PERI Book
PERI Book
english
This new edition of the PERI Handbook is being published in the year in which PERI
celebrates its 50th birthday. PERI was founded by Artur Schwörer and his wife Christl
in 1969. From the company´s small beginning, it has grown to be one of the largest
companies in the formwork and scaffolding sector.
The engine and basis of this extraordinary success story was and remains the clear
focus that we at PERI have always identified with since the very start and have never
lost sight of in all our activities: we want to contribute significantly to the success of
our customers with our products and systems. This is our mission and our driving
force. Enhanced customer service in all respects. Every day.
On the following pages, we have provided you with detailed information on our
products, systems and services with which we can deliver on this promise. And, of
course, we showcase a rich selection of projects that we have successfully complet-
ed together with our clients around the world. With us, you receive everything from
one source: formwork, scaffolding and a comprehensive range of services.
Everything at PERI goes hand in hand and is precisely tailored to match the individual
requirements you place on us.
Our industry is changing extremely quickly. We want to make the path into the future
as successful as possible with you. Reliable, long-term partnerships are very impor-
tant to us. On the following pages of this handbook, we would like to introduce you to
the solutions we can offer you today to ensure the success of your projects.
With this in mind, we wish you an interesting and inspiring read, and we are looking
forward to a successful cooperation in the future.
152 Services
154 Engineering Services
156 Building Information Modelling
158 Project Management
160 Training Programme, Logistics
Services
162 Equipment Services
164 Software and Apps
4
For over 50 years now, the PERI brand has stood for cutting-edge technology,
innovative strength and close customer proximity. With entrepreneurial think-
ing, reliability and our passion for our customers, we have become one of the
leading manufacturers and suppliers of formwork and scaffolding systems.
Naturally, this makes us extremely proud. Our unique company culture is the
fertile basis for our economic success. This success was made possible
because many people have done an outstanding job. The basis for this was
mutual trust and the appreciation of each individual person.
Success is something that cannot be taken for granted but has to be worked
for every day anew. Our values and success factors, together with our clear
strategy, form the basis and guidelines for us to continue writing further
chapters of PERI’s success story.
Our vision
We want to be the leading partner for all formwork and
scaffolding applications – worldwide.
Our mission
We make construction work more cost-effective, faster
and safer. Providing the best service for our customers is
the aspiration that drives us every working day.
10
Africa
2011 South Africa
2012 Algeria
2014 Nigeria
For us at PERI, being international means that we want to be at 2015 Namibia, Mozambique
home in our markets. Firmly rooted and with a strong local 2016 Morocco
presence. We are convinced that this is the only way we can get
to know and understand our customers and their exact needs. Asia
1990 Turkey
This is why we are now represented in more than 70 countries. 1991 Singapore, Malaysia
Often through several branches and additional sales offices. 1994 Korea
And we still continue to expand. 1997 United Arab Emirates
1999 Israel
In more than 145 PERI rental parks, we store the required form- 2006 Japan
work and scaffolding materials and ensure that we deliver these 2007 Kazakhstan, Qatar, India
in the way our customers expect from PERI: reliably, efficiently 2013 Saudi Arabia, Kuwait
and just in time. 2014 Philippines, Lebanon
2015 Thailand, Hong Kong
2017 Vietnam, China
2018 Indonesia
Oceania
1997 Australia
11
13
Efficient plant technology, state-of-the-art welding processes and fully automatic weld-
ing robots, as well as the alignment of the entire production process according to value
streams, ensure PERI’s premium quality, material availability and delivery reliability around
the world. And create competitive and secure jobs for many people.
15
For us, ingenuity and creativity are never ends in themselves but always a means to an end in
order to make our customers more successful.
Our industry is changing faster than ever. Our aspiration, working with all our customers, is to
pave the way into the future of the construction business and make this journey a successful one.
16
αQ
N
αQ
18
19
20
Hand-in-hand with the customer, PERI develops technical solutions that optimise both
material utilisation and the construction progress. Pre-assembled products increase
productivity and profitability, as well as enhancing cost certainty. To ensure compliance
with budget constraints and scheduling, PERI offers professional support and advice
throughout the course of the entire project.
21
We can keep delivering on this commitment. For us, formwork, scaffolding and services go hand-
in-hand. And our business model is as flexible as those of our customers: Rental? Buy? Or both?
You decide. Depending on the project and your individual requirements. We fit in entirely accord-
ing to your needs. Take us at our word.
22
23
At PERI, we have the best prerequisites: more than 2,000 engineers and sales engineers have a
comprehensive range of expertise and wealth of knowledge in order to develop targeted digital
solutions that help our customers improve their value-adding capacities.
We are convinced that digitisation will open up tremendous opportunities for our industry. This is
something we are prepared for. Our customers can rest assured that they have chosen a strong
partner in PERI.
25
Because one thing is certain: people will always carry on building and shaping their
environment. And PERI will be there, supporting you as a reliable partner.
26
27
PERI national company. The country-specific PERI websites feature the range
complex forms and high loads and is, therefore, ideal for
The MAXIMO MX Tie Technology facilitates tie operations to Faster tie installation
be carried out by one man only from one side. This ensures low thanks to the one-sided tie technology
site personnel requirements. The system is fully designed for without spacer tubes and cones
effective and one-sided operations including, among other
things, the Brace Connector on the formlining side and the Wall Fewer ties
Formwork Bracket. In addition, the optimised number of tie thanks to the optimised tie point
points reduces the working time for formworking operations. arrangement
Furthermore, MAXIMO fulfills high demands placed on the
achievable quality of execution. MAXIMO’s centrally arranged Improved concrete finish
tie points and neat joint and tie arrangement allow users to thanks to the centrally arranged tie
create visually appealing concrete surface designs. points and the neat joint and tie
arrangement
34
Use with MX Tie Technology for wall thicknesses from 15 cm to 60 cm, use with DW ties for
thicker walls
Closing of unused anchor positions is not required as each tie point is normally used.
Flush, aligned and tight connections with the BFD Alignment Coupler
Improved corrosion protection thanks to cavity protection on the profile inner surfaces
Closure technology also for increased requirements such as waterproof concrete, architectural
concrete, F 90, etc. with corresponding test certificates
MAXIMO is mainly used in high-rise and indus- The modular MXK Bracket System consists of In addition to the time savings, MAXIMO stands
trial construction projects. The system follows lightweight, pre-assembled system components. out due to its excellent concrete results thanks
clearly structured panel increments of 30 cm. Assembly can take place manually on the ground. to the clearly arranged joint and tie pattern.
Extended programme
MXP Platform
The platform system with maximum safety for MAXIMO and TRIO panel formwork
35
TRIO is the universal formwork system for all applications where the
main focus is on reducing the shuttering times with conventional DW
tie technology. With the BFD Coupler for all connections and numerous
practice-oriented system solutions, TRIO has proven itself on count-
less construction sites both in single-family house construction and
in large-scale projects worldwide. TRIO can be used together with
the more advanced MAXIMO panel formwork. A large range of
accessories, such as the BFD Coupler or MXK Bracket System,
can be used in both systems.
36
Flush, aligned and tight connections with the BFD Alignment Coupler
Extended programme
TRIO Aluminium
Lightweight formwork for crane-independent working; easily distinguishable by its
yellow powder coating
TRIO Structure
TRIO panels with a free choice of formlining for special concrete surface require-
ments – supplied already pre-assembled
The BFD Alignment Coupler can be operated The aluminium TRIO panel elements are yellow With the TRIO shaft element, complete shaft
using one hand only. powder-coated; they can easily be moved by internal formwork can be moved quickly;
hand. the a ll-round striking clearance is 30 mm.
37
DOMINO is a lightweight, craneable panel formwork with Easy and simple handling
compact dimensions. The system is particularly suitable for thanks to small panels and low weights – especially when
residential and civil engineering projects, as well as construc- using the aluminium panels
tion in existing buildings. Thanks to the inset tie points,
sleeve foundations, parapets, retaining walls and beams can Ideal for foundations
be quickly and easily formed. Strip foundations can be real- due to inset tie points and matching accessories
ised without any tie points in the concrete by using the
Foundation Strap and Top Tie Bracket or Tension and Fast panel connections
Compression Brace. with the DRS Alignment Coupler for all panel connections
38
All connections are guaranteed to be flush, aligned and tight with the DRS Alignment Coupler
DKS Wedge Connector for ensuring easy connections in foundations with lower load-bearing
requirements
The DRS Alignment Coupler ensures flush, The robust DOMINO wall formwork is particularly If no crane is available, the DOMINO Alu version
aligned and tight panel connections. suitable for the construction of foundations. can be used.
Extended programme
DOMINO Alu
Lightweight aluminium elements, clearly distinguishable due to the yellow powder
coating
DOMINO Columns
Square or rectangular cross-sections from 20 x 20 cm to 40 x 40 cm in 5 cm
increments.
39
LIWA is the lightest PERI steel panel formwork and deliberately dispenses with more
elaborate equipment features in favour of lower investment costs. The system has
very few different frame elements as every standard panel is also a multi-purpose
panel with a perforated strip. This means that corners and columns can also be formed
without requiring any special panels. LIWA is a market-oriented solution if, for example,
users are working with system formwork for the first time.
40
Flush and aligned panel connections – also for With the multi-purpose panels, columns up to With scaffold brackets and guardrail posts, 80 cm
compensations up to 5 cm with the LIWA 55 cm x 55 cm can also be formed in 5 cm wide working and concreting scaffolds can be
A lignment Coupler LRS. increments. mounted on the LIWA panels.
Simple design
with powder-coated steel frames, a minimum of formwork guidelines
and simple connectors
41
42
Flexible panel heights, determined by the length of the GT 24 girder (standard lengths 0.90 m to
6.00 m in 30 cm increments; special lengths up to 17.80 m)
Flexible panel widths, determined by the length of the SRZ / SRU Steel Walers
Minimisation of the number of GT 24 formwork girders due to their high bending rigidity and
load-bearing capacity
Large FinPly Maxi formlining sheets are ideal for Combined, for example, with the RCS Rail Climb- When forming bridge piers, the VARIO GT 24 wall
realising high quality architectural concrete sur- ing System, the system can also be used for the formwork is frequently used on climbing brackets.
faces. construction of elevator and stairwell shafts in
high-rise buildings.
