Hasil Simulasi Etap
Hasil Simulasi Etap
Project: Page: 1
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
System Frequency: 50 Hz
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
C 100.0 -30.0 0 0 0 0
Bus1 3-Phase Swing 20.000 1 A 100.0 0.0 0.148 0.087 0 0 0.000 0.000
B 100.0 -120.0 0.139 0.067 0 0
C 100.0 -30.0 0 0 0 0
Bus16 A Load 0.231 1 A 100.0 -150.0 0 0 0.004 0.002 0.000 0.000
Bus17 B Load 0.231 1 B 100.0 -270.0 0 0 0.003 0.002 0.000 0.000
Bus18 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus19 C Load 0.231 1 C 100.0 -30.0 0 0 0.004 0.002 0.000 0.000
Bus28 A Load 0.231 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
Bus29 B Load 0.231 1 B 100.0 -270.0 0 0 0 0 0.000 0.000
Bus30 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus31 C Load 0.231 1 C 100.0 -30.0 0 0 0.001 0 0.000 0.000
Bus68 A Load 0.231 1 A 100.0 -150.0 0 0 0.009 0.006 0.000 0.000
Bus69 B Load 0.231 1 B 100.0 -270.0 0 0 0.009 0.006 0.000 0.000
Bus70 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus71 C Load 0.231 1 C 100.0 -30.0 0 0 0.011 0.007 0.000 0.000
Bus76 A Load 0.231 1 A 100.0 -150.0 0 0 0.012 0.007 0.000 0.000
Bus77 B Load 0.231 1 B 100.0 -270.0 0 0 0.013 0.008 0.000 0.000
Bus78 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus79 C Load 0.231 1 C 100.0 -30.0 0 0 0.015 0.009 0.000 0.000
Bus80 A Load 0.231 1 A 100.0 -150.0 0 0 0.001 0 0.000 0.000
Bus81 B Load 0.231 1 B 100.0 -270.0 0 0 0.002 0.002 0.000 0.000
Bus82 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus83 C Load 0.231 1 C 100.0 -30.0 0 0 0.002 0.001 0.000 0.000
ETAP
Project: Page: 4
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
C 100.0 -30.0 0 0 0 0
Bus87 C Load 0.231 1 C 100.0 -30.0 0 0 0.015 0.009 0.000 0.000
Bus92 A Load 0.231 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
Bus93 B Load 0.231 1 B 100.0 -270.0 0 0 0 0 0.000 0.000
Bus94 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus95 C Load 0.231 1 C 100.0 -30.0 0 0 0 0 0.000 0.000
Bus100 A Load 0.231 1 A 100.0 -150.0 0 0 0.004 0.002 0.000 0.000
Bus101 B Load 0.231 1 B 100.0 -270.0 0 0 0.004 0.002 0.000 0.000
Bus102 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus103 C Load 0.231 1 C 100.0 -30.0 0 0 0.004 0.002 0.000 0.000
Bus104 A Load 0.231 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
Bus105 B Load 0.231 1 B 100.0 -270.0 0 0 0 0 0.000 0.000
Bus106 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus107 C Load 0.231 1 C 100.0 -30.0 0 0 0 0 0.000 0.000
Bus108 A Load 0.231 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
Bus109 B Load 0.231 1 B 100.0 -270.0 0 0 0 0 0.000 0.000
Bus110 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus111 C Load 0.231 1 C 100.0 -30.0 0 0 0 0 0.000 0.000
Bus116 A Load 0.231 1 A 100.0 -150.0 0 0 0.006 0.004 0.000 0.000
Bus117 B Load 0.231 1 B 100.0 -270.0 0 0 0.004 0.002 0.000 0.000
Bus118 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus119 C Load 0.231 1 C 100.0 -30.0 0 0 0.007 0.004 0.000 0.000
Bus120 A Load 0.231 1 A 100.0 -150.0 0 0 0.008 0.005 0.000 0.000
Bus121 B Load 0.231 1 B 100.0 -270.0 0 0 0.012 0.007 0.000 0.000
Bus122 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus123 C Load 0.231 1 C 100.0 -30.0 0 0 0.014 0.009 0.000 0.000
Bus148 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
ETAP
Project: Page: 5
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
C 100.0 -30.0 0 0 0 0
Bus182 C Load 0.231 1 C 100.0 -30.0 0 0 0.003 0.002 0.000 0.000
Bus187 A Load 0.231 1 A 100.0 -150.0 0 0 0.004 0.003 0.000 0.000
Bus188 B Load 0.231 1 B 100.0 -270.0 0 0 0.004 0.003 0.000 0.000
Bus189 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus190 C Load 0.231 1 C 100.0 -30.0 0 0 0.004 0.003 0.000 0.000
Bus195 A Load 0.231 1 A 100.0 -150.0 0 0 0.002 0.001 0.000 0.000
Bus196 B Load 0.231 1 B 100.0 -270.0 0 0 0.001 0.001 0.000 0.000
Bus197 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus198 C Load 0.231 1 C 100.0 -30.0 0 0 0.004 0.002 0.000 0.000
Bus203 A Load 0.231 1 A 100.0 -150.0 0 0 0.002 0.001 0.000 0.000
Bus204 B Load 0.231 1 B 100.0 -270.0 0 0 0.002 0.001 0.000 0.000
Bus205 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus206 C Load 0.231 1 C 100.0 -30.0 0 0 0.002 0.001 0.000 0.000
Bus211 A Load 0.231 1 A 100.0 -150.0 0 0 0.003 0.002 0.000 0.000
Bus212 B Load 0.231 1 B 100.0 -270.0 0 0 0 0 0.000 0.000
Bus213 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus214 C Load 0.231 1 C 100.0 -30.0 0 0 0.001 0.001 0.000 0.000
Bus219 A Load 0.231 1 A 100.0 -150.0 0 0 0.008 0.005 0.000 0.000
Bus220 B Load 0.231 1 B 100.0 -270.0 0 0 0.007 0.004 0.000 0.000
Bus221 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus222 C Load 0.231 1 C 100.0 -30.0 0 0 0.011 0.007 0.000 0.000
Bus227 A Load 0.231 1 A 100.0 -150.0 0 0 0.001 0.001 0.000 0.000
Bus228 B Load 0.231 1 B 100.0 -270.0 0 0 0.003 0.002 0.000 0.000
Bus229 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus230 C Load 0.231 1 C 100.0 -30.0 0 0 0.003 0.002 0.000 0.000
Bus235 A Load 0.231 1 A 100.0 -150.0 0 0 0.001 0.001 0.000 0.000
Bus236 B Load 0.231 1 B 100.0 -270.0 0 0 0.001 0.001 0.000 0.000
ETAP
Project: Page: 6
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
C 100.0 -30.0 0 0 0 0
Bus238 C Load 0.231 1 C 100.0 -30.0 0 0 0.004 0.003 0.000 0.000
Bus243 A Load 0.231 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
Bus244 B Load 0.231 1 B 100.0 -270.0 0 0 0 0 0.000 0.000
Bus245 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus246 C Load 0.231 1 C 100.0 -30.0 0 0 0 0 0.000 0.000
Bus251 A Load 0.231 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
Bus252 B Load 0.231 1 B 100.0 -270.0 0 0 0 0 0.000 0.000
Bus253 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus254 C Load 0.231 1 C 100.0 -30.0 0 0 0.001 0.001 0.000 0.000
Bus259 A Load 0.231 1 A 100.0 -150.0 0 0 0.003 0.002 0.000 0.000
Bus260 B Load 0.231 1 B 100.0 -270.0 0 0 0.002 0.001 0.000 0.000
Bus261 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus262 C Load 0.231 1 C 100.0 -30.0 0 0 0.005 0.003 0.000 0.000
Bus271 A Load 0.231 1 A 100.0 -150.0 0 0 0.002 0.001 0.000 0.000
Bus272 B Load 0.231 1 B 100.0 -270.0 0 0 0.004 0.002 0.000 0.000
Bus273 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus274 C Load 0.231 1 C 100.0 -30.0 0 0 0.003 0.002 0.000 0.000
Bus279 A Load 0.231 1 A 100.0 -150.0 0 0 0.003 0.002 0.000 0.000
Bus280 B Load 0.231 1 B 100.0 -270.0 0 0 0.003 0.002 0.000 0.000
Bus281 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus282 C Load 0.231 1 C 100.0 -30.0 0 0 0.003 0.002 0.000 0.000
Bus287 A Load 0.231 1 A 100.0 -150.0 0 0 0.010 0.006 0.000 0.000
Bus288 B Load 0.231 1 B 100.0 -270.0 0 0 0.012 0.007 0.000 0.000
Bus290 C Load 0.231 1 C 100.0 -30.0 0 0 0.001 0.001 0.000 0.000
Bus295 A Load 0.231 1 A 100.0 -150.0 0 0 0.001 0 0.000 0.000
Bus296 B Load 0.231 1 B 100.0 -270.0 0 0 0 0 0.000 0.000
Bus297 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus298 C Load 0.231 1 C 100.0 -30.0 0 0 0 0 0.000 0.000
Bus299 A Load 0.231 1 A 100.0 -150.0 0 0 0.001 0 0.000 0.000
Bus300 B Load 0.231 1 B 100.0 -270.0 0 0 0.001 0.001 0.000 0.000
ETAP
Project: Page: 7
