This document provides specifications for the Stack Parker G61 EV vehicle lifting system. It includes: 1) Dimensions of 80cm width, 50cm free space, and height of 320-370cm depending on the model. 2) Electrical installation requirements and notes for dividing walls, door dimensions, and vehicle clearances. 3) Technical data including weight capacity of 2000kg and wheel load of 500kg, and installation instructions to be performed by the customer.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
505 views4 pages

KLAUS G61 EV - 2 Level Dependent Stack

This document provides specifications for the Stack Parker G61 EV vehicle lifting system. It includes: 1) Dimensions of 80cm width, 50cm free space, and height of 320-370cm depending on the model. 2) Electrical installation requirements and notes for dividing walls, door dimensions, and vehicle clearances. 3) Technical data including weight capacity of 2000kg and wheel load of 500kg, and installation instructions to be performed by the customer.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Page 1 Stack Parker G61 EV

- Section
- Dimensions
80 50 45
Product Data
- Car data Free space
Stack Parker
Page 2
- Width Free space
G61 EV
50

dimensions

80
Page 3
- Approach
- Load plan
- Installation

Height (H) 3
- Electrical Dimensions:
installation Cutting through 1 All space requirements are minimum

5
finished dimensions. Tolerances for

Clear height
Page 4
space requirements +30 Dimensions in cm.

210
(DH)
- Technical
data EB (single platform) =2 vehicles
150

- To be
performed
Type H DH**
by the
customer G61EV-160 320 160
- Description
G61EV-170 330 170
Grounding 4 500 (for vehicle up to 4.80 m = 16'4" long)
G61EV-180* 340 180
»520 (for vehicle up to 5.00 m 17' long)«
G61EV-190 350 190
Before lowering the platform, the vehicle parked in the lower parking space
must be driven off. G61EV-200 360 200
G61EV-210* 370 210
80 50 45 Free space *=standard type **=without car

Free space
Suitable for:
50

Standard passenger
80 car and station wagon.
Height and length
according to contour Car height
Type H Upper Lower
Height (H) 3

Cutting through 1 G61EV-160 320 150 150


5

G61EV-170 330 150 160


210

G61EV-180* 340 150 170


150

G61EV-190 350 150 180


G61EV-200 360 150 190
G61EV-210* 370 150 200
Grounding 4 500 (for vehicle up to 4.80 m = 16'4" long) *= standard type
»520 (for vehicle up to 5.00 m 17' long)«
Width 1.80 m (PW 2.2 m)
Weight max. 2000 kg
Garage with door in front of the Notes Wheel load max. 500 kg
car parking system
1 For dividing walls: cutting through 10 x 10
cm (for pipes).
A1 2 Clearance profile
Free space 2 Dimensions A1, A2 and A3 must be
for door 160 30
coordinated with the door supplier.
45

55
see table

3 If the total height is greater, the max.


vehicle height for the upper parking
80

space increases accordingly.


0 0
15 13
60
4 Potential equalization from foundation 100 125
grounding connection to system. 500 (520)
Height (H) 3

5 10 cm wide yellow-black marking must


be applied by the customer to the edge of
the platform in the access area to mark
the danger zone in front of the supporting
A2 2 surface of the upper platform edge (see
5
212

»Load Plan«, Page 3).


Stack Parker G61 EV | Indian Version 01.2014

KLAUS Multiparking Systems Pvt. Ltd.


5/3, Prashant Apartments, Erandwane,
Pune 411 004 INDIA
Phone +91-20-2545 0378 / 8662
Fax +91-20-2544 6360
E-mail [email protected]
Website www.klausindia.com
Stack Parker G61 EV | Indian Version 01.2014 Page 2 of 4

Page 1
Width for basement garage
- Section
- Dimensions Dividing walls
- Car data Single platform (EB) Double arrangement (2 x EB) Triple arrangement (3 x EB)
Page 2
- Width
dimensions
EB EB EB EB EB EB
Page 3
- Approach
- Load plan
- Installation B1 B1 B1 Driveway in
accordance with
- Electrical Usable platform width B1 Usable platform width B1 B1 local regulations
installation
Usable platform width
200 230 200 460 200 690
Page 4 210 240 210 480 210 720
220* 250 220* 500 220* 750
- Technical
data 230 260 230 520 230 780
240 270 240 540 240 810
- To be
performed 250 280 250 560 250 840
by the
customer Columns in system zone
- Description Single platform (EB) Double arrangement (2 x EB) Triple arrangement (3 x EB)
max.

max.