Continuous adjustment
thanks to the elongated holes in the walers and couplings with flush,
aligned and tight panel connections
43
RUNDFLEX provides pre-assembled standard panels for circular walls which can be
quickly adjusted without any complicated panel modifications to achieve the required
radius. The circular formwork is, therefore, particularly effective for realising structures
such as wastewater treatment plants, spiral ramps for multi-storey parking facilities,
silos or oriels where radii are constantly changing.
44
Flush, aligned and tight connections with the BFD Alignment Coupler
Easy installation
thanks to pre-assembled units and the proven BFD Alignment
Coupler
Extremely variable
thanks to the flexible adjustment of wall internal radii of 1.00 m
and larger – also for complicated geometries
The self-cleaning adjusting spindles are adjusted The radii of the RUNDFLEX panels are adjusted RUNDFLEX can also be used on climbing
to fit the required curvature by means of a with spindles. They can be adjusted to changing brackets; for example, when constructing silos.
ratchet spanner. radii extremely quickly as a result.
45
The GRV Articulated Waler Circular Formwork can be used to Forming without ties
realise circular structures with no tie points. With this system, due to the closed ring of walers
the external ring tension force and the internal compression
force are transferred by the closed ring of walers. This results Continuously adjustable
in substantial savings, for example, with the construction of for all internal radii greater than 0.90 m
containers whereby the alternative would be to use water-
tight anchor points. Versatile in use
for containers or a wide range of arched bridges
Tie-less formwork for circular structures with concrete radii from 0.90 m, also
for arched bridges
46
RS Push-Pull Props are used for the vertical alignment and transfer of wind loads
from wall and column formwork as well as prefabricated concrete e
lements.
This means that additional kickers are not required.
Durable
due to the galvanised tubes and threads which ensure permanent protection
against corrosion and a long service life
With the DK and SK Tie Systems, tie points can also be reliably sealed later
on. The tie points are sealed with concrete cones using a specially-developed
sealing compound.
Guaranteed leak-proof
Waterproof and gas impermeable, fire-resistant, soundproof and diffusion-
proof, as well as approved for drinking water containers
47
The SB Brace Frame transfers the fresh concrete pressure into the sub-structure
and foundations during single-sided concreting of components. The brace frame
system consists of several frames which can be used individually or in various
combinations for different heights. In addition, the SB Brace Frame can be used
as a horizontal heavy-duty bracket.
48
Different anchor systems can be used in accordance with the permissible tensile force
SB-C
SB-B
SB-C
SB-A
SB-B
SB-C
SB-C
SB-A0
SB-A
SB-A
SB-B
49
52
Extended programme
TRS 90-120
For larger column cross-sections with variable
ladder connections (panel heights 3.30 m / 2.70 m / 0.60 m)
53
54
Continuously adaptable
to match rectangular and square column
cross-sections with individual dimensions
55
56
Fast assembly
with two column halves and integrated tie yoke
with self-cleaning hexagonal thread
57
60
One head for all positions Minimised effort for closing infill areas
as the prop head or lowering head can also be used in due to system components such as column frames
edge areas as well as when changing direction and adjustment beams
Efficient use requiring only few accessories, also for large slab tables
Guaranteed good handling due to the special shape and specific quality of
the system components
61
62
With lightweight individual components (panels and main beams weigh only 15 kg respectively)
One blow of the hammer releases the drophead; The SKYDECK platform facilitates safe working During shuttering, the SKY anchor serves as an
in the process, the formwork is lowered by 6 cm. conditions at the slab edge. attachment point above for personal protective
Main beams and panels can then be struck. equipment to prevent falling from a height (PPE).
63
64
Only 2 system components required for each standard field (Prop Head and GRIDFLEX Standard
Element)
Simple, swivelled upwards from below guardrail solution for the slab edges
65
Optimised use of materials For a wide range of ground For practically all surface
through any combination of GT 24 and plans requirements
VT 20 formwork girders, as well as a through the variable positioning of the easily adaptable with freely selectable
freely selectable girder arrangement girders – also polygonally, trapezoidal or formlining according to the required
overlapping quality of the slab underside
Tilt-resistant support of the cross beams on the main beams through the use of Flexclips
66
SKYTABLE is the ideal solution for forming particularly large slab areas. Areas up Extremely quick
to 150 m² can be formed using this large slab table for buildings with open due to very large forming surfaces as
facades. SKYTABLE operations are always planned on a project-specific basis. well as easy and simple lowering with
The dimensions are in accordance with the building geometry and are only limit- short distances
ed by the maximum dead weight of the table. With the remote-controlled lifting
mechanism, SKYTABLE can be quickly and safely moved by crane to other Extremely safe
storeys. Workers are not required to stand on the table at any time. thanks to a remote-controlled moving
procedure of the tables from a safe
position on the concreted slab
Extremely adaptable
thanks to project-specific, individual
planning
Project-related planned slab table with areas of up to 150 m²; up to 24.40 m long or up to 9 m wide
Load transfer via MULTIPROP Props which are mounted to the truss girders by means of quick
release devices; for greater heights, use with MULTIPROP shoring towers
67
Flexibly adaptable
by continuously moving the Table Swivel
Head ± 15 cm
Can also be used as an edge table with guardrail holders and guardrail posts
without any modification of the prop positions
68
The Table Head TK securely connects the props and slab table to-
gether. It is the cost-effective alternative to the Table Swivel Head.
69
same system while there is less need for storage space and
72
Technopolymer with a high degree of resistance against all environmental influences; 100 % recyclable
Max. permissible fresh concrete pressure: 80 kN/m² (for columns and wall sections)
73
76
High production quality thanks to pre-assembly in the PERI formwork assembly facilities
Designed for a permissible fresh concrete pressure in accordance with project requirements
Taking into consideration the respective site-specific boundary conditions for the final assembly
Better cost-effectiveness thanks to the highest possible share of rentable system components
Custom-manufactured
on the basis of a 3D model, precision-manufactured under optimum conditions
in the PERI formwork assembly facility
Cost-effective realisation
thanks to a high proportion of standard system components taken from the
PERI product portfolio
Quickly assembled
due to easy and simple assembly of prefabricated formwork elements on the
construction site – similar to system formwork
77
With UNO +, walls and columns, slabs and beams, and stairways are shuttered
simultaneously and concreted using the monolithic construction method.
UNO + is, therefore, a cost-effective solution when forming structures featuring
highly repetitive floor plans, as well as social residential buildings. The aluminium
elements are prefabricated on a project-specific basis and can be assembled
without the use of a crane. Tightly closed panel joints along with the high rigidity
ensure excellent concrete surfaces. Optimal application of the system can be
achieved when casting segments for the respective daily cycle have been decided.
78
Fast striking
with an ingenious transition between wall and slab formwork as well as
the drophead which allows early striking
Brackets and guardrail posts provide the neces- PERI manufactures the UNO + elements on a
sary safety for users in UNO + multi-storey project-related basis and in compliance with
construction projects. high quality standards – for virtually all dimen-
sions and structural forms.
Crane-independent working operations using lightweight aluminium elements which are also easy
to clean
Very tight panel connections and a simple striking procedure through the wedge coupler
Conical ties without spacer tubes, installed from one side only
Early striking of the slab with the drophead; as an option, panels can be directly supported
79
PEP Ergo props are mainly used for supporting slab. Maximum prop load: 50 kN
Numerous practical features ensure fast and safe handling – Building authority approved
this includes, for example, the adjusting nut that indicates
Prop lengths: up to 1.50 m / 2.50 m / 3.00 m / 3.50 m / 4.00 m / 5.00 m
the direction or the ergonomic G-Hook which does not jam.
Total length stamped on inner tube in 10 cm increments to the pegging holes
Galvanisation guarantees a long service life. However, if a
prop does get damaged during the tough everyday working Anti-crush device with a hand safety clearance of 10 cm provides protection
against injury
operations on the jobsite, the inner and outer tubes can be
Prop type and length can be read directly from the outside on the end
replaced separately. plate, also on stacks of props
Quickly adjusted
thanks to the 12 cm long adjustment range of the adjusting nut, whereby frequent
re-positioning is eliminated whilst the measuring scale on the inner tube accelerates
length pre-adjustments
Simple connections
prop heads can be attached to both the inner and outer tubes
82
The galvanised PEP Alpha 2 slab prop fulfils Load Class D and Maximum prop load: 36.1 kN
B according to DIN EN 1065. The prop types cover a wide Building authority approved
range of the usual range of applications for tubular steel props
Prop lengths: up to 3.00 m / 3.50 m
in residential and light commercial construction.
Anti-crush device with a hand safety clearance of 10 cm provides
protection against injury
Durable
due to galvanising of all parts
83
Thanks to its sophisticated frame construction, PD 5 offers continuous height adjustment for slab tables up
to 10 m high. Well-thought-out details, a minimum of individual components and the low weight ensure safe
installation on the jobsite. Beams can also be realised safely and easily with just a few additional components.
The components are adapted to suit the system grid of the PERI UP modular construction kit, allowing com-
ponents such as decking or ledgers from PERI UP Flex to be integrated.
Shoring system made of welded, powder-coated tubular steel elements with spindles at
the head and base
Basic dimensions under the slab tables: 1.25 m x 1.50 m / 1.25 m x 2.00 m / 1.25 m x 2.50 m
Continuous height adjustment from 1.55 m upwards with only 2 frame sizes
Can be assembled vertically or horizontally thanks to the innovative connection of the diagonals
Easy horizontal and vertical moving procedure with the Trolley and Winch as well as the
PERI Transportation Fork or crane
84
PD 8 shoring is predestined for use under slab tables. In particular, due to its large spindle
extensions, the system can be quickly adapted to accommodate different heights as well as
being lowered for moving under large beams.
Basic dimensions under the slab tables: 1.50 m x 1.25 m up to 1.50 m x 3.50 m
Continuous height adjustment from 1.55 m with only 2 frame sizes and spindle
extensions up to 88 cm in the head and base areas respectively
85
MULTIPROP slab props are used as individual props and – in combination with
MULTIPROP frames – as shoring towers or load towers under tables. Compared
to tubular steel slab props, the aluminium MULTIPROP weighs 90 kN and carries
significantly higher loads whilst, at the same time, having a very low dead weight.
