time
Step 10: Do and start the road schedule of light and heavy widening for some areas in vehicles whenever they will Porac. passed by the road.