max.
140

140

140
EB EB EB EB EB EB EB EB EB EB EB EB
max.

max.
max.
140

140
140
B2 B3 min 20 B2 B3 min 20 B2 B3 min 20

Driveway in
accordance with
Usable platform width B2 B3 Usable platform width B2 B3 Usable platform width B2 B3
local regulations
200 225 220 200 455 450 200 685 680
210 235 230 210 475 470 210 715 710
220* 245 240 220* 495 490 220* 745 740
230 255 250 230 515 510 230 775 770
240 265 260 240 535 530 240 805 800
250 275 270 250 555 550 250 835 830
Columns outside system zone
Single platform (EB) Double arrangement (2 x EB) Triple arrangement (3 x EB)

EB EB EB EB EB EB EB EB EB EB EB EB

B4 B5 min 20 B4 B5 min 20 B4 B5 min 20


Driveway in
accordance with
Usable platform width B4 B5 Usable platform width B4 B5 Usable platform width B4 B5
local regulations
200 220 210 200 450 440 200 680 670
210 230 220 210 470 460 210 710 700
220* 240 230 220* 490 480 220* 740 730
230 250 240 230 510 500 230 770 760
240 260 250 240 530 520 240 800 790
250 270 260 250 550 540 250 830 820

Widths for garage with door in front of car parking system


Single platform (EB) Double arrangement (DB)
A3= Door width
space required
EB EB EB EB EB EB EB EB EB
All round door
dimensions require
A3

coordination between
door supplier and
L L L S S L L L S S
DF DF DF local agency of DF DF DF
KLAUS Multiparking
Driveway in
accordance
with local
Usable platform width Door entrance width DF L S Usable platform width Door entrance width DF L S regulations
200 2075 112 225 200 415 225 45
210 2175 112 225 210 435 225 45
220* 2275 112 225 220* 4835 225 45
230 2375 112 225 230 475 225 45
240 250 112 225 240 500 20 40
250 250 15 30 250 520 20 40

*= standard width (parking space width 2.30 m)

Please note:
End parking spaces are generally more difficult to drive into. Therefore, we recommend our wider platforms for end parking spaces. Parking larger
! vehicles on standard width platforms may make getting into and out of the vehicle difficult. This depends on the type of the vehicle, approach and
above all, on the driver’s skill.
Stack Parker G61 EV | Indian Version 01.2014 Page 3 of 4

Page 1 Approach
- Section
- Dimensions
- Car data
! The illustrated maximum approach angles
must not be exceeded. Incorrect approach
Page 2
angles will cause serious maneuvering
- Width and positioning problems on the parking
dimensions system for which the local agency of KLAUS
Page 3 4% Multiparking accepts no responsibility.
- Approach
- Load plan 14 %
- Installation
- Electrical Load plan
installation
Forces in kN (static loads)
Page 4
- Technical
! Units are doweled to the floor.
Drilling depth: approx. 9 cm to 15 cm. Floor
data 300
and walls are to be made of concrete (quality

see page 1
- To be

Height
performed
12±1.4 12±1.4
minimum C20/25).
by the
190 - 360

customer * = Colors used in this illustration are


- Description ±1 ±1 representative
6,6±1.4 6,6±1.4 Special foundations are required with
110 195
asphalt floor or paving blocks.
500 >> 520<< EB
5
Markings*
10

7 7
B1

Installation data Electrical installation


Free space for longitudinal and vertical ducts (e.g. ventilation) Installation diagram
B1 +50 B1 +2.5
0 B1 +2.5
0 1
(255) (252.5) (252.5) 2
10 35 10 35 10 35 3
4

13 5 Conduit (M25)
15

height: +1.70 m
12 10 11

180
Conduit (M25)

120
Approach level
8 9 height: +1.10 m
14 0.00

20 6 7
to the next
B1, B2 = (See table on page 2) system
Free space for vertical pipelines, Electrical data (to be performed by the customer)
ventilation branch canals
No. Qunatity Description Position Frequency
Free space for horizontal 1 1 Electrical meter in the
ducting supply line
2 1 N.A.
3 1 Power supply line (5 x 2.5 mm2, from 1 per unit
copper 3 PH + N + PE) with marked electrical
max. 140

wire and protective conductor. meter to


main power
point
4 1 Main power point: 4 pole RCBO defined at 1 per unit
(or MCB + ELCB), 16 Amp IDN plan
EB EB EB (sensitivity/leakage current) 100 mA evalation
near to
hydraulic
max. 140