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
C 100.0 -30.0 0 0 0 0
Bus302 C Load 0.231 1 C 100.0 -30.0 0 0 0.001 0.001 0.000 0.000
Bus307 A Load 0.231 1 A 100.0 -150.0 0 0 0.006 0.004 0.000 0.000
Bus308 B Load 0.231 1 B 100.0 -270.0 0 0 0.006 0.004 0.000 0.000
Bus309 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus310 C Load 0.231 1 C 100.0 -30.0 0 0 0.009 0.006 0.000 0.000
Bus315 A Load 0.231 1 A 100.0 -150.0 0 0 0.002 0.001 0.000 0.000
Bus316 B Load 0.231 1 B 100.0 -270.0 0 0 0.004 0.002 0.000 0.000
Bus317 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus318 C Load 0.231 1 C 100.0 -30.0 0 0 0.005 0.003 0.000 0.000
Bus323 A Load 0.231 1 A 100.0 -150.0 0 0 0.002 0.001 0.000 0.000
Bus324 B Load 0.231 1 B 100.0 -270.0 0 0 0.002 0.001 0.000 0.000
Bus325 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus326 C Load 0.231 1 C 100.0 -30.0 0 0 0.004 0.002 0.000 0.000
Bus327 A Load 0.231 1 A 100.0 -150.0 0 0 0.002 0.001 0.000 0.000
Bus328 B Load 0.231 1 B 100.0 -270.0 0 0 0.002 0.001 0.000 0.000
Bus329 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus330 C Load 0.231 1 C 100.0 -30.0 0 0 0.004 0.002 0.000 0.000
Bus331 A Load 0.231 1 A 100.0 -150.0 0 0 0.002 0.001 0.000 0.000
Bus332 B Load 0.231 1 B 100.0 -270.0 0 0 0.004 0.002 0.000 0.000
Bus333 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus334 C Load 0.231 1 C 100.0 -30.0 0 0 0.005 0.003 0.000 0.000
Bus339 A Load 0.231 1 A 100.0 -150.0 0 0 0.013 0.008 0.000 0.000
Bus340 B Load 0.231 1 B 100.0 -270.0 0 0 0.013 0.008 0.000 0.000
Bus341 3-Phase Load 0.400 1 A 100.0 -150.0 0 0 0 0 0.000 0.000
B 100.0 -270.0 0 0 0 0
C 100.0 -30.0 0 0 0 0
Bus342 C Load 0.231 1 C 100.0 -30.0 0 0 0.015 0.009 0.000 0.000
Cable
Length Ohms/1000 m per Conductor
ID Conn. Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y
Cable
Length Ohms/1000 m per Conductor
ID Conn. Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y
Cable
Length Ohms/1000 m per Conductor
ID Conn. Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y
Cable
Length Ohms/1000 m per Conductor
ID Conn. Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y
Branch Connections
Bus Gedung D 0.400 A 94.322 -149.1 0 0 0 0 Bus287 A 0.010 0.005 49.6 90.7
B 91.985 89.5 0 0 0 0
C 96.764 -31.5 0 0 0 0 N 49.6
* Bus1 20.000 A 100.000 0.0 0.148 0.087 0 0 Bus148 A 0.148 0.087 14.8 86.2
B 100.000 -120.0 0.139 0.067 0 0 B 0.139 0.067 13.4 90.0
C 100.000 120.0 0.160 0.070 0 0 C 0.160 0.070 15.1 91.7
N 0.0
Bus16 0.231 A 92.375 -149.2 0 0 0.003 0.002 Bus18 A -0.003 -0.002 18.1 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 18.1
Bus17 0.231 B 92.624 90.6 0 0 0.003 0.002 Bus18 A 0.000 0.000 0.0 0.0
B -0.003 -0.002 16.0 85.0
C 0.000 0.000 0.0 0.0
N 16.0
Bus19 0.231 C 91.408 -29.5 0 0 0.003 0.002 Bus18 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.003 -0.002 18.0 85.0
N 18.0
ETAP
Project: Page: 22
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Bus31 0.231 C 94.229 -30.5 0 0 0.001 0 Bus30 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.001 0.000 3.7 85.0
N 3.7
Bus68 0.231 A 75.514 -143.8 0 0 0.007 0.004 Bus70 A -0.007 -0.004 47.7 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 47.7
Bus69 0.231 B 73.635 97.0 0 0 0.007 0.005 Bus70 A 0.000 0.000 0.0 0.0
B -0.007 -0.005 51.2 85.0
C 0.000 0.000 0.0 0.0
N 51.2
Bus71 0.231 C 68.463 -22.0 0 0 0.008 0.005 Bus70 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.008 -0.005 59.8 85.0
N 59.8
Bus76 0.231 A 77.606 -144.7 0 0 0.009 0.006 Bus78 A -0.009 -0.006 60.4 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 60.4
Bus77 0.231 B 76.098 96.0 0 0 0.010 0.006 Bus78 A 0.000 0.000 0.0 0.0
B -0.010 -0.006 64.2 85.0
C 0.000 0.000 0.0 0.0
N 64.2
Bus79 0.231 C 71.440 -23.2 0 0 0.010 0.006 Bus78 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.010 -0.006 74.4 85.0
N 74.4
Bus80 0.231 A 94.966 -150.1 0 0 0.001 0 Bus82 A -0.001 0.000 3.8 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 3.8
ETAP
Project: Page: 24
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Bus81 0.231 B 90.570 91.4 0 0 0.002 0.001 Bus82 A 0.000 0.000 0.0 0.0
B -0.002 -0.001 12.7 85.0
C 0.000 0.000 0.0 0.0
N 12.7
Bus83 0.231 C 91.157 -29.4 0 0 0.002 0.001 Bus82 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.002 -0.001 9.7 85.0
N 9.7
Bus84 0.231 A 78.365 -144.9 0 0 0.009 0.006 Bus86 A -0.009 -0.006 57.9 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 57.9
Bus85 0.231 B 75.936 96.1 0 0 0.010 0.006 Bus86 A 0.000 0.000 0.0 0.0
B -0.010 -0.006 64.2 85.0
C 0.000 0.000 0.0 0.0
N 64.2
Bus87 0.231 C 72.023 -23.4 0 0 0.010 0.006 Bus86 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.010 -0.006 72.3 85.0
N 72.3
Bus100 0.231 A 87.422 -147.6 0 0 0.003 0.002 Bus102 A -0.003 -0.002 18.4 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 18.4
ETAP
Project: Page: 26
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Bus101 0.231 B 87.674 92.2 0 0 0.003 0.002 Bus102 A 0.000 0.000 0.0 0.0
B -0.003 -0.002 17.4 85.0
C 0.000 0.000 0.0 0.0
N 17.4
Bus103 0.231 C 87.184 -28.1 0 0 0.003 0.002 Bus102 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.003 -0.002 17.0 85.0
N 17.0
Bus116 0.231 A 82.162 -146.1 0 0 0.004 0.003 Bus118 A -0.004 -0.003 26.2 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 26.2
ETAP
Project: Page: 28
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Bus117 0.231 B 87.718 92.3 0 0 0.003 0.002 Bus118 A 0.000 0.000 0.0 0.0
B -0.003 -0.002 16.7 85.0
C 0.000 0.000 0.0 0.0
N 16.7
Bus119 0.231 C 78.266 -24.9 0 0 0.005 0.003 Bus118 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.005 -0.003 31.3 85.0
N 31.3
Bus120 0.231 A 87.293 -147.8 0 0 0.006 0.004 Bus122 A -0.006 -0.004 37.7 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 37.7
Bus121 0.231 B 81.041 94.7 0 0 0.009 0.006 Bus122 A 0.000 0.000 0.0 0.0
B -0.009 -0.006 58.7 85.0
C 0.000 0.000 0.0 0.0
N 58.7
Bus123 0.231 C 76.310 -25.0 0 0 0.011 0.007 Bus122 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.011 -0.007 70.5 85.0
N 70.5
Bus179 0.231 A 86.406 -147.1 0 0 0.003 0.002 Bus181 A -0.003 -0.002 15.3 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 15.3
Bus180 0.231 B 88.841 91.9 0 0 0.002 0.001 Bus181 A 0.000 0.000 0.0 0.0
B -0.002 -0.001 11.5 85.0
C 0.000 0.000 0.0 0.0
N 11.5
Bus182 0.231 C 86.326 -27.6 0 0 0.002 0.001 Bus181 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.002 -0.001 14.1 85.0
N 14.1
ETAP
Project: Page: 30
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Bus187 0.231 A 57.672 -137.4 0 0 0.003 0.002 Bus189 A -0.003 -0.002 24.2 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 24.2
Bus188 0.231 B 62.137 101.1 0 0 0.003 0.002 Bus189 A 0.000 0.000 0.0 0.0
B -0.003 -0.002 21.5 85.0
C 0.000 0.000 0.0 0.0
N 21.5
Bus190 0.231 C 58.706 -18.1 0 0 0.003 0.002 Bus189 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.003 -0.002 23.0 85.0
N 23.0
Bus195 0.231 A 80.138 -145.1 0 0 0.002 0.001 Bus197 A -0.002 -0.001 12.2 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 12.2
Bus196 0.231 B 86.841 92.8 0 0 0.001 0.001 Bus197 A 0.000 0.000 0.0 0.0
B -0.001 -0.001 7.4 85.0
C 0.000 0.000 0.0 0.0
N 7.4
