0% found this document useful (0 votes)
60 views

Request For Inspection: For The Following Location/equipment

A request was submitted for inspection of cable pulling and dressing of various cables at the Sulfur Stacker VP2A Reclaimer location for the EPC 14 Jizan Refinery & Marine Terminal Facilities project. The inspection was required on July 22, 2019 prior to cable pulling. The contractor verified the work was ready and in compliance with specifications for the inspection.

Uploaded by

sadik coolsady
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views

Request For Inspection: For The Following Location/equipment

A request was submitted for inspection of cable pulling and dressing of various cables at the Sulfur Stacker VP2A Reclaimer location for the EPC 14 Jizan Refinery & Marine Terminal Facilities project. The inspection was required on July 22, 2019 prior to cable pulling. The contractor verified the work was ready and in compliance with specifications for the inspection.

Uploaded by

sadik coolsady
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

REQUEST FOR INSPECTION

Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department) Ref:SAEP 1150&1023 RFI No: HENC-INST-7066 / 128

BI: 250002400 JO: 250002400 Phase: Conduit Installation Title : EPC 14 Jizan Refinery & Marine Terminal Fac
To: Projects Inspection Unit/ Mr. Santi Civil Mech. Plumb. Comms. Elect. Inst.

Inspection/monitoring is required on (date): 22-Jul-19 at (time): prior to


Cable pullin

VISUAL INSPECTION OF CABLE PULLING and Dressing T36-IC-4053,T36-IC-40


4061,T36-IC-4061,T36-IC-4062,T36-IC-4070,T36-IC-4102,T36-IC-4072,T36-IC-4
for the following location/equipment : IC-4080,T36-IC-4081,T36-IC-4101,T36-IC-4100, at Sulfur Stacker VP2A Reclai
per attached Checklist and Drawings.

Location: VP2A
Work Permit required: Yes Project Quality Plan: Hold Point Witness Poi

SAPMT representative has verified that the work is ready for inspection and CONTRACTOR has verified that the work to be inspecte
conforms to the project requirements. complete and in compliance with the following specific

SAPMT Name Mr.Jabbar SAES/SAMS/Other # SATIP-J-902-01 (3.05)/SAIC-J-6606

Signature Date 21-Jul-19 Contractor/Company Hanwha E&C


Telephone
Name:
Fax QA/QC Name SHADHIK
QA/QC Signature Date 22-Jul-

This form received by the undersigned Inspection Department employee:

Mr. Santi Signature: __________________ Date: 7/22/2019 Time: ________

NOTE: Inspector's signature is for receiving this request only and not for approval or disapproval of the work or facility inspected.
Distribution: A. Original - Project Management B. 1st Copy - Inspection C. 2nd Copy - Contractor
HENC-INST-7066 / 128910

EPC 14 Jizan Refinery & Marine Terminal Facilities


Other
Cable pulling

ON OF CABLE PULLING and Dressing T36-IC-4053,T36-IC-4060,T36-IC-


T36-IC-4062,T36-IC-4070,T36-IC-4102,T36-IC-4072,T36-IC-4074,T36-
81,T36-IC-4101,T36-IC-4100, at Sulfur Stacker VP2A Reclaimer as
klist and Drawings.

Witness Point

CONTRACTOR has verified that the work to be inspected is


complete and in compliance with the following specifications:

SATIP-J-902-01 (3.05)/SAIC-J-6606

Hanwha E&C
SHADHIK
22-Jul-19

Time: _________________

or approval or disapproval of the work or facility inspected.


C. 2nd Copy - Contractor

You might also like