Well-thought-out details
with self-cleaning thread, trendsetting adjusting nut and continuous
adjustability
Continuous thread for infinite adjustment of the prop height without pegging
Anti-dropout device prevents the inner tube from accidentally slipping out
86
The ST 100 has been designed for fast assembly and dismantling according to the
stacking principle. The individual frames are simply inserted into each other and
offset by 90°; tools are not required. With a single frame type, all required assembly
heights can be realised. Diagonal bracing ensures extremely tight connections for
crane transport and during erection.
Fast assembly
without any tools whatsoever – by simply fitting the components together
with no pins and connectors
Minimal planning
with only one frame size and without combination tables, each application
height can be easily planned.
Shoring tower with 1.00 m x 1.00 m ground plan comprised of 4 stacking frames per m
of tower height respectively
Leg loads up to 53 kN
87
Assembly and dismantling of the MDS K Shoring Tower takes place with protection
always provided by means of end-to-end guardrails. The user is in the interior of
the tower during all assembly situations and, thus, in a safe and secure position
with no additional measures required. The MDS Decking is attached to the ledgers
without tools while any unintentional lifting from below is simply not possible.
Materials are supplied through the inside of the shoring tower.
Effortless handling
through the low weight and ergonomically advantageous working
operations in the centre of the body
Vertically assembled shoring tower comprised of PERI UP Flex system components and
additional decks
Leg loads up to 50 kN
Width: 1.25 m
88
Flexible compatibility
thanks to the optimal coordination to accommodate PERI slab form-
work systems, as well as common steel and timber dimensions
Leg loads up to 46 kN
As shoring tower with additional frames or column framework unit for high vertical and/or
horizontal loads
Project-specific planning as spatial load-bearing structure for virtually all geometries and loads
89
The 4-legged heavy-duty prop consisting of PERI UP Flex standards and ledgers
carries concentrated loads up to 200 kN. The hydraulic cylinder in the base allows
displacement and force-controlled lowering of the prop under load, as well as
planned force control pre-stressing, which is required for shoring in existing buildings.
The hydraulics can be moved from prop to prop, thus reducing cylinder requirements.
Cost-effective
thanks to standard components taken from the PERI UP Flex
modular scaffolding system
Prestressing and release via the Lowering Spindle with the help of the h
ydraulic
Lowering Unit HD
90
HD 200 is the solution for higher loads. The props are very flexible in their application – from
structural renovation through to bridge construction. In particular, the low weight and easy
handling of the HD 200 guarantees fast assembly.
Fast assembly requiring no tools Shoring prop consisting of coupled aluminium sections for
medium-heavy shoring
thanks to integrated chord couplings for connecting the
For loads up to 200 kN per individual prop
individual sections
Assembly in 30 cm increments up to a total height of 12.20 m
Assembly by hand
with lightweight individual components – the largest
aluminium section weighs less than 30 kg
91
The design concept of the facade scaffolding with the Easy Frame combines safety and
cost-effectiveness. The scaffolding is characterised by its very low weight, thus resulting in
significantly reduced assembly and dismantling times. As the guardrail for the next scaffold-
ing level is mounted without any additional components when using the Easy Frame, the
scaffolder is secured against falling on every level without requiring rope protection. The
special feature: the Easy Frame rosette allows for combination with system components of
the PERI UP Flex modular scaffolding. This opens up new application possibilities also for
complex tasks.
94
For use as working scaffold in accordance with DIN EN 12811-1:2004-03 or as roof edge
protection scaffold
Combi Deck made of wood as well as composite and aluminium decks with 67 cm widths;
steel decks with 33 cm widths
Internal bracket decking, removable for use on external walls with a thermal insulation system
Fast opening and closing of scaffold bays for the transport of materials
Low weight
of the individual components facilitates fast working operations
Fast assembly
with a minimum use of tools and virtually no couplers
95
With PERI UP Flex, safe working platforms can be realised at any height. With the continuous metric
system grid and the possibility of changing the direction of the decks, the modular scaffolding can be
optimally adapted to suit virtually any local conditions. With the self-securing ledger connection on
the rosette and the integrated protection against lifting in the decking, PERI UP Flex can be mounted
extremely quickly.
96
Fast assembly Non-lift decking due to the integrated lock against lift off (Locking Deck);
slip-resistant decks
due to the Gravity Lock, Locking Deck and lightweight
components
The ledger with the Gravity Lock and the The wide range of ledgers with lengths starting from 25 cm allows the direction of
self-locking Locking Deck facilitate easy and the decking to be changed during installation. This ensures maximum adaptability
safe assembly. to suit project-specific geometries – virtually no couplings are required.
97
The trolley with connected standards can be suspended on I-shaped steel profiles and carry loads
up to 19.7 kN. This allows entire platforms to be moved, e.g. on the underside of oil platforms or
bridges. For project-specific solutions, rentable steel components from the VARIOKIT Engineering
Construction Kit or other PERI formwork systems for the supporting structure are often used.
98
With the PERI UP Flex Lattice Beam ULS, spans up to 10 m can be bridged
cost-effectively. The beam consists of 5 easy-to-handle individual components with
a maximum length of 1.50 m and maximum weight of 15.4 kg. The beam length
can be adjusted in 25 cm increments. PERI UP decks can be directly m
ounted on
the upper chords of the beam.
99
The PERI UP Flex reinforcement scaffold with a base width of 150 cm or 250 cm
can be assembled up to a length of 3 bays in a longitudinal direction. The self-securing
ledger connection and the integrated protection against lifting in the decks facilitate
fast assembly. The continuous, gap-free uniform deck covering provides users with a
very high level of safety during working operations.
100
Simple to plan
due to fast calculation of material requirements thanks to prefabricated units
Working scaffold up to Load Class 3 according to DIN EN 12811-1 (up to 2.00 kN/m²)
Maximum standing height 6.60 m (with base width 150 cm) or 10.80 m (base width 250 cm)
101
The LGS Lattice Girder System offers safe and efficient solutions for large spans and
high loads. Apart from the use as trusses for temporary (pedestrian) bridges or work-
ing platforms at any height, LGS truss segments also ensure easy and fast assembly
of weather protection roofs. The temporary, protective roofing can be used, for example,
for roof refurbishment, extension work, bridge and motorway construction sites or at
jobsites during the colder winter months.
102
Flexible adaptability
can be realised with different inclinations and geometries
Safe assembly
with walkways along the trusses which provide low-risk working
conditions on the roof segments
103
With a wide range of PERI system components and extensive know-how, PERI engineers provide
cost-effective and project-specific scaffolding constructions. In the process, components from different
PERI systems are frequently combined in order to realise safe solutions with optimised load transfer –
for example, for temporary (pedestrian) bridges or large-sized working platforms at virtually any height.
With the PERI UP Flex Lattice Beam ULS, For work carried out on overhead lines, PERI UP
wide-span working and safety scaffolds can safety scaffold comprised of lightweight system
be realised. Site personnel working below or components secures crossings over public
passing traffic are reliably protected from falling roads.
components or objects.
104
Flexible assembly
thanks to the 25 cm grid dimension, all bays can be
completely closed even in the smallest of spaces
Easily adapted
regardless of the storey height, access to building
openings with brackets and flights of stairs is possible
Fast assembly
with only a minimum number of ledgers and anchors
Can be used for alternating staircase units or staircase units in the same
direction with assembly heights from 2.00 to 66.00 m (project-specific
planning up to approx. 100 m assembly height)
108
With the site and stairwell staircas- At the same time, the stairwell staircas-
es, compact access means can be es serve as working platforms to carry
provided for small staircase wells on out further work on the walls. With
the inside of buildings. For this, standard components, access can be
shorter ledgers are connected at the created to all floors in height increments
same height at 90° angles while of 25 cm. Standard versions are availa-
using flights of stairs with smaller ble for common floor heights.
run lengths and heights.
109
Convenient width
offers sufficient space even for a large number of users,
or when transporting materials and stretchering injured
persons
110
PERI UP Public is the ideal solution for temporary stairs in public areas. Typical
applications are providing access to grandstands or as temporary pedestrian
bridges, or stair replacement during renovation work. These stairs are able to
meet particularly high requirements regarding permissible loads, flight widths, as
well as guardrail and landing arrangements. Thus, the system always focuses on
providing complete safety for all users.
111
they can be lifted as one single unit into the following concreting
hydraulic climbing device lifts the units to the next storey, then this
have also been developed: climbing systems for facade areas, build-
The FB Folding Platform can be used as working and safety scaffold. In addition,
it serves as a support for wall formwork up to 5.40 m high or as a roof edge pro-
tection scaffold. The folding platform is delivered fully assembled to the jobsite.
The small number of required anchors and low assembly costs make the folding
platform particularly cost-effective.
114
Permissible load according to DIN EN 12811: Load Class 4 (300 kg/m²) when using main,
intermediate and corner platforms; Load Class 5 (450 kg/m²) for use only with main platforms
Support extensions with adjustable pressure point for bridging building openings
Less space required during transport and storage with an effective stacking height of only 27 cm
115
116
System variants
CB 240
Bracket width 2.40 m with carriage (75 cm retraction distance), strongback and
adjustable brace
CB 160
Bracket width 1.60 m with adjusting unit, strongback and adjustable brace
BR Platform Beam
For shaft platforms when supporting
shaft internal formwork
Project-specific optimised
thanks to customised adaptation of the beam
117
The SCS Climbing System is predominantly used for sin- Optimised use of crane time
gle-sided applications, i.e. with non-tied wall formwork. The thanks to large, craneable climbing units – also with large
loads resulting from the fresh concrete pressure are thereby formwork heights and circular structures
transferred via the brackets into the previous concreting
section by the climbing anchors. Typical areas of application Material-optimised solution
include dams, locks, bridge piers and other engineering struc- with the same formwork and components for the starter and
tures. SCS is characterised by its high level of cost-effective- subsequent standard cycles
ness; based on a modular concept, the system facilitates
optimised adaptation to suit project-specific requirements Safe, horizontal working areas
and geometries. Thanks to the multi-part bracket, the units whereby the platforms can be aligned horizontally also during
can be delivered already pre-assembled to the construction inclined working operations
site; this accelerates the final on-site assembly.