Bus198 0.231 C 69.507 -21.7 0 0 0.003 0.002 Bus197 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.003 -0.002 19.0 85.0
N 19.0
Bus203 0.231 A 85.441 -146.8 0 0 0.002 0.001 Bus205 A -0.002 -0.001 12.1 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 12.1
Bus204 0.231 B 88.016 92.2 0 0 0.002 0.001 Bus205 A 0.000 0.000 0.0 0.0
B -0.002 -0.001 9.1 85.0
C 0.000 0.000 0.0 0.0
N 9.1
Bus206 0.231 C 86.696 -27.7 0 0 0.002 0.001 Bus205 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.002 -0.001 9.8 85.0
N 9.8
Bus211 0.231 A 89.211 -148.1 0 0 0.003 0.002 Bus213 A -0.003 -0.002 14.4 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 14.4
ETAP
Project: Page: 32
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Bus214 0.231 C 92.130 -29.6 0 0 0.001 0.001 Bus213 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.001 -0.001 7.1 85.0
N 7.1
Bus219 0.231 A 76.544 -144.4 0 0 0.007 0.004 Bus221 A -0.007 -0.004 45.0 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 45.0
Bus220 0.231 B 81.831 94.5 0 0 0.006 0.003 Bus221 A 0.000 0.000 0.0 0.0
B -0.006 -0.003 34.3 85.0
C 0.000 0.000 0.0 0.0
N 34.3
Bus222 0.231 C 66.100 -21.0 0 0 0.008 0.005 Bus221 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.008 -0.005 64.3 85.0
N 64.3
Bus227 0.231 A 83.496 -145.9 0 0 0.001 0.001 Bus229 A -0.001 -0.001 7.7 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 7.7
Bus228 0.231 B 60.008 101.9 0 0 0.002 0.001 Bus229 A 0.000 0.000 0.0 0.0
B -0.002 -0.001 19.9 85.0
C 0.000 0.000 0.0 0.0
N 19.9
Bus230 0.231 C 70.746 -22.4 0 0 0.002 0.001 Bus229 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.002 -0.001 13.9 85.0
N 13.9
Bus235 0.231 A 92.358 -149.4 0 0 0.001 0.001 Bus237 A -0.001 -0.001 4.6 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 4.6
ETAP
Project: Page: 34
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Bus236 0.231 B 89.194 92.1 0 0 0.001 0.001 Bus237 A 0.000 0.000 0.0 0.0
B -0.001 -0.001 7.7 85.0
C 0.000 0.000 0.0 0.0
N 7.7
Bus238 0.231 C 71.341 -22.4 0 0 0.003 0.002 Bus237 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.003 -0.002 24.0 85.0
N 24.0
Bus254 0.231 C 91.856 -29.6 0 0 0.001 0.001 Bus253 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.001 -0.001 4.6 85.0
N 4.6
Bus259 0.231 A 88.414 -147.9 0 0 0.003 0.002 Bus261 A -0.003 -0.002 14.5 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 14.5
Bus260 0.231 B 89.687 91.7 0 0 0.002 0.001 Bus261 A 0.000 0.000 0.0 0.0
B -0.002 -0.001 12.0 85.0
C 0.000 0.000 0.0 0.0
N 12.0
ETAP
Project: Page: 36
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Bus262 0.231 C 81.741 -26.0 0 0 0.004 0.002 Bus261 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.004 -0.002 24.0 85.0
N 24.0
Bus271 0.231 A 86.396 -147.0 0 0 0.002 0.001 Bus273 A -0.002 -0.001 9.0 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 9.0
Bus272 0.231 B 70.218 98.5 0 0 0.003 0.002 Bus273 A 0.000 0.000 0.0 0.0
B -0.003 -0.002 21.5 85.0
C 0.000 0.000 0.0 0.0
N 21.5
Bus274 0.231 C 77.177 -24.6 0 0 0.002 0.001 Bus273 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.002 -0.001 15.4 85.0
N 15.4
Bus279 0.231 A 88.719 -147.9 0 0 0.003 0.002 Bus281 A -0.003 -0.002 15.5 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 15.5
Bus280 0.231 B 89.304 91.8 0 0 0.002 0.002 Bus281 A 0.000 0.000 0.0 0.0
B -0.002 -0.002 14.0 85.0
C 0.000 0.000 0.0 0.0
N 14.0
Bus282 0.231 C 87.827 -28.2 0 0 0.003 0.002 Bus281 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.003 -0.002 15.4 85.0
N 15.4
Bus287 0.231 A 75.416 -142.3 0 0 0.007 0.005 Bus Gedung D A -0.007 -0.005 49.6 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 49.6
Bus288 0.231 B 77.067 95.1 0 0 0.009 0.006 Bus Gedung D A 0.000 0.000 0.0 0.0
B -0.009 -0.006 59.4 85.0
C 0.000 0.000 0.0 0.0
N 59.4
ETAP
Project: Page: 38
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Bus290 0.231 C 95.885 -31.1 0 0 0.001 0.001 Bus Gedung D A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.001 -0.001 7.1 85.0
N 7.1
Bus295 0.231 A 93.974 -149.8 0 0 0.001 0 Bus297 A -0.001 0.000 3.2 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 3.2
Bus299 0.231 A 94.559 -150.0 0 0 0.001 0 Bus301 A -0.001 0.000 3.2 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 3.2
Bus300 0.231 B 91.378 91.1 0 0 0.001 0.001 Bus301 A 0.000 0.000 0.0 0.0
B -0.001 -0.001 7.5 85.0
C 0.000 0.000 0.0 0.0
N 7.5
Bus302 0.231 C 92.781 -30.0 0 0 0.001 0 Bus301 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.001 0.000 4.3 85.0
N 4.3
Bus307 0.231 A 87.611 -147.7 0 0 0.005 0.003 Bus309 A -0.005 -0.003 28.2 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 28.2
Bus308 0.231 B 87.700 92.5 0 0 0.005 0.003 Bus309 A 0.000 0.000 0.0 0.0
B -0.005 -0.003 27.6 85.0
C 0.000 0.000 0.0 0.0
N 27.6
Bus310 0.231 C 79.382 -25.2 0 0 0.008 0.005 Bus309 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.008 -0.005 49.2 85.0
N 49.2
ETAP
Project: Page: 40
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Bus315 0.231 A 95.165 -150.2 0 0 0.002 0.001 Bus317 A -0.002 -0.001 11.7 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 11.7
Bus316 0.231 B 94.205 90.0 0 0 0.003 0.002 Bus317 A 0.000 0.000 0.0 0.0
B -0.003 -0.002 17.2 85.0
C 0.000 0.000 0.0 0.0
N 17.2
Bus318 0.231 C 92.619 -29.9 0 0 0.004 0.003 Bus317 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.004 -0.003 23.3 85.0
N 23.3
Bus323 0.231 A 93.676 -149.7 0 0 0.002 0.001 Bus325 A -0.002 -0.001 11.6 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 11.6
Bus324 0.231 B 93.511 90.3 0 0 0.002 0.001 Bus325 A 0.000 0.000 0.0 0.0
B -0.002 -0.001 11.4 85.0
C 0.000 0.000 0.0 0.0
N 11.4
Bus326 0.231 C 91.145 -29.4 0 0 0.003 0.002 Bus325 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.003 -0.002 17.4 85.0
N 17.4
Bus327 0.231 A 84.609 -146.5 0 0 0.002 0.001 Bus329 A -0.002 -0.001 12.0 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 12.0
Bus328 0.231 B 84.365 93.6 0 0 0.002 0.001 Bus329 A 0.000 0.000 0.0 0.0
B -0.002 -0.001 12.1 85.0
C 0.000 0.000 0.0 0.0
N 12.1
Bus330 0.231 C 78.454 -24.9 0 0 0.003 0.002 Bus329 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.003 -0.002 16.8 85.0
N 16.8
Bus331 0.231 A 91.630 -149.0 0 0 0.002 0.001 Bus333 A -0.002 -0.001 12.2 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 12.2
ETAP
Project: Page: 42
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Bus332 0.231 B 89.158 91.9 0 0 0.003 0.002 Bus333 A 0.000 0.000 0.0 0.0
B -0.003 -0.002 17.5 85.0
C 0.000 0.000 0.0 0.0
N 17.5
Bus334 0.231 C 85.873 -27.5 0 0 0.004 0.002 Bus333 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.004 -0.002 23.0 85.0
N 23.0
Bus339 0.231 A 56.424 -138.0 0 0 0.007 0.004 Bus341 A -0.007 -0.004 59.5 85.0
B 0.000 0.000 0.0 0.0
C 0.000 0.000 0.0 0.0
N 59.5
Bus340 0.231 B 55.349 103.0 0 0 0.007 0.004 Bus341 A 0.000 0.000 0.0 0.0
B -0.007 -0.004 61.3 85.0
C 0.000 0.000 0.0 0.0
N 61.3
Bus342 0.231 C 61.279 -19.9 0 0 0.010 0.006 Bus341 A 0.000 0.000 0.0 0.0
B 0.000 0.000 0.0 0.0
C -0.010 -0.006 80.3 85.0
N 80.3
* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
* Indicates operating load of a bus exceeds the bus critical limit ( 100.00 % times the continuous rating).