unit
5 1 Power supply line (5 x 2.5 mm2, from main 1 per unit
copper 3 PH + N + PE) with marked power point
wire and protective conductor. to hydraulic
B2 B2 unit
(245) >20 (495) 6 every Foundation earth connector corner pit
10 m floor
7 1 Equipotential bonding from 1 per
Example for ventilation branch canal and/or
foundation earth connector to system
vertical pipelines. the system
Free space only applicable if vehicle is
parked forwards = FRONT FIRST and Electrical data (included in delivery of KLAUS Multiparking)
driver’s door on the right side No. Description
( ) = Dimensions in brackets illustrate an 8 Terminal box
2
example for usable platform width 220 cm. 9 Control line 3 x 0.75 mm (PH + N + PE)
2
10 Control line 5 x 0.75 mm with marked wire and protective conductor
11 Operating device
2
12 Control line 5 x 0.75 mm with marked wire and protective conductor
13 Hydraulic unit 1.5 kW, three-phase current, 415 V / 50 Hz
2
14 Control line 5 x 0.75 mm with marked wire and protective conductor
Stack Parker G61 EV | Indian Version 01.2014 Page 4 of 4

Page 1
Technical data
- Section
- Dimensions Range of application Environmental conditions
- Car data
Generally parking system is suitable for small/big length car for which Environmental conditions for the area of multiparking systems:
Page 2 the system is adjusted at the time of installation. In case of different Temperature range 50 C to +400 C. Maximum outside temperature of
- Width car is to be parked, system adjustment/confirmation from KLAUS +450 C.
dimensions Multiparking shall be required.
If the local circumstances differ from the above, please contact
Page 3 KLAUS Multiparking.
- Approach
- Load plan
- Installation To be performed by the customer
- Electrical
installation Safety fences Wall cutting
Page 4 Any constraints that may be necessary in order to provide protection, Any necessary wall cutting according to page 1.
- Technical for pathways directly in front, next to or behind the unit. This is also,
data valid during construction. Electrical supply to the main power point
- To be
performed Numbering of parking spaces 3 phase, 415 V (±10%) 50 Hz (±2%) 4 wire (3 PH + N + PE) electrical
by the supply to the main power point and the control wire line (5 x 2.5 mm2,
customer Consecutive numbering of parking spaces. copper 3 PH + N + PE) with marked wire and protective conductor
- Description must be provided by customer during installation.
Building services
Railings
- Lighting, ventilation, fire extinguishing and fire alarm systems.
- Signages for parking guidance, flooring, pedestals, site painting. If there are traffic routes next to or behind the installations, railings
must be installed by the customer. Railings must also be in place
Marking during construction.
The marking that identifies the danger area at entrance of parking
platform should be made on the floor, with yellow and black stripes.

Description
General description Platforms consist of
This system provides dependent parking spaces for 2 cars one on top - Platform base sections
of the other. The lower vehicle is parked directly on the floor. The - Wheel-stop cross member
vehicle parked on the bottom must be driven out before lowering the
platform. - Access strip
The upper vehicle is parked on the platform when it is resting on the - Side members
floor with the wheels touching the wheel-stopper-cross member. - Cross members
The user is responsible for proper positioning of the vehicle on - Bolts, nuts, washers, distance tubes, etc.
platform /floor.
Hydraulic system consists of
Operation via operating device with hold-to-run-device using master
keys. - Hydraulic cylinders
The operating elements are usually mounted either in front of the - Solenoid valves
column or on the outside of the door frame.
- Hydraulic pipes
Operating instructions are attached to each operator’s box stand.
- Hydraulic pipe fittings
For garages with doors at the front of the parking system, the special
- High-pressure hoses
dimensional requirements have to be taken into account.
Multiparking systems consist of Electric system consists of

- 2 steel pillars with base plates (mounted on the floor) - Operating device (Emergency Stop, lock, 1 master key per
parking space)
- 2 sliding platforms (mounted on to the steel pillars with sliding
bearings) - Terminal box at wall valve

- 1 platform - Electromagnetic locking device

- 1 mechanical synchronization control system (to ensure Hydraulic unit consists of


synchronous operation of the hydraulic cylinders while lowering
- Hydraulic power unit (low-noise, installed onto a console with a
and lifting the platform)
metal mounting)
- 1 hydraulic cylinder
- Hydraulic oil reservoir
- 1 automatic hydraulic safety valve (prevents accidental lowering
- Oil filling
of the platform)
- Internal geared wheel pump
- Connecting elements, bolts, nuts, etc.
- 3-phase-AC-motor (1.5 kW / 415 V, 50 Hz)
- Contactor (with thermal over current relay and control fuse)
- Pressure gauge
- Pressure relief valve
- Hydraulic hoses

We reserve the right to change these specifications without prior notice.


KLAUS Multiparking reserves the right in the course of the technical progress to use newer or other technologies, system, processes, procedures
or standards in the fulfillment of their obligations other than those originally offered.

You might also like