Cost-effective also for two-sided applications
due to a minimum of additional components for a high level
of material utilisation and reduced logistical requirements
118
Optimised for a concreting height of up to 3.90 m for one-sided applications and up to 6.00 m for
two-sided applications
Concreting, working and finishing platforms can be tilted by up to ± 15° and ± 30°
By using the angle adapter, the brackets can always be arranged in a parallel position also with
circular structures; as a result, the formwork with carriage can be retracted and the climbing unit
moved by means of a single crane lift
System variants
SCS 190
Bracket width approx. 1.90 m with tilting device for striking operations; SCS 190
requires only a minimum of space and is the more cost-effective alternative
SCS 250
Bracket width approx. 2.50 m with carriage for retracting the wall formwork
without requiring a crane
119
The RCS combines the advantages of different climbing systems in a modular system and is used
as climbing formwork as well as a climbing protection panel. Due to the rail-guided climbing, the
climbing unit is securely connected to the building at all times, which makes the climbing proce-
dure fast and safe even in windy conditions. The units are thereby moved by crane or by means
of mobile climbing hydraulics to the next section. For the RCS enclosure, different materials can
be used, e.g. LPS mesh panels, trapezoidal sheeting, multi-layer wooden boards or netting.
RCS is easily adapted to suit jobsite-specific requirements.
120
Building-authority-approved standard anchoring for walls and slabs; if required, also with a
horizontally-arranged climbing rail for larger cantilevers
System variants
The mobile climbing device allows climbing The Climbing Protection Panel can be used RCS CL requires only a minimum of installation
without a crane. The hydraulic cylinders are in a line also with protruding and recessed effort and is therefore the right solution for
mounted on the climbing shoe between the slab edges. medium-high buildings.
wall and climbing rail.
121
The RCS MP Landing Platform serves to move formwork Can be variably positioned at any point on
and materials to high-rise buildings quickly and safely. the building
The platform with steel decking can be optionally anchored the platform is either anchored on the slab or securely
in the slab or clamped between two floors by means of clamped between two slabs
MULTIPROP props. The continuous side protection, along
with the additional scaffold tubes, also ensures safe All-round safety
working conditions when slab tables are attached. with non-slip checker plate flooring and continuous side
protection on the platform provided by LPS Mesh Enclosures
Fast assembly
thanks to pre-assembled deliveries whereby the mesh
enclosures are simply inserted and secured with bolts
Minimum clear width of 2.52 m; with the clamped version, the passage
width can be extended to over 3.00 m through the arrangement of walers
under the props
122
Adjustable slab shoe for mounting on the slab with variable cantilevers
and extendable platforms
Fast assembly by hand due to the low component weight and simple
clamping connection
123
124
Climbing can take place outside of normal working hours thanks to the almost silent climbing
hydraulics
As an adjustable version with platforms always in a horizontal position for inclined structures such
as bridge pylons or piers
Can also be used as shaft formwork for staircases or small elevator shafts with a single climbing
device positioned in the centre
System variants:
125
With the ACS Core 400 for high-rise building cores with large cell dimensions, the PERI
self-climbing technology has taken its next evolutionary step: the optimised climbing pro-
cess ensures simple working operations and short cycle times. Climbing the complete
core formwork minimises leading edges and increases safety levels for the construction
team. In addition, large placing booms can be climbed together with the ACS Core 400,
which also supports them during operations. As a result, storey slabs can be simultane-
ously concreted with the walls. It makes sense to use the system on structures with at
least 30 storeys; up to 2 floors per week can be realised.
126
For use with VARIO GT 2, TRIO, MAXIMO or TRIO wall formwork systems
Climbing the complete core formwork with only one stroke (long-stroke cylinders with 40 t lifting
force respectively)
Climbing of the entire internal and external formwork – also with large load differences.
System variants
127
engineering projects.
85 % core components
10 % system components
5 % special components
85 %
130
131
The VARIOKIT Engineering Construction Kit includes suitable system solutions for bridge
superstructures and cantilevered parapets. The portfolio ranges from lightweight brackets
through to complete formwork carriage and equipment solutions.
VGK Cantilevered Parapet Bracket VGB Parapet Track VGW Parapet Carriage
Lightweight suspended bracket for refurbishment Mobile solution below for the incremental Mobile solution above for the incremental
work as well as new construction of cantilevered construction and refurbishment of cantilevered construction and refurbishment of cantilevered
parapets on shorter bridges parapets on longer bridges parapets on longer bridges
132
Fast availability
due to the modularity of the construction kit system and the well-stocked PERI
rental parks worldwide, ensuring short delivery times
Time-saving handling
due to fast assembly with standardised connections and fitting pins, as well as
easy operation thanks to the intelligent features
Flexibly adaptable for different component dimensions as well as the arched shape of the
superstructure
VCC Composite Formwork Carriage VKL Incremental Launching Facility VBC Balanced Cantilever Equipment
Mobile solution above for constructing the System formwork solution for the construction of For section-by-section, symmetrical construc-
carriageway slab on steel composite bridges bridges using the incremental launching method tion of the superstructure from the pier head
133
Cost-effective
no permanent investment necessary as all system components are
available in the PERI rental parks
For four-legged towers, towers with additional legs, shoring tower frames,
main beam frames and birdcage scaffolding
Continuous realisation of all heights with staggered lengths of the RCS Rails,
two spacers along with the head spindle
134
Infinitely variable height adjustment with different frame types and telescopic function
on the supports
135
ALPHAKIT is the new construction kit for shoring solutions and pedestrian bridges.
The system is an impressive solution due to its fast assembly options with proven
fitting pin connections. Thanks to the innovative, constructive solution, the
2.62-m-long ALPHAKIT steel waler only weighs 44 kg. Complete girder packages and
towers can be pre-assembled on the ground by hand. This considerably reduces
crane requirements and the required crane capacity. ALPHAKIT has been developed
to perfectly suit the requirements of emerging markets.
136
The small number of fitting pins facilitates fast- ALPHAKIT can be pre-assembled on the ground Thanks to the modular system, towers and
er and safer assembly operations compared to by hand without requiring a crane and is, thus, trusses can be realised using minimal compo-
assembly with screw connections. also ideal for use on construction sites where nents. The towers are infinitely adjustable in
space is at a premium. height.
137
With VARIOKIT system components, cost-effective tunnel formwork carriages can be realised
which are precisely adapted to meet the needs of the respective jobsite. Requirements such
as drive-through openings for trucks or folding mechanisms for moving procedures can be
easily fulfilled. Additional components for lifting, lowering and moving are likewise available in
the rentable PERI portfolio, as are safe working platforms and access means. Required technical
accessories, e.g. concrete pump connections, complement the VARIOKIT solutions.
138
Easy and simple modification procedure if changes are made to the tunnel cross-section
Optionally available hydraulic support for shuttering and striking, as well as lifting, lowering and
moving the formwork carriage.
Fields of application
A large drive-through opening in the slab form- The formwork segments can be folded hydrauli- This tunnel formwork carriage on the basis of
work carriage ensures unhindered site traffic. cally to move the formwork carriage through a the VARIOKIT modular system is used to con-
narrower cross-section. struct the accessible cross-passage between
two tunnel tubes.
139
Compliance with high safety standards for the entire work process
140
141
accessories.
PERI offers matching accessories and components for in-situ concreting operations, as well as
for scaffold assembly and dismantling. Whether it is beams, columns, concrete release agent
or spacers and a choice of reinforcement connections – components are important elements
on a construction site. PERI also supplies system solutions with matching accessories from a
single source. With this advantage, the right components are available at the right time for all
phases of construction.
144
The plastic PERI Slab Stopend Angle can be The Stopend Trestle is used to form bottom The Formwork Bracket-2 is used to form cantile-
used to form beams up to 60 cm high and slab slabs up to 60 cm thick. vers of up to 45 cm with slab thicknesses
edge stopends up to 40 cm high. reaching 30 cm.
145
The PERI portfolio offers a wide range of systems and equipment that ensure more
safety on the construction site. In addition to system solutions such as platforms,
brackets, access means and enclosures, the spectrum includes many more devices
and components. The 1.10 m high, quickly assembled PROKIT EP 110, for example,
serves as temporary anti-fall protection for open building edges. With posts and
assembly feet, as well as powder-coated side mesh barriers, flexible usage can be
realised without extensive planning effort, even for complicated building geometries.
Temporary edge protection on open edges for walls and slabs in accordance with DIN EN 13374,
Class A; can also be used on stairs with handrail boards
Temporary side protection for PERI formwork and scaffolding systems in accordance with
DIN EN 12811
The 260 cm long side mesh barrier is ideal for open slab edges
Side mesh barrier with lengths of 240 cm, 120 cm and 90 cm compatible with MAXIMO and TRIO
Panel Formwork
146
147
The wooden formwork girder with a 24 cm overall height provides a high load-bearing
capacity and rigidity. During use in wall, column and slab formwork systems, stopend
formwork on slab edges, as well as with special formwork, material requirements
and workloads are reduced with the use of the GT 24 Formwork Girder.
148
High level of d
imensional Extremely versatile use Low weight
stability thanks to system bores in the web, allows “one-man assembly” up to
due to a chord cross-section of 4 cm x e.g. for mounting guardrails length of 4.50 m
8 cm and a 25 mm thick, highly
compressed web board
149
PERI FinPly / PERI FinPly Maxi / PERI RusPly: coated plywood to fulfil very high requirements and
demanding concrete surfaces; consisting of cross-bonded birch veneers with reinforced phenolic
resin on both sides
PERI Spruce: coated plywood for a smooth concrete finish with a lightly structured appearance;
7-veneer composition comprised of Nordic coniferous wood with phenolic resin on both sides
3-Ply Plywood: large sheets for concrete surfaces with high requirements and a slight timber finish
in the concrete
Individually tailored plywood sheets are accu- For architectural concrete surfaces, the PERI PERI Pave is the production pallet used in the
rately produced using modern CNC equipment. formlining programme offers high-quality, manufacture of concrete paving products.
film-coated plywood sheets. The coated plywood sheeting ensures uniform
concrete compaction of the paving stones.