ETAP
Project: Page: 49
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Conn. Type Phase (Amp) Amp % (MVA) MVA % MVA %
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Conn. Type Phase (Amp) Amp % (MVA) MVA % MVA %
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Conn. Type Phase (Amp) Amp % (MVA) MVA % MVA %
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Conn. Type Phase (Amp) Amp % (MVA) MVA % MVA %
B 27.62
C 49.23
EB 3-Phase Cable A 11.69
B 17.24
C 23.34
EC 3-Phase Cable A 18.06
B 16.01
C 17.99
ED 3-Phase Cable A 11.60
B 11.43
C 17.42
EE 3-Phase Cable A 14.37
B 2.35
C 7.09
EF 3-Phase Cable A 1.49
B 0.74
C 3.70
G 3-Phase Cable A 59.49
B 61.27
C 80.29
HYDRANT 3-Phase Cable A 2.34
B 2.35
C 2.33
I 3-Phase Cable A 14.45
B 12.05
C 24.00
INDUK1 3-Phase Cable A 646.87
B 687.58
C 821.20
J 3-Phase Cable A 8.95
B 21.51
C 15.42
K 3-Phase Cable A 15.53
B 13.96
C 15.37
KOLAM 3-Phase Cable A 1.50
B 1.49
C 1.48
MA 3-Phase Cable A 24.16
B 21.48
C 23.01
MB 3-Phase Cable A 15.34
ETAP
Project: Page: 53
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Conn. Type Phase (Amp) Amp % (MVA) MVA % MVA %
B 11.47
C 14.07
mc 3-Phase Cable A 12.25
B 7.40
C 18.98
MD 3-Phase Cable A 12.03
B 12.12
C 16.84
ME 3-Phase Cable A 7.75
B 19.86
C 13.92
N 3-Phase Cable A 3.24
B 7.53
C 4.34
NA 3-Phase Cable A 60.36
B 64.21
C 74.44
NB 3-Phase Cable A 3.84
B 12.67
C 9.74
Pa 3-Phase Cable A 57.91
B 64.22
C 72.35
Pc 3-Phase Cable A 12.10
B 9.15
C 9.80
PD 3-Phase Cable A 2.33
B 2.32
C 2.32
SA 3-Phase Cable A 45.04
B 34.27
C 64.31
SB 3-Phase Cable A 4.59
B 7.72
C 24.04
Sc 3-Phase Cable A 12.24
B 17.48
C 23.00
WINGS 3-Phase Cable A 2.32
B 2.32
C 4.57
TRAFO PNB 3-Phase Transformer A 0.630 0.171 81.6 0.146 69.4
ETAP
Project: Page: 54
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Conn. Type Phase (Amp) Amp % (MVA) MVA % MVA %
Vd Amperes
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop in Buried
ID Phase MW Mvar MW Mvar kW kvar From To in Vmag Winding
2 A 0.004 0.002 -0.004 -0.002 0.0 0.0 96.6 95.9 0.67 0.00
B 0.003 0.002 -0.003 -0.002 0.0 0.0 96.4 95.7 0.62 0.00
C 0.003 0.002 -0.003 -0.002 0.0 0.0 95.6 95.1 0.56 0.00
A A 0.005 0.003 -0.005 -0.003 0.1 0.0 96.6 95.4 1.21 0.00
B 0.003 0.002 -0.003 -0.002 0.0 0.0 96.4 96.1 0.25 0.00
C 0.006 0.003 -0.006 -0.003 0.1 0.0 95.6 94.2 1.41 0.00
AA A 0.010 0.004 -0.010 -0.004 0.2 0.0 96.6 95.2 1.37 0.00
B 0.010 0.005 -0.010 -0.005 0.2 0.0 96.4 94.9 1.50 0.00
C 0.012 0.005 -0.012 -0.005 0.3 0.0 95.6 93.4 2.19 0.00
AB A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 96.6 0.05 0.00
B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 96.3 0.05 0.00
C 0.000 0.000 0.000 0.000 0.0 0.0 95.6 95.6 0.05 0.00
B A 0.007 0.004 -0.007 -0.004 0.1 0.0 96.6 96.0 0.60 0.00
B 0.012 0.006 -0.011 -0.006 0.3 -0.1 96.4 94.8 1.60 0.00
C 0.014 0.007 -0.014 -0.007 0.5 0.1 95.6 92.9 2.75 0.00
C A 0.001 0.000 -0.001 0.000 0.0 0.0 96.6 96.5 0.11 0.00
B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 96.3 0.02 0.00
C 0.000 0.000 0.000 0.000 0.0 0.0 95.6 95.6 0.01 0.00
Cable R A 0.010 0.005 -0.007 -0.005 2.5 0.0 94.3 75.4 18.91 0.00
Cable S B 0.011 0.006 -0.009 -0.006 2.3 0.0 92.0 77.1 14.92 0.00
Cable T C 0.001 0.001 -0.001 -0.001 0.0 0.0 96.8 95.9 0.88 0.00
Cable10 A 0.003 0.002 -0.003 -0.002 0.2 0.0 96.5 92.4 4.11 0.00
Cable11 B 0.003 0.002 -0.003 -0.002 0.2 0.0 96.3 92.6 3.64 0.00
Cable12 C 0.003 0.002 -0.003 -0.002 0.2 0.0 95.5 91.4 4.09 0.00
Cable19 A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 96.1 0.54 0.00
Cable20 B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 96.1 0.27 0.00
Cable21 C 0.001 0.000 -0.001 0.000 0.0 0.0 95.6 94.2 1.34 0.00
Cable49 A 0.010 0.004 -0.007 -0.004 2.4 0.1 95.2 75.5 19.73 0.00
Cable50 B 0.010 0.005 -0.007 -0.005 2.8 0.1 94.9 73.6 21.23 0.00
Cable51 C 0.012 0.005 -0.008 -0.005 3.8 0.1 93.4 68.5 24.98 0.00
Cable55 A 0.012 0.006 -0.009 -0.006 2.6 0.1 94.6 77.6 17.01 0.00
Cable56 B 0.013 0.006 -0.010 -0.006 3.0 0.1 94.2 76.1 18.13 0.00
Cable57 C 0.014 0.007 -0.010 -0.006 4.0 0.2 92.6 71.4 21.13 0.00
Cable58 A 0.001 0.000 -0.001 0.000 0.0 0.0 96.7 95.0 1.69 0.00
Cable59 B 0.002 0.001 -0.002 -0.001 0.2 0.0 96.2 90.6 5.60 0.00
Cable60 C 0.002 0.001 -0.002 -0.001 0.1 0.0 95.5 91.2 4.30 0.00
Cable61 A 0.011 0.006 -0.009 -0.006 2.4 0.1 94.8 78.4 16.39 0.00
Cable62 B 0.013 0.006 -0.010 -0.006 3.0 0.1 94.2 75.9 18.23 0.00
Cable63 C 0.014 0.006 -0.010 -0.006 3.8 0.2 92.6 72.0 20.62 0.00
Cable67 A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 95.1 1.49 0.00
Cable68 B 0.000 0.000 0.000 0.000 0.0 0.0 96.3 94.8 1.48 0.00
Cable69 C 0.000 0.000 0.000 0.000 0.0 0.0 95.6 94.1 1.48 0.00
ETAP
Project: Page: 56
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Vd Amperes
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop in Buried
ID Phase MW Mvar MW Mvar kW kvar From To in Vmag Winding
Cable73 A 0.004 0.002 -0.003 -0.002 0.4 0.0 95.9 87.4 8.53 0.00
Cable74 B 0.003 0.002 -0.003 -0.002 0.4 0.0 95.7 87.7 8.08 0.00
Cable75 C 0.003 0.002 -0.003 -0.002 0.4 0.0 95.1 87.2 7.88 0.00
Cable76 A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 96.4 0.20 0.00
Cable77 B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 96.2 0.20 0.00
Cable78 C 0.000 0.000 0.000 0.000 0.0 0.0 95.6 95.4 0.20 0.00
Cable79 A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 96.4 0.21 0.00
Cable80 B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 96.1 0.22 0.00
Cable81 C 0.000 0.000 0.000 0.000 0.0 0.0 95.6 95.4 0.21 0.00
Cable85 A 0.005 0.003 -0.004 -0.003 0.9 0.0 95.4 82.2 13.25 0.00
Cable86 B 0.003 0.002 -0.003 -0.002 0.4 0.0 96.1 87.7 8.40 0.00
Cable87 C 0.006 0.003 -0.005 -0.003 1.3 0.0 94.2 78.3 15.96 0.00
Cable88 A 0.007 0.004 -0.006 -0.004 0.9 0.0 96.0 87.3 8.73 0.00
Cable89 B 0.011 0.006 -0.009 -0.006 2.1 0.1 94.8 81.0 13.72 0.00
Cable90 C 0.014 0.007 -0.011 -0.007 3.0 0.1 92.9 76.3 16.57 0.00
Cable131 A 0.003 0.002 -0.003 -0.002 0.4 0.0 96.3 86.4 9.87 0.00
Cable132 B 0.002 0.001 -0.002 -0.001 0.2 0.0 96.2 88.8 7.35 0.00
Cable133 C 0.003 0.001 -0.002 -0.001 0.3 0.0 95.4 86.3 9.05 0.00
Cable137 A 0.005 0.002 -0.003 -0.002 2.3 0.0 95.4 57.7 37.74 0.00
Cable138 B 0.004 0.002 -0.003 -0.002 1.8 0.0 95.4 62.1 33.30 0.00
Cable139 C 0.005 0.002 -0.003 -0.002 2.1 0.0 94.5 58.7 35.84 0.00
