0% found this document useful (0 votes)
204 views2 pages

Hydrostatic Air Tests PDF

The document summarizes the results of hydrostatic tests conducted on sanitary drainlines, inspection chambers, sewers, and manholes according to specified test methods. It also summarizes the results of air tests conducted on sanitary plumbing systems according to another specified test method. Test results are presented in tabulated form listing the section tested, diameter, length, date of test, rate of water loss, and pass/fail result for the hydrostatic tests, and listing the block, storey level, unit number, date of first test, first test result, and date of final retest for the air tests. The tests were performed, witnessed, and certified by named professionals.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
204 views2 pages

Hydrostatic Air Tests PDF

The document summarizes the results of hydrostatic tests conducted on sanitary drainlines, inspection chambers, sewers, and manholes according to specified test methods. It also summarizes the results of air tests conducted on sanitary plumbing systems according to another specified test method. Test results are presented in tabulated form listing the section tested, diameter, length, date of test, rate of water loss, and pass/fail result for the hydrostatic tests, and listing the block, storey level, unit number, date of first test, first test result, and date of final retest for the air tests. The tests were performed, witnessed, and certified by named professionals.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Result of Hydrostatic Tests  

on Sanitary Drainlines, Inspection Chambers, Sewer, Manholes 

         

Project Reference: 

Project Title: 

Test Method:    *(a) water test method as specified in the Code of Practice on Sewerage and Sanitary Works, or   

*(b) water test method as specified in Clause 13.3 of BS EN 1610:1998. 

                             (* to delete if not applicable) 

Test Results: as tabulated below. 

Section of  Diameter  Length of  Date of  Rate of  Result 


drainlines/sewers (eg.  Pipe  test   Water 
(mm)  (Pass/Fail) 
IC1‐IC2, IC‐MH);  Loss (l/s) 
(m) 
 

Inspection 
chamber/manhole 

     

           

           

           

           

     

Tested/Checked by:   Signature:  Company &  Date: 


Designation: 
(Name of plumbing contractor in charge 
of test)  

Witnessed by:  Signature: Company &  Date: 


Designation: 
(Name of QP’s authorised representative) 

Certified by:  Signature:    Date: 

(Name of QP and QP’s stamp) 

 
Result of Air Tests on Sanitary Plumbing System 

Project Reference: 
Project Title: 
Test Method: Air test method as specified in Clause NG 3.1 of BS EN 12056‐2‐2000 
Test Results: as tabulated below. 
Block  Storey Level:  Unit No:  Date of 1st test of  1st test Result  (if found leak at 1st test) 
st
No:  (eg. 1  Floor,    sanitary  (Leak / No  Date of final retest which shows no 
2nd Floor)  (eg. #02‐01,  discharge pipes/  Leak)  Leak in the sanitary discharge 
03‐01, etc)  stacks,ventilating  (To specify  pipes/stacks, ventilating 
pipes/stacks,  the points of  pipes/stacks, WCs, Floor traps , etc 
WCs, Floor traps,  leak  at the unit  
etc at the unit  detected) 

  Example 1:          

102  1st floor   Common       


area 

  2nd floor  #02‐01       

    #02‐02       

    #02‐03       

  3rd floor  #03‐01       

  Example 2:          
(for typical 
unit layout, 
eg HDB flat) 

103  2nd to 15th  #02‐01 to       


floor   #15‐01 

    #02‐02 to       
#15‐02 

    #02‐03 to       
#15‐03 

    ‐‐ditto‐‐       

Tested/Checked by:   Signature: Company & Designation:  Date: 


 
(Name of plumbing contractor in charge of test) 
Witnessed by:  Signature: Company & Designation:  Date: 
 
(Name of QP’s authorised representative) 
Certified by:  Signature: Date:
 
(Name of QP and QP’s stamp) 
 
 