150
PERI Clean and PERI Plasto Clean are manufactured on a mineral oil basis
PERI Bio Clean is a partially synthetic release agent and biologically degra-
dable in accordance with OECD Guideline 301c (awarded the EU Ecolabel)
151
Around 1,300 PERI engineers worldwide plan and design formwork and scaffolding
solutions for cost-effective executions. All PERI Engineering planning services are
aimed at ensuring that PERI formwork and scaffolding systems in construction oper-
ations are always used in line with time, cost and quality standards. The basis for
this is the execution plan records, which are based either on 2D-views and sections
or realistically visualised 3D building models. As a result, technical solutions are
developed with customers that optimise the use of materials and the construction
process itself.
154
155
With the plug-in Library+ for REVIT, the PERI component catalogues of The components of the most important PERI wall, slab and column form-
the MAXIMO and SKYDECK formwork systems can be integrated into work systems are available in Trimble’s Tekla Warehouse and, equipped
the planning for the Autodesk ® Revit ® software for BIM. with the corresponding metadata, facilitate BIM-related reusage in the
construction process.
156
3
2
4
1
5
Information
10 Cooperation
3D modelling
6 Visualisation
Virtual, augmented and mixed reality
9 Material identification
7
8
1 Building development / spatial planning 5 Plan creation / documentation 9 Operation and Maintenance
Improving the construction processes through 3-dimensional visualisations and animated process
simulations before starting the project
Efficient execution of construction work and cost transparency through optimised work preparation
and the integration of additional process data
Coordinated processes uniformly resolved – from the CAD design and all change processes through
to putting into operation
157
158
No interface-related loss of engineering services due to continuous project support and technical advice from a specialist
Continuous control options using target-actual performance comparisons for constant monitoring of material, time and costs
159
Practical sessions provide the ideal opportunity to become familiar with the
assembly and to put into practice tips from the PERI experts and theoretical
knowledge directly on the products, while also enhancing existing expertise.
160
Reduced capital and financing needs for the customer, as their own
investments for materials and yard are lower or not necessary
161
Together with the PERI experts, individual coordination of the required services in accordance with
the state of the materials
Professional repair service with state-of-the-art plant engineering guarantees the best results
Fast processing and return deliveries of customer’s materials thanks to PERI’s network of service
centres
162
As architecture is also becoming increasingly more demanding in both quality and geometry, formwork
featuring a wide range of designs is often requested. PERI offers complete solutions from a single source –
from simple CNC cut-to-size panels and box boxes through to individual special elements, 3D formwork units
and platforms. All dimensioned elements are customised to match all project requirements in the clearly
defined quality and suitable for the planned number of uses.
Using state-of-the-art CNC machines, panels PERI provides customised 3D boxed elements Pre-assembly of girder wall formwork, 3D form-
are cut ensuring the highest precision and com- for the construction of complex, multi-curved work units, as well as heavy-duty shoring struc-
pletely in accordance with the specifications of reinforced concrete components. tures for the infrastructure sector, can also be
the PERI CAD plan file. carried out at the PERI facility.
2D or 3D additional infill spaces and complex formwork units according to individual requirements
regarding shape, type of formlining and planned number of uses.
High quality of execution and efficiency through prefabrication with PERI’s state-of-the-art
technology and specialist personnel
163
Whether in the office or on the jobsite: digital helpers from PERI are valuable tools
in the planning, work preparation and execution of formwork and scaffolding pro-
jects. The range of digital applications available today extends from product-related
apps for simple calculations for formwork and scaffolding systems through to the
online myPERI customer portal which, as a comprehensive information platform,
supports the complete execution time of a project. Clear and simple operability is
of paramount importance for all PERI software programs and web tools – while
simultaneously ensuring high user benefits.
164
Descriptive presentation with clearly-arranged and detailed plans thanks to the 3D elaborations and visualisations
Reduced costs through the accurate planning of quantities and optimised construction sequences
PERI Apps
Intuitively operated apps save time and money in everyday construction activities and make
a valuable contribution to on-site safety. The web-based configurators can be used to deter-
mine important characteristic values and performance data, as well as the easy planning of
specific structures.
myPERI
With the online myPERI customer portal, PERI customers can access all important project data
of their respective PERI jobsite. In addition, they can quickly and easily access a comprehensive
range of product and component information. Anytime, anywhere.
Project data, materials and costs in view at all times with the help of clearly presented reports
Simplifies work processes through useful work aids and templates in all phases of the construction process
Constantly updated information; versatile, time-saving evaluation options at the click of a mouse
165
from the past few years serve as a source of ideas for project implementation.
Numerous other impressive projects are featured on the PERI websites of the
172
“Thanks to the high level of expertise and tremendous commitment of the PERI
engineers, a technically and cost-effectively atractive solution could be found to
meet all challenges.”
The buildings were realised exclusively as concrete constructions. For the shared
11,500 m² basement area containing the parking spaces along with the Rondo
Towers, a construction period of only 10 months was scheduled. PERI therefore
developed a concept that decoupled the respective work operations on the various
in-situ concrete areas. As a result, the construction team was able to work simulta-
neously on the balconies, walls and slabs thus saving time. The structurally de-
manding balconies were realized using MULTIFLEX girder slab formwork. This was
supported on MULTIPROP aluminum slab props which were connected with MRK
frames to form shoring towers in order to transfer the load across all levels down
to the slab of the underground garage.
Notwithstanding the above, the walls of the living area were constructed using
TRIO 330 panel formwork and climbed in advance with the help of FB 180 folding
platforms. The slab formwork was realised by means of lightweight and quickly
assembled SKYDECK panels whereby striking operations were particularly fast due
Rondo is a building ensemble consisting of 7 resi-
to the drophead system – the cycle times were thus decisively shortened. A high dential towers with a total of 200 apartments in
the Second District in Vienna’s Leopoldstadt –
level of safety was guaranteed through the use of end-to-end PROKIT anti-fall a development project that combines housing,
protection on all storeys. living and working in accordance with new criteria.
Contractor
Heitcamp Construction GmbH, Vienna, Austria
Client/Project Development
IC Development GmbH, Vienna, Austria
Architect
Thomas Pucher, Graz, Austria
Field Service
PERI Austria, Nußdorf
173
“I particularly appreciate the active approach of the PERI team regarding unusual
constructions. An example of this was the realisation of the statically challenging
inclined columns. In the process, PERI engineers supported us with static design
issues as well as the coordination directly on the construction site.”
174
The entrance area of Panorama City III is characterised by The concrete slabs of the building were realised using
widely spaced, mostly inclined, in part vertical circular MULTIFLEX Girder Slab Formwork. PERI planned a shoring
columns with diameters of 1 m. This 15-storey building construction based on PERI UP Flex components for transfer-
complex features approx. 26,000 m² of rentable office space. ring loads from the 10 m high slab in the entrance area.
A total of 2,500 m² of MULTIFLEX was used for the slab
SRS Circular Steel Column Formwork was used for the re- formwork and 600 m² of DOMINO and TRIO wall formwork
quested high-quality architectural concrete surfaces. It can respectively.
not only accommodate high concrete pressures but also has
high-strength panel joints. Integrated ladder access ensured With the full commitment of its engineering team along with
safe access means during the concreting phase. The form- the fast realisation of the design and planning phases and
work with panel heights up to 8.40 m consists of two halves efficient technical solutions, PERI was able to completely
with an integrated clamping device. meet the client’s expectations.
Contractor
STRABAG Pozemné a inžinierske staviteľstvo s.r.o., Bratislava, Slovakia
Building and civil engineering s.r.o., Bratislava, Slovakia
Field Service
PERI Slovakia, Senec
175
176
Kopp, a family-owned and run company based in the Upper Swabian town of
Emerkingen near Ulm, has built up a strong second business division in recent
years with its concrete cosmetic operations. With around 50 employees, the
company has in the meantime made a name for itself as a competent partner
for the protection, preservation and embellishment of architectural concrete
structures. Completed in 2017, the two-storey office building reflects the high
company standards in an accentuated and high-quality execution of an in-situ
concrete construction.
PERI formwork specialists were already involved at the planning stage. The
cube-shaped construction exemplifies in its design an accurately sub-divided
arrangement of the formwork areas based on the 30 cm grid pattern of the
MAXIMO panel formwork. Windows and doors were integrated into the
specified surface-area grid without requiring any obstructive filler elements.
MAXIMO with its one-sided tie technology allows precisely positioned joints
and centrally-arranged anchor holes; facade and interior walls show the creative
possibilities of architectural concrete in its fine, smooth surface and monochro-
matic colour structure. Following customer requests, the MAXIMO elements
were fitted with new formlining – this was the only concession in a project that
was otherwise realized cost-effectively with rental formwork consisting of
MAXIMO standard elements.
Client
Sichtbetonkosmetik Kopp GmbH & Co. KG,
This project was an exemplary demonstration regarding the importance of close Emerkingen, Germany
cooperation of architects, contractors and PERI engineers in the construction of
Architect
architectural concrete structures which covers all planning and execution pro- Architekturbüro Veser, Munderkingen, Germany
cesses. On this basis, the formwork solution can be optimally adapted to match Contractor
the respective construction project requirements – from standard through to Baugeschäft Neubrand, Ehingen-Volkersheim,
Germany
customized formwork.
Field Service
PERI Germany, Weissenhorn
“I am very satisfied, the good quality of the execution and architectural concrete are
the professional result of a very positive cooperation of all concerned. As the end
product – architectural concrete – as such is important for us, it was also very interest-
ing to be able to follow the construction process live under real site conditions.”
177
178
“We worked with a heated formwork system during the winter months and were
able to meet the deadlines. The MXH from PERI worked extremely well.”
The new school and community centre in the district Antinkangas in the histor-
ic town of Raahe on the Finnish Baltic Sea coast is a major project for the small
community. In order to realise the special building geometries, the planners
selected an in-situ concrete construction as the best technical and most
cost-effective solution for the shell construction. Moreover, to ensure that the
project could be completed according to the planned construction schedule,
concreting work had to be carried out in the autumn and winter months. PERI
was able to offer the required formwork solution using the MAXIMO MXH
heated formwork system.