Cable143 A 0.002 0.001 -0.002 -0.001 0.5 0.0 96.1 80.1 15.95 0.00
Cable144 B 0.001 0.001 -0.001 -0.001 0.2 0.0 96.4 86.8 9.53 0.00
Cable145 C 0.004 0.002 -0.003 -0.002 1.2 0.0 94.7 69.5 25.14 0.00
Cable149 A 0.002 0.001 -0.002 -0.001 0.3 0.0 96.2 85.4 10.80 0.00
Cable150 B 0.002 0.001 -0.002 -0.001 0.2 0.0 96.1 88.0 8.13 0.00
Cable151 C 0.002 0.001 -0.002 -0.001 0.2 0.0 95.4 86.7 8.71 0.00
Cable155 A 0.003 0.002 -0.003 -0.002 0.3 0.0 96.3 89.2 7.08 0.00
Cable156 B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 95.2 1.14 0.00
Cable157 C 0.001 0.001 -0.001 -0.001 0.1 0.0 95.6 92.1 3.47 0.00
Cable161 A 0.009 0.004 -0.007 -0.004 2.2 0.1 95.1 76.5 18.59 0.00
Cable162 B 0.007 0.003 -0.006 -0.003 1.3 0.0 95.9 81.8 14.04 0.00
Cable163 C 0.013 0.005 -0.008 -0.005 4.4 0.1 93.0 66.1 26.94 0.00
Cable167 A 0.002 0.001 -0.001 -0.001 0.3 0.0 96.6 83.5 13.12 0.00
Cable168 B 0.004 0.001 -0.002 -0.001 1.8 0.0 95.0 60.0 35.01 0.00
Cable169 C 0.003 0.001 -0.002 -0.001 0.9 0.0 94.8 70.7 24.07 0.00
Cable173 A 0.001 0.001 -0.001 -0.001 0.1 0.0 96.6 92.4 4.27 0.00
Cable174 B 0.002 0.001 -0.001 -0.001 0.1 0.0 96.4 89.2 7.23 0.00
Cable175 C 0.005 0.002 -0.003 -0.002 1.4 0.0 94.5 71.3 23.19 0.00
Cable179 A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 94.7 1.83 0.00
Cable180 B 0.000 0.000 0.000 0.000 0.0 0.0 96.3 94.5 1.82 0.00
Cable181 C 0.000 0.000 0.000 0.000 0.0 0.0 95.6 93.8 1.81 0.00
Cable185 A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 94.7 1.81 0.00
ETAP
Project: Page: 57
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Vd Amperes
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop in Buried
ID Phase MW Mvar MW Mvar kW kvar From To in Vmag Winding
Cable186 B 0.000 0.000 0.000 0.000 0.0 0.0 96.3 94.5 1.81 0.00
Cable187 C 0.001 0.001 -0.001 -0.001 0.0 0.0 95.4 91.9 3.58 0.00
Cable191 A 0.003 0.002 -0.003 -0.002 0.3 0.0 96.4 88.4 7.94 0.00
Cable192 B 0.002 0.001 -0.002 -0.001 0.2 0.0 96.3 89.7 6.61 0.00
Cable193 C 0.005 0.002 -0.004 -0.002 0.8 0.0 95.1 81.7 13.33 0.00
Cable200 A 0.002 0.001 -0.002 -0.001 0.2 0.0 96.6 86.4 10.20 0.00
Cable201 B 0.004 0.002 -0.003 -0.002 1.4 0.0 95.4 70.2 25.20 0.00
Cable202 C 0.003 0.001 -0.002 -0.001 0.7 0.0 95.0 77.2 17.83 0.00
Cable206 A 0.003 0.002 -0.003 -0.002 0.3 0.0 96.4 88.7 7.66 0.00
Cable207 B 0.003 0.002 -0.002 -0.002 0.3 0.0 96.2 89.3 6.87 0.00
Cable208 C 0.003 0.002 -0.003 -0.002 0.3 0.0 95.4 87.8 7.58 0.00
Cable218 A 0.001 0.000 -0.001 0.000 0.0 0.0 96.5 94.0 2.54 0.00
Cable219 B 0.000 0.000 0.000 0.000 0.0 0.0 96.3 95.5 0.82 0.00
Cable220 C 0.000 0.000 0.000 0.000 0.0 0.0 95.6 94.8 0.82 0.00
Cable221 A 0.001 0.000 -0.001 0.000 0.0 0.0 96.6 94.6 2.06 0.00
Cable222 B 0.001 0.001 -0.001 -0.001 0.1 0.0 96.2 91.4 4.80 0.00
Cable223 C 0.001 0.000 -0.001 0.000 0.0 0.0 95.5 92.8 2.76 0.00
Cable227 A 0.005 0.003 -0.005 -0.003 0.6 0.0 96.2 87.6 8.63 0.00
Cable228 B 0.005 0.003 -0.005 -0.003 0.6 0.0 96.2 87.7 8.46 0.00
Cable229 C 0.010 0.005 -0.008 -0.005 2.0 0.0 94.7 79.4 15.28 0.00
Cable233 A 0.002 0.001 -0.002 -0.001 0.0 0.0 96.6 95.2 1.41 0.00
Cable234 B 0.003 0.002 -0.003 -0.002 0.1 0.0 96.3 94.2 2.09 0.00
Cable235 C 0.004 0.003 -0.004 -0.003 0.2 0.0 95.4 92.6 2.83 0.00
Cable239 A 0.002 0.001 -0.002 -0.001 0.1 0.0 96.5 93.7 2.81 0.00
Cable240 B 0.002 0.001 -0.002 -0.001 0.1 0.0 96.3 93.5 2.77 0.00
Cable241 C 0.003 0.002 -0.003 -0.002 0.2 0.0 95.4 91.1 4.24 0.00
Cable242 A 0.002 0.001 -0.002 -0.001 0.4 0.0 96.1 84.6 11.49 0.00
Cable243 B 0.002 0.001 -0.002 -0.001 0.4 0.0 95.9 84.4 11.58 0.00
Cable244 C 0.003 0.002 -0.003 -0.002 0.7 0.0 94.7 78.5 16.23 0.00
Cable245 A 0.002 0.001 -0.002 -0.001 0.2 0.0 96.5 91.6 4.84 0.00
Cable246 B 0.003 0.002 -0.003 -0.002 0.3 0.0 96.1 89.2 6.94 0.00
Cable247 C 0.004 0.002 -0.004 -0.002 0.6 0.0 95.0 85.9 9.18 0.00
Cable251 A 0.012 0.004 -0.007 -0.004 5.6 0.1 93.8 56.4 37.40 0.00
Cable252 B 0.013 0.004 -0.007 -0.004 5.9 0.1 93.9 55.3 38.58 0.00
Cable253 C 0.016 0.006 -0.010 -0.006 6.0 0.3 91.1 61.3 29.86 0.00
D A 0.010 0.004 -0.010 -0.005 0.4 -0.2 96.6 94.3 2.30 0.00
B 0.012 0.006 -0.011 -0.006 0.6 0.2 96.4 92.0 4.38 0.00
C 0.001 0.001 -0.001 -0.001 0.0 0.0 95.6 96.8 1.13 0.00
EA A 0.006 0.003 -0.005 -0.003 0.0 0.0 96.6 96.2 0.38 0.00
B 0.005 0.003 -0.005 -0.003 0.0 0.0 96.4 96.2 0.21 0.00
C 0.010 0.005 -0.010 -0.005 0.1 0.0 95.6 94.7 0.97 0.00
EB A 0.002 0.001 -0.002 -0.001 0.0 0.0 96.6 96.6 0.04 0.00
B 0.003 0.002 -0.003 -0.002 0.0 0.0 96.4 96.3 0.07 0.00
ETAP
Project: Page: 58
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Vd Amperes
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop in Buried
ID Phase MW Mvar MW Mvar kW kvar From To in Vmag Winding
C 0.004 0.003 -0.004 -0.003 0.0 0.0 95.6 95.4 0.18 0.00
EC A 0.003 0.002 -0.003 -0.002 0.0 0.0 96.6 96.5 0.14 0.00
B 0.003 0.002 -0.003 -0.002 0.0 0.0 96.4 96.3 0.10 0.00
C 0.003 0.002 -0.003 -0.002 0.0 0.0 95.6 95.5 0.13 0.00
ED A 0.002 0.001 -0.002 -0.001 0.0 0.0 96.6 96.5 0.13 0.00
B 0.002 0.001 -0.002 -0.001 0.0 0.0 96.4 96.3 0.08 0.00
C 0.003 0.002 -0.003 -0.002 0.0 0.0 95.6 95.4 0.25 0.00
EE A 0.003 0.002 -0.003 -0.002 0.0 0.0 96.6 96.3 0.33 0.00
B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 96.4 0.02 0.00
C 0.001 0.001 -0.001 -0.001 0.0 0.0 95.6 95.6 0.03 0.00
EF A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 96.6 0.02 0.00
B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 96.4 0.02 0.00
C 0.001 0.000 -0.001 0.000 0.0 0.0 95.6 95.6 0.06 0.00
G A 0.013 0.004 -0.012 -0.004 0.4 0.1 96.6 93.8 2.80 0.00
B 0.013 0.004 -0.013 -0.004 0.4 -0.1 96.4 93.9 2.43 0.00
C 0.017 0.006 -0.016 -0.006 0.9 0.0 95.6 91.1 4.49 0.00
HYDRANT A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 96.6 0.01 0.00
B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 96.4 0.01 0.00
C 0.000 0.000 0.000 0.000 0.0 0.0 95.6 95.6 0.01 0.00
I A 0.003 0.002 -0.003 -0.002 0.0 0.0 96.6 96.4 0.26 0.00
B 0.002 0.001 -0.002 -0.001 0.0 0.0 96.4 96.3 0.07 0.00
C 0.005 0.002 -0.005 -0.002 0.0 0.0 95.6 95.1 0.56 0.00
INDUK1 A 0.131 0.064 -0.130 -0.063 1.3 0.5 97.5 96.6 0.90 0.00
B 0.140 0.067 -0.138 -0.066 1.6 0.4 97.4 96.4 1.01 0.00
C 0.167 0.077 -0.164 -0.076 2.3 0.8 96.9 95.6 1.26 0.00
J A 0.002 0.001 -0.002 -0.001 0.0 0.0 96.6 96.6 0.03 0.00
B 0.004 0.002 -0.004 -0.002 0.1 0.0 96.4 95.4 0.95 0.00
C 0.003 0.001 -0.003 -0.001 0.0 0.0 95.6 95.0 0.62 0.00
K A 0.003 0.002 -0.003 -0.002 0.0 0.0 96.6 96.4 0.24 0.00
B 0.003 0.002 -0.003 -0.002 0.0 0.0 96.4 96.2 0.19 0.00
C 0.003 0.002 -0.003 -0.002 0.0 0.0 95.6 95.4 0.22 0.00
KOLAM A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 96.6 0.01 0.00
B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 96.4 0.01 0.00
C 0.000 0.000 0.000 0.000 0.0 0.0 95.6 95.6 0.01 0.00
MA A 0.005 0.002 -0.005 -0.002 0.1 0.0 96.6 95.4 1.21 0.00
B 0.004 0.002 -0.004 -0.002 0.0 0.0 96.4 95.4 0.93 0.00
C 0.005 0.002 -0.005 -0.002 0.1 0.0 95.6 94.5 1.08 0.00
MB A 0.003 0.002 -0.003 -0.002 0.0 0.0 96.6 96.3 0.34 0.00
B 0.002 0.001 -0.002 -0.001 0.0 0.0 96.4 96.2 0.18 0.00
C 0.003 0.001 -0.003 -0.001 0.0 0.0 95.6 95.4 0.26 0.00
mc A 0.002 0.001 -0.002 -0.001 0.0 0.0 96.6 96.1 0.54 0.00
B 0.001 0.001 -0.001 -0.001 0.0 0.0 96.4 96.4 0.00 0.00
C 0.004 0.002 -0.004 -0.002 0.0 0.0 95.6 94.7 0.98 0.00
MD A 0.002 0.001 -0.002 -0.001 0.0 0.0 96.6 96.1 0.52 0.00
B 0.002 0.001 -0.002 -0.001 0.0 0.0 96.4 95.9 0.42 0.00
ETAP
Project: Page: 59
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Vd Amperes
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop in Buried
ID Phase MW Mvar MW Mvar kW kvar From To in Vmag Winding
C 0.003 0.002 -0.003 -0.002 0.0 0.0 95.6 94.7 0.95 0.00
ME A 0.002 0.001 -0.002 -0.001 0.0 0.0 96.6 96.6 0.01 0.00
B 0.004 0.001 -0.004 -0.001 0.1 0.0 96.4 95.0 1.35 0.00
C 0.003 0.001 -0.003 -0.001 0.0 0.0 95.6 94.8 0.81 0.00
N A 0.001 0.000 -0.001 0.000 0.0 0.0 96.6 96.6 0.01 0.00
B 0.001 0.001 -0.001 -0.001 0.0 0.0 96.4 96.2 0.19 0.00
C 0.001 0.000 -0.001 0.000 0.0 0.0 95.6 95.5 0.09 0.00
NA A 0.012 0.006 -0.012 -0.006 0.3 0.0 96.6 94.6 2.00 0.00
B 0.013 0.006 -0.013 -0.006 0.4 0.0 96.4 94.2 2.14 0.00
C 0.015 0.007 -0.014 -0.007 0.6 0.0 95.6 92.6 3.06 0.00
NB A 0.001 0.000 -0.001 0.000 0.0 0.0 96.6 96.7 0.03 0.00
B 0.002 0.001 -0.002 -0.001 0.0 0.0 96.4 96.2 0.20 0.00
C 0.002 0.001 -0.002 -0.001 0.0 0.0 95.6 95.5 0.18 0.00
Pa A 0.012 0.006 -0.011 -0.006 0.3 0.0 96.6 94.8 1.87 0.00
B 0.013 0.006 -0.013 -0.006 0.4 0.0 96.4 94.2 2.20 0.00
C 0.015 0.007 -0.014 -0.006 0.5 0.0 95.6 92.6 2.99 0.00
Pc A 0.002 0.001 -0.002 -0.001 0.0 0.0 96.6 96.2 0.38 0.00
B 0.002 0.001 -0.002 -0.001 0.0 0.0 96.4 96.1 0.22 0.00
C 0.002 0.001 -0.002 -0.001 0.0 0.0 95.6 95.4 0.22 0.00
PD A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 96.6 0.05 0.00
B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 96.3 0.05 0.00
C 0.000 0.000 0.000 0.000 0.0 0.0 95.6 95.6 0.05 0.00
SA A 0.009 0.004 -0.009 -0.004 0.1 0.1 96.6 95.1 1.48 0.00
B 0.007 0.003 -0.007 -0.003 0.1 0.0 96.4 95.9 0.49 0.00
C 0.013 0.005 -0.013 -0.005 0.4 0.0 95.6 93.0 2.59 0.00
SB A 0.001 0.001 -0.001 -0.001 0.0 0.0 96.6 96.6 0.01 0.00
B 0.002 0.001 -0.002 -0.001 0.0 0.0 96.4 96.4 0.06 0.00
C 0.005 0.002 -0.005 -0.002 0.1 0.0 95.6 94.5 1.10 0.00
Sc A 0.002 0.001 -0.002 -0.001 0.0 0.0 96.6 96.5 0.15 0.00
B 0.003 0.002 -0.003 -0.002 0.0 0.0 96.4 96.1 0.27 0.00
C 0.004 0.002 -0.004 -0.002 0.0 0.0 95.6 95.0 0.58 0.00
WINGS A 0.000 0.000 0.000 0.000 0.0 0.0 96.6 96.6 0.07 0.00
B 0.000 0.000 0.000 0.000 0.0 0.0 96.4 96.3 0.02 0.00
C 0.001 0.001 -0.001 -0.001 0.0 0.0 95.6 95.4 0.20 0.00
TRAFO PNB A 0.148 0.087 -0.131 -0.064 16.7 23.1 100.0 97.5 2.48 0.00
B 0.139 0.067 -0.140 -0.067 -0.6 0.8 100.0 97.4 2.62 0.00
C 0.160 0.070 -0.167 -0.077 -6.5 -7.7 100.0 96.9 3.11 0.00
118.0 20.2
For branches below center-tap transformers, Phases A, B, and C correspond to (1), (2), and (N) respectively.
ETAP
Project: Page: 60
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
% Alert Settings
Critical
Loading
Bus 100.0
Cable 100.0
Reactor 100.0
Line 100.0
Transformer 100.0
Panel 100.0
Generator 100.0
Inverter/Charger 100.0
Bus Voltage
OverVoltage 105.0
UnderVoltage 95.0
Generator Excitation
OverExcited (Q Max.) 100.0
% Alert Settings
Critical
Bus Voltage
Line Voltage Unbalanced Rate (LVUR) 3.0
Branch Current
Line Current Unbalanced Rate (LIUR) 3.0
Critical Report
Device ID Type Condition Rating/Limit Unit Operating A Operating B Operating C %Op. A %Op. B %Op. C
Bus Gedung D Bus Under Voltage 0.400 kV 0.218 0.212 0.223 94.3 92.0 96.8
Bus16 Bus Under Voltage 0.231 kV 0.213 0.000 0.000 92.4 0.0 0.0
Bus17 Bus Under Voltage 0.231 kV 0.000 0.214 0.000 0.0 92.6 0.0
Bus19 Bus Under Voltage 0.231 kV 0.000 0.000 0.211 0.0 0.0 91.4
Bus31 Bus Under Voltage 0.231 kV 0.000 0.000 0.218 0.0 0.0 94.2
Bus68 Bus Under Voltage 0.231 kV 0.174 0.000 0.000 75.5 0.0 0.0
Bus69 Bus Under Voltage 0.231 kV 0.000 0.170 0.000 0.0 73.6 0.0
Bus70 Bus Under Voltage 0.400 kV 0.220 0.219 0.216 95.2 94.9 93.4
Bus71 Bus Under Voltage 0.231 kV 0.000 0.000 0.158 0.0 0.0 68.5
Bus76 Bus Under Voltage 0.231 kV 0.179 0.000 0.000 77.6 0.0 0.0
Bus77 Bus Under Voltage 0.231 kV 0.000 0.176 0.000 0.0 76.1 0.0
Bus78 Bus Under Voltage 0.400 kV 0.219 0.218 0.214 94.6 94.2 92.6
Bus79 Bus Under Voltage 0.231 kV 0.000 0.000 0.165 0.0 0.0 71.4
Bus80 Bus Under Voltage 0.231 kV 0.219 0.000 0.000 95.0 0.0 0.0
Bus81 Bus Under Voltage 0.231 kV 0.000 0.209 0.000 0.0 90.6 0.0
Bus83 Bus Under Voltage 0.231 kV 0.000 0.000 0.211 0.0 0.0 91.2
Bus84 Bus Under Voltage 0.231 kV 0.181 0.000 0.000 78.4 0.0 0.0
Bus85 Bus Under Voltage 0.231 kV 0.000 0.175 0.000 0.0 75.9 0.0
Bus86 Bus Under Voltage 0.400 kV 0.219 0.217 0.214 94.8 94.2 92.6
Bus87 Bus Under Voltage 0.231 kV 0.000 0.000 0.166 0.0 0.0 72.0
Bus93 Bus Under Voltage 0.231 kV 0.000 0.219 0.000 0.0 94.8 0.0
Bus95 Bus Under Voltage 0.231 kV 0.000 0.000 0.217 0.0 0.0 94.1
Bus100 Bus Under Voltage 0.231 kV 0.202 0.000 0.000 87.4 0.0 0.0
Bus101 Bus Under Voltage 0.231 kV 0.000 0.202 0.000 0.0 87.7 0.0
Bus103 Bus Under Voltage 0.231 kV 0.000 0.000 0.201 0.0 0.0 87.2
Bus116 Bus Under Voltage 0.231 kV 0.190 0.000 0.000 82.2 0.0 0.0
Bus117 Bus Under Voltage 0.231 kV 0.000 0.203 0.000 0.0 87.7 0.0
Bus118 Bus Under Voltage 0.400 kV 0.220 0.222 0.218 95.4 96.1 94.2
Bus119 Bus Under Voltage 0.231 kV 0.000 0.000 0.181 0.0 0.0 78.3
Bus120 Bus Under Voltage 0.231 kV 0.202 0.000 0.000 87.3 0.0 0.0
Bus121 Bus Under Voltage 0.231 kV 0.000 0.187 0.000 0.0 81.0 0.0
Bus122 Bus Under Voltage 0.400 kV 0.222 0.219 0.214 96.0 94.8 92.9
Bus123 Bus Under Voltage 0.231 kV 0.000 0.000 0.176 0.0 0.0 76.3