At a very early stage, PERI supported the contractor regarding the use and cycle
planning of the formwork and with the integration of prefabricated concrete
components into the in-situ concrete construction. In particular, calculations for
the required large wall heights of more than 5 m without any horizontal sub-divi-
sion, i.e. in one pour, proved to be a challenging task.
With the MAXIMO MXH, PERI offers a system supplement that allows the
wall formwork to be used equally well in summer and winter. The MXH stand-
ard and extension heating elements can be adjusted to a set point from 20° C
to 80° C and can maintain this even if outside temperatures clearly fall below
freezing point. In spite of the special equipment with the heating elements and
Well thought-out safety features: safe working
the required control devices, the time-saving handling of the formwork does and concreting platforms are part of the
M AXIMO panel formwork system.
not change: MAXIMO MXH can also be pre-assembled on the ground while tie
installation is carried out on one side only. In Antinkangas, the system worked
faultlessly under extreme conditions which reached -15° C.
Main Contractor
Hartela Pohjois-Suomi Oy, Oulu, Finland
Field Service
PERI Finland, Hyvinkää
179
The “Ypsilon” residential and office building, a building com- Especially during assembly operations, the project profited
plex complete with a 35 m high tower with a trapezoidal- from the fact that individual scaffold bays could be opened
shaped floor plan and adjacent 7-storey lateral tract, is the and closed again when the PERI UP Easy had been com-
new striking western gateway to Ulm´s city centre. Behind its pletely installed. The large-sized facade elements that charac-
rounded building corners and a glass and aluminum facade terize the outer appearance of the building could be brought
are retail outlets, offices and apartments. to the front of the building through the scaffolding – a major
reduction in workload, which also saved on crane require-
For the shell construction and finishing work, a working and ments and working hours.
safety scaffold based on PERI UP Easy was created. Due to
the consistent metric grid dimensions of the system, the
demanding building geometry could accurately be followed.
Console bracket extensions and ledgers for pre-assembled
towers were suspended directly in the nodes of the scaffold-
ing assembly.
integrated into the scaffolding system which provided com- Field Service
PERI Germany, Weissenhorn
plete protection for all passers-by.
180
“I´ve been working in the scaffolding sector since 2004 and have already worked with
all systems. After a very short familiarisation period, I enjoy working with PERI UP Easy.
The tool-free assembly is first-class and, thanks to the guardrail in advance integrated
in the system, no PPE is required resulting in less load on the body when working.”
Large construction projects should interrupt traffic flows and business opera-
tions as little as possible. In downtown Ulm, scaffolding work in line with the
construction progress was successfully carried out with PERI UP Easy over
10 floors without any complicated conversion work. The planned time frame
and budget were comfortably complied with.
181
184
“For such a major project, I wanted to work with a market-leading partner. The professional
solutions provided by the PERI engineering team made the construction of both buildings
far more efficient, safer and faster.”
The Young Towers are two elliptical-shaped residential towers in the centre of
Tel Aviv. The construction of the 40- and 46-storey buildings, as well as the
structure connections at the top and bottom, had to meet extremely high quali-
ty requirements. When constructing the shell of the buildings, the amount of
crane time also had to be reduced, and safe work procedures to be guaranteed.
The rapid construction progress was supported by the use of the SKYDECK
Panel Slab Formwork. Its system-specific fast installation sequence could also
be maintained at great heights, as the upper working levels under construction
were always completely closed off by the RCS Climbing Protection Panel. The
enclosure served as protection against falling and reliably shielded the working
areas from the effects of the wind and weather. As a result, the quality of exe-
cution was enhanced and productivity increased due to the increased feeling of
safety.
Contractor
Danya Cebus Ltd, Or Yehuda, Israel
Field Service
PERI Israel, Rosh Ha‘ayin
185
Well-thought-out formwork
concept combines new and old
186
“With this project, construction progress was very quick with the RCS as formwork
scaffolding and protective panel. The mobile hydraulics allowed us to climb in any
weather and at all times – we would often have been unable to use a crane in the
strong winds. For us, PERI is a very reliable and competent partner.”
The biggest challenge for the engineers was to maintain the very tight con-
struction schedule while, at the same time, accommodating the limited crane
and storage capacity in the densely built-up urban area. Here, the RCS Rail
Climbing System combined with MAXIMO Panel Formwork showed its real
strength: the units were raised safely and quickly in increments of 50 cm by
means of mobile climbing hydraulics. Even the strong winds from the Baltic
Sea could not hinder the climbing procedure, because the climbing units were
permanently attached to the building at all times. The variable assembly along
with the 125-mm hole arrangement of the climbing rails also made it possible
to adapt the working platforms perfectly to suit the respective height of the
storey.
The MAXIMO Panel Formwork was used not only on the climbing formwork
but also for various other wall areas. It ensured fast shuttering times, the best
quality concrete surfaces and a regular joint and tie pattern. When forming the
floor slabs, the SKYDECK Panel Slab Formwork made a convincing case due to
its systematic assembly sequence without any time-consuming measuring. Contractor
MERKO Ehitus Eesti AS, Tallinn, Estonia
Field Service
PERI Estonia, Harjumaa
187
188
“Even in the work preparation phase, PERI convinced with its innovative ideas and
clever solution proposals. In the subsequent implementation, the formwork concepts
were updated and optimised further with the site management team. The project
support provided was excellent throughout the entire construction period.”
Graphic: Raumgleiter
Visionary living arrangements with extensive green terraces have been realised
with the construction of the 70 m high Aglaya garden tower block near Zurich,
which houses not only 85 condominiums, but also office and commercial
space.
From the 5th floor, the building features an 18-m-high funnel-shaped widening.
PERI UP shoring towers were used to support the prefabricated concrete
elements used for this, which simultaneously served as working platforms.
The towers also transferred the loads from the geometrically complex in-situ
concrete beams and from the slabs above. A VARIOKIT truss construction
served as a support for the diagonally arranged components and to secure the
position of the assembly.
The team also had to realise the staggered design of the cantilevered balconies,
which project up to 4 m from the building. For this, the PERI solution stipulated
the use of project-specific framework-type tables based on the VARIOKIT
Engineering Construction Kit and MULTIPROP shoring towers. On the one
hand, the use of rentable system components was very cost-effective; on the
other, the pre-assembled slab tables delivered by PERI minimised valuable
assembly times on the construction site. Thanks to double-capacity on-site
material volumes of the MULTIPROP sub-structure, the slab tables were used
extremely efficiently and, as working platforms with protection panels, provided
a high level of safety even when working at great heights.
Contractor
Landis Bau AG, Zug, Switzerland
Field Service
PERI Switzerland, Ohringen
MCE GmbH, Eschenz, Switzerland
189
190
“The biggest task was the planning of the appropriate systems with which we were
able to implement both the architectural design and safety requirements, as well as
complying with the construction schedule. The PERI systems are designed with the
focus on ensuring high quality, work safety and efficient working operations. PERI
thus played a key role in the construction of the Lakhta Center.”
The round-the-clock technical support and the planned and supplied formwork
and scaffolding solutions from one source facilitated very efficient project man-
agement and fast implementation, including when changes had to be made at
short notice.
Contractor
Renaissance Construction, St. Petersburg, Russia
Field Service
PERI Russia, St. Petersburg
191
192
“Our aim is to always find the right balance between technology and cost-effec-
tiveness. Together with the PERI engineers, we developed the best way to realise
the tower at the right price. Ultimately, we were able to complete the required
building work well before the end of the agreed construction period – to the great
satisfaction of our client.”
For the core of the building, RCS formed a combined climbing formwork
solution together with a self-climbing ACS Platform Unit, as well as crane-
climbed CB Climbing Platforms and BR Shaft Platforms. In addition, the
ACS technology allowed the concrete placing boom to be moved upwards
without the use of a crane. SKYDECK Panel Slab Formwork with its drop-
head system was selected to shutter the floor slabs. The RCS P Climbing
Protection Panel secured all leading edges. The closed enclosure enhanced
work safety levels and avoided any weather-related downtime.
General Contractor
C.M.B. Carpi, Italy
Contractor (Shell)
Ricca Costruzioni S.p.A., Pisa, Italy
Field Service
PERI Italy, Basiano
193
194
“All elements that could be pre-assembled were delivered to the construction site
ready for use. After assembling the climbing system, shuttering operations could be
completed in a very short time. The technical support provided by PERI was absolutely
outstanding.”
The RCS Rail Climbing System was combined with different system formwork:
PERI supplied prefabricated formwork elements based on the VARIO GT 24
Girder Wall Formwork System, which were used to shape the rounded external
walls of the core. MAXIMO and TRIO Panel Formwork, in combination with
RCS, proved to be a big advantage with regard to crane-independent forming of
the internal walls. In addition, TRIO, DOMINO and RUNDFLEX served as wall
formwork for the concrete structural components, which were subsequently
concreted for the climbing formwork.
System use was customised to the specific project and this, combined with the
rail-guided, hydraulically operated RCS climbing technology, facilitated fast cycle
sequences. Aided by the extensive range of PERI support, along with a high
degree of prefabrication, the storeys could be completed in regular 7-day cycles.
Contractor
Interbuild NV, Wilrijk, Belgium
Field Service
PERI Belgium, Boom
195
196
The RCS Rail Climbing System served as climbing formwork for the building
core realised in advance, as well as for enclosure and anti-fall prevention for the
work being carried out on the subsequent building shell floors. The lightweight
RCS CL Climbing Formwork, together with VARIO GT 24 Girder Wall Form-
work, formed hydraulically climbed moving units, thus requiring only a mini-
mum of crane capacity. The PERI implementation solution was supplemented
by RCS MP Landing Platforms which were used for moving and intermediate
storage of formwork materials.
Execution of the floor slabs, including beams with lightweight PERI DUO
composite formwork, was an important success factor on the construction
site. The system is also characterised by its low weight and particularly easy
handling when forming the walls. Work operations were totally enclosed by
means of the RCS P Climbing Protection Panel, thus providing complete
protection against falling and the sometimes very strong winds.
Contractor
J. Portelli Projects, St. Julians, Malta
Field Service
PERI Italy, Basiano
197
“Without PERI, we would not have been able to achieve our “two floors per week”
schedule. The independence of the formwork systems minimised demand for the
single crane servicing the job. The size and quality of the concreting sections exceeded
our expectations.”
198
Thanks to the PERI RCS Rail Climbing System, two floors per week were
achieved on the building complex near the Queensboro Bridge despite
minimum crane availability.
The JACX consists of a five-storey base construction com- three floors each time using the LPS Light Protection Screen.
plete with a centrally positioned 10,000 m² park area. The The gap-free enclosure allowed the construction team to
park is enclosed by two almost identical towers. These work safely and efficiently at all times, including on the upper
structures provide approx. 570,000 m² of usable floor space floors, whilst the directly adjacent area was protected against
in Long Island City. PERI engineers developed a project-spe- falling objects. The park areas on the roof of the base con-
cific concept based on the RCS Self-Climbing Formwork struction and the 29 th and 30 th storey slabs of the two towers
system to ensure cost-effective execution of the structure, were realised with SKYDECK Panel Slab Formwork.
despite having restricted crane availability and a tight con-
struction schedule.
structure without using a crane. This meant the tight climbing Project Management
cycle of 2 floors per week could be maintained, even though New Line Structures NLS, New York, USA
there was only one crane available during work operations. Field Service
PERI USA, Bridgewater, New Jersey
The storeys in the building shell were enclosed in the top
199
“We work with PERI because we think it goes beyond just quality and results.
Our long-standing collaboration is also based on fundamental human values such
as respect, consideration, mutual trust and responsibility.”
200
Groundbreaking architecture
for Amsterdam trade fairs
With 25 storeys and 650 rooms, the nhow RAI is the largest and tallest hotel in
the BeNeLux region. Its bold architectural design was realised cost-effectively
with the help of the PERI formwork and scaffolding concept.
The design for the new nhow hotel bears the signature of the renowned
architect Rem Koolhaas. The iconic 91 m high structure at Amsterdam’s
RAI trade fair centre is divided into three blocks, each with a triangular
ground plan and arranged obliquely in relation to each other. On the 10 th
and 17th floors, the storeys cantilever outwards up to 12 m.
The core of the building was constructed in advance using the ACS and
RCS Self-Climbing Systems – crane-independent and, in combination with
the MAXIMO Panel Formwork, ensuring a fast climbing sequence.
SKYDECK Panel Slab Formwork provided twin benefits when forming the
floor slabs: the systematic assembly sequence with lightweight system
components accelerated shuttering and striking operations. In addition,
the slab soffits could remain visible thanks to the uniform panel grid
arrangement.
Contractor
Red Betonbouw B.V., Oud-Beijerland,
Netherlands
Field Service
PERI Netherlands, Schijndel
PERI Group, Weissenhorn, Germany
201
architectural standards.
The Scottish coastal formations influenced the Japanese star architect Kengo
Kuma with the design of the museum. The outer shell of the building with canti-
levered panels made of prefabricated concrete elements features black surfaces
in the highest quality of architectural concrete. In order to realise this building
structure in concrete, it required formwork and logistics solutions at the highest
level.
Carey’s Civil Engineering was commissioned to carry out the concrete work and
decided in favour of PERI UK to produce the free-form formwork and shoring
solutions for the exterior walls of the building. Before the start of the project, a
model of a formwork element with selected formwork and with designated cur-
vatures and inclined surfaces was produced. Concreting tests showed that the
required geometry, surface texture and pigmentation could be realised and
confirmed that the load support functioned and striking operations would be
problem-free in spite of the unusual shape.
For engineering, formwork production and logistics, PERI UK combined its own
capacities with the expertise and experience of the 3D experts from Weissen-
horn. The good coordination of all parties involved was crucial because at the
peak of the project, Carey’s Civil Engineering required 1,000 m² of customised
formwork elements per month from PERI.
Main Contractor
BAM Construction UK Ltd., Hemel Hempstead,
Great Britain
Sub-Contractor
Careys Civil Engineering, Wembley,
Great Britain
Field Service
PERI Great Britain, Rugby
PERI Group, W
eissenhorn, Germany
204
205
Comprehensive solution
for a talent hothouse
206
“The complex design was the main reason why we decided in favour of PERI.
Thanks to the excellent engineering, technical support and highly developed
systems, we could master every challenge we faced.”
The Jack, Joseph and Morton Mandel Foundation building will be a place
where young men and women learn and are trained to become highly qualified
educational and social leaders. The new building situated in the Jerusalem
Botanical Garden has 3,000 m² of parking and additional two floors each
2,400 m².
In addition to the very tight building schedule, a large part of the concrete
construction was to be realised in architectural concrete quality. Constructed
using SKYDECK Slab Formwork, the slab alone featured a 2,000 m² architec
tural concrete surface when it was completed. In the edge areas of the slabs,
MULTIFLEX Girder Slab Formwork was used to great effect. The support
with PERI UP Flex scaffold towers created a flexible solution with a high
load-bearing capacity – ideal for executing the up to 3 m cantilevered slabs in
heights up to 12 m.
For realising the large circular entrance hall, RUNDFLEX Wall Formwork was
selected. The pre-assembled elements could be easily and quickly adjusted on
site in order to match the required radii with the help of the provided templates.
For the slender columns in the reception area, lightweight LICO Column
Formwork was deployed.
The straight walls of the facades facing the outside and inner courtyard
feature numerous high windows and were constructed using the easily placed
DOMINO Formwork which, like all the other formwork and scaffolding
components, were delivered to the construction site on a just-in-time basis.
Contractor
Ram Aderet Civil Engineering Ltd
Haamal 10/10 st, Rosh Ha‘ayin, Israel
Field Service
PERI Israel, Rosh Ha‘ayin
207
208
The architectural concrete surfaces of the two buildings had to meet the high-
est quality requirements. The outer shell was realised with the help of VARIO
GT 24 Girder Formwork. The formwork elements were pre-assembled at the
PERI assembly facility and delivered to the construction site as ready-to-use
6.60 m and 4.80 m high modules which also included the working platforms.
For realising the slabs, SKYDECK Panel Slab Formwork was selected which
was likewise supported on MULTIPROP aluminum props. Thanks to the high
load-bearing capacity of the system, slabs up to 50 cm thick could easily be
formed which allowed the execution of all slabs to be carried out with just one Contractor
SOGEA SUD BATIMENT, Montpellier, France
system.
Field Service
PERI France, Agence Méditerranée et Bureau
The challenge when forming the internal walls of the building was ensuring a Central, Meaux
209
“Having been in the business for many years, I can say that PERI UP Flex is the most
adaptable and versatile system I have ever worked with, with its wide range of deck-
ing, waler and accessory dimensions.”
210
“The Chaddy” is one of the largest shopping centres in the and the direction of the decking can be changed: thus, the
southern hemisphere, and not just since since its 34,000 m² scaffolding could exactly follow the curved geometry of the
expansion to a total area of now 212,000 m². Since the exten- roof construction at working heights of up to 20 m and
sion, the atrium is spanned by a spectacular, complex-shaped lengths up to 85 m. End-to-end guardrails, toeboards and
glass roof. Key data: 140 m long, up to 31 m high, maximum non-slip, gap-free decking ensured a high level of safety
span 44 m, area 7,000 m². when working, also at great heights.
The glass roof was realised while the centre´s 500 shops con- The fact that the tight schedule could be maintained was
tinued to be open fordaily business after a construction phase largely due to the scaffolding technology. Thanks to the low
of only five months. The jointly designed scaffolding solution dead weight of the system components and the virtually
on the basis of the PERI UP Flex Modular Scaffold System tool-free assembly, erection and dismantling of the scaffold-
was used for transferring loads and as working platforms for ing could be carried out easily and quickly by hand without
installing the edge beams, steel girders and glass panels. taking up much crane time.
Working at great heights along with only minimum crane
availability for moving materials was significantly simplified in
particular through the low weight of the system components
and the integrated protection against lifting on the decking. Contractor
The PERI UP Flex Modular Scaffolding is based on a continu- Nomad Scaffold, Melbourne, Australia
211
Historical architecture
replicated in concrete
212
“The task of completely rebuilding the cathedral in such a short time seemed unrealistic.
Thanks to the technically versed and well-coordinated work provided by PERI, we were
able to meet the construction deadlines. Today as well as looking back on what we have
achieved together, we can say with certainty that the PERI team works with absolute
professionalism in its field.”
The model is historical while the construction is very modern: after its destruc-
tion in 1932, unfortunately only drawings exist of the Cathedral of the Virgin of
Kazan in the eponymous capital of the Russian Republic of Tatarsan. Now, the
church with its numerous small and large domes of up to 15 m in diameter has
been replicated in concrete based on these drawings.
A large part of the formwork was delivered pre-assembled to the jobsite, not
only to reduce the workload for the construction team on site but also to repli-
cate the arched structures and dome vaulting as accurately as possible. Form-
work for larger structures, such as the domes, were constructed on the basis
of the VARIOKIT Engineering Construction Kit and positioned on PERI UP
shoring towers. Above all, the large 3D formwork boxes for the up to 7 m high
spandrels, curved in all room dimensions, between the round arches and
domes had to be accurately assembled. For connecting the corners of the
formwork boxes, PERI provided its individually developed solution in order to
ensure that error-free installation was as easy as possible to carry out.
For construction of the recurring forms, the formwork was used multiple times
and moved with the crane. For each formwork box as well as every dome form-
work assembly, a separate dismantling plan was included in order to prevent
any damage and to minimize the time and effort required for the moving proce-
dure. In addition, PERI specialists were constantly on site throughout the entire
construction period of around 9 months – alongside the precisely pre-assem-
bled formwork elements, one of the success factors of the project.
Contractor
LLC Evrostroyholding+, Kasan, Russia
Field Service
PERI Russia, Moscow
213
214
“For realising the museum with its complex geometry and featuring a mostly architectural
concrete design required an individually adapted formwork solution. Perfect delivery logistics
along with the readily availability of the required formwork and scaffolding played an impor-
tant role in the implementation. Once again, PERI proved to be a reliable partner on the
construction site.”