Bus179 Bus Under Voltage 0.231 kV 0.200 0.000 0.000 86.4 0.0 0.0
Bus180 Bus Under Voltage 0.231 kV 0.000 0.205 0.000 0.0 88.8 0.0
Bus182 Bus Under Voltage 0.231 kV 0.000 0.000 0.199 0.0 0.0 86.3
Bus187 Bus Under Voltage 0.231 kV 0.133 0.000 0.000 57.7 0.0 0.0
Bus188 Bus Under Voltage 0.231 kV 0.000 0.143 0.000 0.0 62.1 0.0
Bus189 Bus Under Voltage 0.400 kV 0.220 0.220 0.218 95.4 95.4 94.5
Bus190 Bus Under Voltage 0.231 kV 0.000 0.000 0.136 0.0 0.0 58.7
Bus195 Bus Under Voltage 0.231 kV 0.185 0.000 0.000 80.1 0.0 0.0
Bus196 Bus Under Voltage 0.231 kV 0.000 0.201 0.000 0.0 86.8 0.0
ETAP
Project: Page: 62
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Critical Report
Device ID Type Condition Rating/Limit Unit Operating A Operating B Operating C %Op. A %Op. B %Op. C
Bus197 Bus Under Voltage 0.400 kV 0.222 0.223 0.219 96.1 96.4 94.7
Bus198 Bus Under Voltage 0.231 kV 0.000 0.000 0.161 0.0 0.0 69.5
Bus203 Bus Under Voltage 0.231 kV 0.197 0.000 0.000 85.4 0.0 0.0
Bus204 Bus Under Voltage 0.231 kV 0.000 0.203 0.000 0.0 88.0 0.0
Bus206 Bus Under Voltage 0.231 kV 0.000 0.000 0.200 0.0 0.0 86.7
Bus211 Bus Under Voltage 0.231 kV 0.206 0.000 0.000 89.2 0.0 0.0
Bus214 Bus Under Voltage 0.231 kV 0.000 0.000 0.213 0.0 0.0 92.1
Bus219 Bus Under Voltage 0.231 kV 0.177 0.000 0.000 76.5 0.0 0.0
Bus220 Bus Under Voltage 0.231 kV 0.000 0.189 0.000 0.0 81.8 0.0
Bus221 Bus Under Voltage 0.400 kV 0.220 0.221 0.215 95.1 95.9 93.0
Bus222 Bus Under Voltage 0.231 kV 0.000 0.000 0.153 0.0 0.0 66.1
Bus227 Bus Under Voltage 0.231 kV 0.193 0.000 0.000 83.5 0.0 0.0
Bus228 Bus Under Voltage 0.231 kV 0.000 0.139 0.000 0.0 60.0 0.0
Bus229 Bus Under Voltage 0.400 kV 0.223 0.219 0.219 96.6 95.0 94.8
Bus230 Bus Under Voltage 0.231 kV 0.000 0.000 0.163 0.0 0.0 70.7
Bus235 Bus Under Voltage 0.231 kV 0.213 0.000 0.000 92.4 0.0 0.0
Bus236 Bus Under Voltage 0.231 kV 0.000 0.206 0.000 0.0 89.2 0.0
Bus237 Bus Under Voltage 0.400 kV 0.223 0.223 0.218 96.6 96.4 94.5
Bus238 Bus Under Voltage 0.231 kV 0.000 0.000 0.165 0.0 0.0 71.3
Bus243 Bus Under Voltage 0.231 kV 0.219 0.000 0.000 94.7 0.0 0.0
Bus244 Bus Under Voltage 0.231 kV 0.000 0.218 0.000 0.0 94.5 0.0
Bus246 Bus Under Voltage 0.231 kV 0.000 0.000 0.217 0.0 0.0 93.8
Bus251 Bus Under Voltage 0.231 kV 0.219 0.000 0.000 94.7 0.0 0.0
Bus252 Bus Under Voltage 0.231 kV 0.000 0.218 0.000 0.0 94.5 0.0
Bus254 Bus Under Voltage 0.231 kV 0.000 0.000 0.212 0.0 0.0 91.9
Bus259 Bus Under Voltage 0.231 kV 0.204 0.000 0.000 88.4 0.0 0.0
Bus260 Bus Under Voltage 0.231 kV 0.000 0.207 0.000 0.0 89.7 0.0
Bus262 Bus Under Voltage 0.231 kV 0.000 0.000 0.189 0.0 0.0 81.7
Bus271 Bus Under Voltage 0.231 kV 0.200 0.000 0.000 86.4 0.0 0.0
Bus272 Bus Under Voltage 0.231 kV 0.000 0.162 0.000 0.0 70.2 0.0
Bus274 Bus Under Voltage 0.231 kV 0.000 0.000 0.178 0.0 0.0 77.2
Bus279 Bus Under Voltage 0.231 kV 0.205 0.000 0.000 88.7 0.0 0.0
Bus280 Bus Under Voltage 0.231 kV 0.000 0.206 0.000 0.0 89.3 0.0
Bus282 Bus Under Voltage 0.231 kV 0.000 0.000 0.203 0.0 0.0 87.8
Bus287 Bus Under Voltage 0.231 kV 0.174 0.000 0.000 75.4 0.0 0.0
Bus288 Bus Under Voltage 0.231 kV 0.000 0.178 0.000 0.0 77.1 0.0
Bus295 Bus Under Voltage 0.231 kV 0.217 0.000 0.000 94.0 0.0 0.0
Bus298 Bus Under Voltage 0.231 kV 0.000 0.000 0.219 0.0 0.0 94.8
Bus299 Bus Under Voltage 0.231 kV 0.218 0.000 0.000 94.6 0.0 0.0
Bus300 Bus Under Voltage 0.231 kV 0.000 0.211 0.000 0.0 91.4 0.0
Bus302 Bus Under Voltage 0.231 kV 0.000 0.000 0.214 0.0 0.0 92.8
Bus307 Bus Under Voltage 0.231 kV 0.202 0.000 0.000 87.6 0.0 0.0
ETAP
Project: Page: 63
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Critical Report
Device ID Type Condition Rating/Limit Unit Operating A Operating B Operating C %Op. A %Op. B %Op. C
Bus308 Bus Under Voltage 0.231 kV 0.000 0.203 0.000 0.0 87.7 0.0
Bus309 Bus Under Voltage 0.400 kV 0.222 0.222 0.219 96.2 96.2 94.7
Bus310 Bus Under Voltage 0.231 kV 0.000 0.000 0.183 0.0 0.0 79.4
Bus316 Bus Under Voltage 0.231 kV 0.000 0.218 0.000 0.0 94.2 0.0
Bus318 Bus Under Voltage 0.231 kV 0.000 0.000 0.214 0.0 0.0 92.6
Bus323 Bus Under Voltage 0.231 kV 0.216 0.000 0.000 93.7 0.0 0.0
Bus324 Bus Under Voltage 0.231 kV 0.000 0.216 0.000 0.0 93.5 0.0
Bus326 Bus Under Voltage 0.231 kV 0.000 0.000 0.210 0.0 0.0 91.1
Bus327 Bus Under Voltage 0.231 kV 0.195 0.000 0.000 84.6 0.0 0.0
Bus328 Bus Under Voltage 0.231 kV 0.000 0.195 0.000 0.0 84.4 0.0
Bus329 Bus Under Voltage 0.400 kV 0.222 0.222 0.219 96.1 95.9 94.7
Bus330 Bus Under Voltage 0.231 kV 0.000 0.000 0.181 0.0 0.0 78.5
Bus331 Bus Under Voltage 0.231 kV 0.212 0.000 0.000 91.6 0.0 0.0
Bus332 Bus Under Voltage 0.231 kV 0.000 0.206 0.000 0.0 89.2 0.0
Bus334 Bus Under Voltage 0.231 kV 0.000 0.000 0.198 0.0 0.0 85.9
Bus339 Bus Under Voltage 0.231 kV 0.130 0.000 0.000 56.4 0.0 0.0
Bus340 Bus Under Voltage 0.231 kV 0.000 0.128 0.000 0.0 55.3 0.0
Bus341 Bus Under Voltage 0.400 kV 0.217 0.217 0.210 93.8 93.9 91.1
Bus342 Bus Under Voltage 0.231 kV 0.000 0.000 0.142 0.0 0.0 61.3
2 Cable LIUR (Pos. Seq.) 17.600 Amp 0.778 0.183 0.595 4.4 1.0 3.4
A Cable LIUR (Pos. Seq.) 24.735 Amp 1.419 8.025 6.606 5.7 32.4 26.7
A Cable IUF 2 (Neg. Seq.) 24.731 Amp 4.376 4.376 4.376 17.7 17.7 17.7
A Cable IUF 0 (Zero Seq.) 24.731 Amp 4.212 4.212 4.212 17.0 17.0 17.0
AA Cable LIUR (Pos. Seq.) 52.906 Amp 5.199 1.722 6.921 9.8 3.3 13.1
AA Cable IUF 2 (Neg. Seq.) 52.901 Amp 3.690 3.690 3.690 7.0 7.0 7.0
AA Cable IUF 0 (Zero Seq.) 52.901 Amp 3.583 3.583 3.583 6.8 6.8 6.8
B Cable LIUR (Pos. Seq.) 55.635 Amp 17.986 3.079 14.907 32.3 5.5 26.8
B Cable IUF 2 (Neg. Seq.) 55.624 Amp 9.747 9.747 9.747 17.5 17.5 17.5
B Cable IUF 0 (Zero Seq.) 55.624 Amp 9.553 9.553 9.553 17.2 17.2 17.2
C Cable LIUR (Pos. Seq.) 1.781 Amp 1.463 0.730 0.733 82.1 41.0 41.1
C Cable IUF 2 (Neg. Seq.) 1.781 Amp 0.730 0.730 0.730 41.0 41.0 41.0
C Cable IUF 0 (Zero Seq.) 1.781 Amp 0.732 0.732 0.732 41.1 41.1 41.1
Cable R Cable Overload 33.840 Amp 49.557 0.000 0.000 146.4 0.0 0.0
Cable S Cable Overload 33.840 Amp 0.000 59.411 0.000 0.0 175.6 0.0
Cable229 Cable Overload 33.840 Amp 0.000 0.000 49.227 0.0 0.0 145.5
D Cable LIUR (Pos. Seq.) 38.674 Amp 10.877 20.730 31.607 28.1 53.6 81.7
D Cable IUF 2 (Neg. Seq.) 38.646 Amp 16.829 16.829 16.829 43.5 43.5 43.5
D Cable IUF 0 (Zero Seq.) 38.646 Amp 15.317 15.317 15.317 39.6 39.6 39.6
EA Cable LIUR (Pos. Seq.) 35.000 Amp 6.842 7.383 14.225 19.5 21.1 40.6
EA Cable IUF 2 (Neg. Seq.) 34.992 Amp 7.170 7.170 7.170 20.5 20.5 20.5
EA Cable IUF 0 (Zero Seq.) 34.992 Amp 7.095 7.095 7.095 20.3 20.3 20.3
EB Cable LIUR (Pos. Seq.) 17.423 Amp 5.733 0.186 5.919 32.9 1.1 34.0
ETAP
Project: Page: 64
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Critical Report
Device ID Type Condition Rating/Limit Unit Operating A Operating B Operating C %Op. A %Op. B %Op. C
EB Cable IUF 2 (Neg. Seq.) 17.423 Amp 3.373 3.373 3.373 19.4 19.4 19.4
EB Cable IUF 0 (Zero Seq.) 17.423 Amp 3.357 3.357 3.357 19.3 19.3 19.3
EC Cable LIUR (Pos. Seq.) 17.354 Amp 0.704 1.344 0.640 4.1 7.7 3.7
EC Cable IUF 2 (Neg. Seq.) 17.354 Amp 0.652 0.652 0.652 3.8 3.8 3.8
EC Cable IUF 0 (Zero Seq.) 17.354 Amp 0.693 0.693 0.693 4.0 4.0 4.0
ED Cable LIUR (Pos. Seq.) 13.484 Amp 1.882 2.053 3.935 14.0 15.2 29.2
ED Cable IUF 2 (Neg. Seq.) 13.484 Amp 1.971 1.971 1.971 14.6 14.6 14.6
ED Cable IUF 0 (Zero Seq.) 13.484 Amp 1.966 1.966 1.966 14.6 14.6 14.6
EE Cable LIUR (Pos. Seq.) 7.932 Amp 6.435 5.588 0.846 81.1 70.5 10.7
EE Cable IUF 2 (Neg. Seq.) 7.932 Amp 3.454 3.454 3.454 43.5 43.5 43.5
EE Cable IUF 0 (Zero Seq.) 7.932 Amp 3.541 3.541 3.541 44.6 44.6 44.6
EF Cable LIUR (Pos. Seq.) 1.977 Amp 0.490 1.234 1.725 24.8 62.4 87.2
EF Cable IUF 2 (Neg. Seq.) 1.977 Amp 0.889 0.889 0.889 45.0 45.0 45.0
EF Cable IUF 0 (Zero Seq.) 1.977 Amp 0.889 0.889 0.889 44.9 44.9 44.9
G Cable LIUR (Pos. Seq.) 67.015 Amp 7.525 5.748 13.273 11.2 8.6 19.8
G Cable IUF 2 (Neg. Seq.) 66.999 Amp 7.115 7.115 7.115 10.6 10.6 10.6
G Cable IUF 0 (Zero Seq.) 66.999 Amp 6.336 6.336 6.336 9.5 9.5 9.5
I Cable LIUR (Pos. Seq.) 16.831 Amp 2.383 4.785 7.168 14.2 28.4 42.6
I Cable IUF 2 (Neg. Seq.) 16.828 Amp 3.688 3.688 3.688 21.9 21.9 21.9
I Cable IUF 0 (Zero Seq.) 16.828 Amp 3.626 3.626 3.626 21.5 21.5 21.5
INDUK1 Cable LIUR (Pos. Seq.) 718.550 Amp 71.683 30.966 102.649 10.0 4.3 14.3
INDUK1 Cable IUF 2 (Neg. Seq.) 718.537 Amp 53.432 53.432 53.432 7.4 7.4 7.4
INDUK1 Cable IUF 0 (Zero Seq.) 718.537 Amp 52.045 52.045 52.045 7.2 7.2 7.2
J Cable LIUR (Pos. Seq.) 15.289 Amp 6.343 6.215 0.128 41.5 40.7 0.8
J Cable IUF 2 (Neg. Seq.) 15.278 Amp 3.784 3.784 3.784 24.8 24.8 24.8
J Cable IUF 0 (Zero Seq.) 15.278 Amp 3.507 3.507 3.507 23.0 23.0 23.0
K Cable LIUR (Pos. Seq.) 14.953 Amp 0.579 0.994 0.415 3.9 6.6 2.8
K Cable IUF 2 (Neg. Seq.) 14.953 Amp 0.483 0.483 0.483 3.2 3.2 3.2
K Cable IUF 0 (Zero Seq.) 14.953 Amp 0.516 0.516 0.516 3.5 3.5 3.5
MA Cable LIUR (Pos. Seq.) 22.879 Amp 1.276 1.402 0.125 5.6 6.1 0.5
MA Cable IUF 2 (Neg. Seq.) 22.877 Amp 0.783 0.783 0.783 3.4 3.4 3.4
MA Cable IUF 0 (Zero Seq.) 22.877 Amp 0.807 0.807 0.807 3.5 3.5 3.5
MB Cable LIUR (Pos. Seq.) 13.623 Amp 1.710 2.158 0.448 12.6 15.8 3.3
MB Cable IUF 2 (Neg. Seq.) 13.622 Amp 1.122 1.122 1.122 8.2 8.2 8.2
MB Cable IUF 0 (Zero Seq.) 13.622 Amp 1.159 1.159 1.159 8.5 8.5 8.5
mc Cable LIUR (Pos. Seq.) 12.871 Amp 0.631 5.472 6.103 4.9 42.5 47.4
mc Cable IUF 2 (Neg. Seq.) 12.861 Amp 3.476 3.476 3.476 27.0 27.0 27.0
mc Cable IUF 0 (Zero Seq.) 12.861 Amp 3.270 3.270 3.270 25.4 25.4 25.4
MD Cable LIUR (Pos. Seq.) 13.656 Amp 1.630 1.544 3.174 11.9 11.3 23.2
MD Cable IUF 2 (Neg. Seq.) 13.655 Amp 1.602 1.602 1.602 11.7 11.7 11.7
MD Cable IUF 0 (Zero Seq.) 13.655 Amp 1.583 1.583 1.583 11.6 11.6 11.6
ME Cable LIUR (Pos. Seq.) 13.837 Amp 6.100 6.021 0.078 44.1 43.5 0.6
ETAP
Project: Page: 65
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
Critical Report
Device ID Type Condition Rating/Limit Unit Operating A Operating B Operating C %Op. A %Op. B %Op. C
ME Cable IUF 2 (Neg. Seq.) 13.818 Amp 3.713 3.713 3.713 26.9 26.9 26.9
ME Cable IUF 0 (Zero Seq.) 13.818 Amp 3.351 3.351 3.351 24.3 24.3 24.3
N Cable LIUR (Pos. Seq.) 5.036 Amp 1.795 2.495 0.700 35.6 49.5 13.9
N Cable IUF 2 (Neg. Seq.) 5.036 Amp 1.299 1.299 1.299 25.8 25.8 25.8
N Cable IUF 0 (Zero Seq.) 5.036 Amp 1.275 1.275 1.275 25.3 25.3 25.3
NA Cable LIUR (Pos. Seq.) 66.330 Amp 5.978 2.129 8.107 9.0 3.2 12.2
NA Cable IUF 2 (Neg. Seq.) 66.326 Amp 4.332 4.332 4.332 6.5 6.5 6.5
NA Cable IUF 0 (Zero Seq.) 66.326 Amp 4.133 4.133 4.133 6.2 6.2 6.2
NB Cable LIUR (Pos. Seq.) 8.750 Amp 4.908 3.919 0.989 56.1 44.8 11.3
NB Cable IUF 2 (Neg. Seq.) 8.750 Amp 2.629 2.629 2.629 30.0 30.0 30.0
NB Cable IUF 0 (Zero Seq.) 8.750 Amp 2.563 2.563 2.563 29.3 29.3 29.3
Pa Cable LIUR (Pos. Seq.) 64.818 Amp 6.916 0.607 7.523 10.7 0.9 11.6
Pa Cable IUF 2 (Neg. Seq.) 64.814 Amp 4.310 4.310 4.310 6.7 6.7 6.7
Pa Cable IUF 0 (Zero Seq.) 64.814 Amp 4.104 4.104 4.104 6.3 6.3 6.3
Pc Cable LIUR (Pos. Seq.) 10.344 Amp 1.751 1.199 0.553 16.9 11.6 5.3
Pc Cable IUF 2 (Neg. Seq.) 10.344 Amp 0.886 0.886 0.886 8.6 8.6 8.6
Pc Cable IUF 0 (Zero Seq.) 10.344 Amp 0.909 0.909 0.909 8.8 8.8 8.8
SA Cable LIUR (Pos. Seq.) 47.868 Amp 2.836 13.599 16.435 5.9 28.4 34.3
SA Cable IUF 2 (Neg. Seq.) 47.840 Amp 9.163 9.163 9.163 19.2 19.2 19.2
SA Cable IUF 0 (Zero Seq.) 47.840 Amp 8.551 8.551 8.551 17.9 17.9 17.9
SB Cable LIUR (Pos. Seq.) 12.111 Amp 7.529 4.392 11.921 62.2 36.3 98.4
SB Cable IUF 2 (Neg. Seq.) 12.096 Amp 5.960 5.960 5.960 49.3 49.3 49.3
SB Cable IUF 0 (Zero Seq.) 12.096 Amp 6.127 6.127 6.127 50.7 50.7 50.7
Sc Cable LIUR (Pos. Seq.) 17.571 Amp 5.333 0.097 5.430 30.3 0.6 30.9
Sc Cable IUF 2 (Neg. Seq.) 17.570 Amp 3.108 3.108 3.108 17.7 17.7 17.7
Sc Cable IUF 0 (Zero Seq.) 17.570 Amp 3.112 3.112 3.112 17.7 17.7 17.7
WINGS Cable LIUR (Pos. Seq.) 3.063 Amp 0.752 0.750 1.502 24.6 24.5 49.0
WINGS Cable IUF 2 (Neg. Seq.) 3.063 Amp 0.751 0.751 0.751 24.5 24.5 24.5
WINGS Cable IUF 0 (Zero Seq.) 3.063 Amp 0.750 0.750 0.750 24.5 24.5 24.5
TRAFO PNB 2W XFMR LIUR (Pos. Seq.) 718.550 Amp 71.683 30.966 102.649 10.0 4.3 14.3
TRAFO PNB 2W XFMR IUF 2 (Neg. Seq.) 718.537 Amp 53.432 53.432 53.432 7.4 7.4 7.4
TRAFO PNB 2W XFMR IUF 0 (Zero Seq.) 718.537 Amp 52.045 52.045 52.045 7.2 7.2 7.2
For buses and branches below center-tap transformers, Phases A, B, and C correspond to (1), (2), and (N) respectively.
ETAP
Project: Page: 66
12.6.0H
Location: Date: 11-08-2019
Contract: SN:
Engineer: Revision: Base
Study Case: ULF
Filename: tugasakhirrevisi Config.: Normal
B 0 0 0
C 0 0 0
B 0.033 0.002
C 0.039 -0.006
Number of Iterations: 5