In addition to the unusual geometry with the inclined building walls, a large
part of the concrete surfaces was to be realised in architectural concrete qual-
ity. PERI engineers worked closely together with the site management team
to develop a formwork solution based on VARIO GT 24 Girder Wall Formwork
combined with VARIOKIT system components. As a result, the anchor posi-
tions could be freely selected and the individual elements could be seamless-
ly joined together. Working platforms based on the VARIOKIT Engineering
Construction Kit guaranteed work could be carried out extremely safely on
the inclined walls, also at great heights. TRIO Panel Formwork with integrated
working platforms was used to construct the straight internal walls some of
which reached a height of 14 m.
Used as shoring and stair access means, the PERI UP Flex scaffolding system
ensured quick and safe construction progress when realising the shell of the
building. In addition, the modular scaffolding – in its function as working scaf-
fold – could be optimally adapted to match the complex geometry of the
building so that working at a height of 40 m was safe and comfortable for
construction team personnel. VARIOKIT bracket constructions integrated into
the scaffolding solution allowed separate individual scaffolding segments to
be separated from each other, thus increasing the cost-effectiveness of the
solution.
Contractor
Warbud - Hochtief - Muzeum II WŚ S.C.,
Warsaw, Poland
Field Service
PERI Poland, Stołeczna
215
“Two other contractors had taken a look at this project and then turned it down.
PERI took on this challenge with us. PERI was very probably the only company that
could have constructed and supplied the forms to us.”
216
Sweeping curvatures
brought into shape
The National Veterans Memorial and Museum brings together a war and
military museum and veterans memorial in one building. PERI supplied a
range of unique shuttering formwork to realise the complex architecture.
The constructional design of the sculptural museum building A total of 400 box outs were required for the openings in the
consists of several concentric arches growing out of the concrete rings. These were also designed in 3D together with
ground. The arches interlace, creating intertwined concrete a significant portion of the wall formwork. The formwork
rings that form the walls of the museum and support a high- units were accurately prefabricated in the PERI assembly
er-positioned open space. The architecturally challenging facility with sizes ranging from approx. 3 m² up to 25 m². In
building had to be constructed mainly on the basis of a 3D this case, particular attention was paid to ensuring that the
model, because no dimensions were included in the plans box outs were also executed with tapered edges.
due to the complicated structure.
Almost the entire building was designed to feature an archi-
Large concreting sections up to 36 m long and 12 m high tectural concrete finish and realised with self-compacting
were required to realise the self-supporting arches. Over concrete. The concrete result turned out so well due to its
9,000 m² of VARIO GT 24 Girder Wall Formwork – supported outstanding, uniform surface quality that it was decided to
by PERI UP shoring – was designed and delivered. Due to the dispense with the originally planned sandblasting work.
constantly changing radius, tapering of the concrete bands
and complex intersection points, each individual formwork
element was unique. Each element was mounted according
to the planned curvature, while each formwork panel had to
be exactly placed in position and adapted to match the curva-
Contractor
ture. Baker Concrete Construction Inc., Monroe,
Ohio, USA
Field Service
PERI USA, Chicago
217
218
“The PERI team provided us with excellent support during the conception phase,
including tests on true-to-scale models in the original size. The PERI solution not only
worked perfectly, it also fulfilled all safety standards.”
For forming the walls and columns, MAXIMO Panel Formwork was used.
The elements were completely pre-assembled on the ground and positioned
as one unit with the crane. The quality specifications for the architectural
concrete, which were so important for the success of the project, were easily
met with MAXIMO, also through the regularly positioned anchor points.
Another task proved to be a major challenge: the floor slabs of the shell struc-
ture were to be clad in a protective wall in order to be able to begin early with
subsequent work operations such as finishing work on the facade. A standard
solution could not be used due to the curved, counterposed and outwardly
tapered shape of the slabs. Together with the contractor, PERI developed a
special construction consisting of slab tables with permanently mounted LPS
mesh enclosures for the two upper storeys respectively. After the feasibility
was verified in a series of tests, this solution was used very successfully in the
MULTIPROP slab props and heavy-duty spindles
project. With a lifting fork specifically adapted to suit project requirements, the taken from the VARIOKIT Engineering Construc-
tion Kit were used for supporting the wide canti-
slab tables could be lifted two floors and then re-positioned. levered areas in the bottom storeys.
Contractor
Dalma Form Specialists, Pymble, Australia
Field Service
PERI Australia, Sydney
219
220
Dune architecture
in concrete and steel
Award-winning enterprise, Bee’ah, deals with environmental The curved walls of the building also had to meet the highest
and waste management. The new headquarters in Sharjah quality requirements. The use of VARIO GT 24 Girder Wall
not only convinces with its outstanding life cycle assessment Formwork led to the fulfillment of all stipulated specifications.
but it also sets new standards in modern architecture. As a result, the architectural concrete surfaces throughout
Designed by Zaha Hadid, most of the supporting structures the building reflect the architectural demand of creating
of the complex designed by Zaha Hadid are made of steel but something quite unique.
prominent concrete elements have set important accents.
221
222
“The PERI system allows work to take place on 3 levels simultaneously. The working
platforms have sufficient space and can be easily and accurately adapted to suit the
respective site conditions. The systems are very flexible and practical for use at all
heights.”
The Mahatma Mandir in Gandhinagar in the Indian state of Gujarat is not only a
convention and event centre but also a memorial site for Mahatma Gandhi. The
visual appearance of the almost 14 hectare site is characterized by two highly
visible pylons which tower over the entire complex. These hold the support
cables of a suspension bridge that spans a very busy road and connects the
congress centre in the east with the museum in the west.
The SCS Climbing System was used to form the inclined, 85 m high pylons.
With this system, the loads resulting from the fresh concrete pressure are
transferred via the brackets into the previous concreting section by climbing
anchors whereby the formwork is securely anchored at all times. All work
operations are therefore carried out easily and safely – also at great heights.
The climbing formwork used had three levels, each with a spacious working Contractor
Shapoorji Pallonji & Co. Ltd., Mumbai, India
platform. The wide platforms facilitated smooth construction progress for the
Field Service
site workforce. Also for the 15-degree pylon inclination, the SCS platforms PERI India, Mumbai
themselves could be horizontally aligned thus providing safe, horizontal working
levels. The SCS 250 version used in this project, equipped with VARIO GT 24
Girder Wall Formwork, allowed the wall formwork to be retracted by 63 cm.
Consequently, this provided sufficient space for the reinforcement work, as-
sembly of the scaffold anchoring as well shuttering and striking of the box outs.
223
and goods to travel from one side to the other. PERI support-
“The PERI ACS Self-Climbing System in connection with the retractable formwork
and PERI UP scaffolding served as quick and easy formwork for the pylon construc-
tion and safe access throughout. This solution accelerated the concreting work and
shortened the cycle times so that we could climb 5 m high sections every 5 days.”
226
Three pylons carry the around 1,000 m long bridge superstructure across the River The new six lane, more than 2,000 m long
Mersey Gateway Bridge with its three striking
Mersey. For supporting the superstructure, the highest pylon widens at a height of 125 m, 80 m and 110 m high pylons, provides
considerable relief for the heavy flow of traffic
approx. 20 m from 6 m to a total of 17.5 m. At this point, hammer-head and pier-
in the Liverpool region, especially between
head formwork were used. Runcorn and Widnes.
For this, PERI´s British engineers developed a concept on the basis of horizontal-
ly-positioned SB Brace Frame units that could be coupled together, whereby 7 m
wide working levels were created. At the same time, the brace frames were used
for transferring loads from the cantilevered concreting sections into the pylon
shaft. The respective concreting heights were exactly matched to suit the anchor-
ing possibilities in the shaft section previously concreted while forming took place
requiring around 21 concreting cycles each 5 m high.
The ACS R Self-Climbing System, combined with VARIO GT 24 girder wall form-
work, optimised the construction of the upper pylon shaft. The wall formwork was
suspended from the top working platform so that the formwork carriage could
easily be retracted together with the formwork after striking and the top working
platform could then be folded upwards. In this way, generous working areas for the
reinforcement work were created. PERI UP Flex reinforcement scaffolding and all
required materials were easily lifted in by crane.
Contractor
Merseylink Civil Contractors: FCC Construcción
The simultaneous climbing of several units reduced the number of leading edges. S.A., Kier Infrastructure and Overseas Limited;
Furthermore, the enclosed working platforms provided additional safety and, Samsung C&T Corporation
at the same time, protection against the high wind speeds as well as rain. Field Service
PERI United Kingdom, Rugby
227
228
Record-breaking bridge
successfully completed
“We are absolutely satisfied with our decision to work together with PERI. We were
excellently supported throughout the project, and the simple handling of the systems
also ensured increased work productivity.”
The new cable-stayed bridge over the Rio Magdalena is the longest bridge in
Colombia with a total length of 2.3 km. The main span is 380 m long. Here, the
38 m wide superstructure is supported by 80 m high pylons. Headroom up to
35 m allows ships to continue using the river; larger vessels can also be
accommodated.
Contractor
SES Puente Magdalena consortium:
Sacyr Construcción Colombia SAS; Sacyr Chile;
Esgamo Ingenieros Constructores
Field Service
PERI Colombia, Bogota
229
“The solution developed with PERI engineers using VRB truss girder units allowed
us to work efficiently at all times in spite of the difficult ground conditions. Due to
the delivery reliability of the required formwork and scaffolding materials, we were
able to maintain the tight construction schedule. On-site training and constant
construction supervision provided by the PERI supervisors ensured the correct
assembly and maintenance of the materials.”
230
As part of the S-11 motorway expansion project, the M-8 PERI ensured timely pre-assembly of the 12.50 m long
road bridge crosses the wetlands area surrounding the the Heavy-Duty Truss Girder VRB segments at the PERI plant.
Wilczy Canal with two lanes in both directions. Difficult Subsequently, several material packages – consisting of
ground conditions required a non-standard construction braced birdcage scaffolding with truss girder frames – were
method that could not be realised using conventional support delivered just-in-time to the construction site, where they
due to the large spans and high loads. PERI provided a very were connected to form girder pairs and mounted on the
efficient solution to meet these requirements based on the VST Shoring Tower Frames. In this way, the truss girders
VARIOKIT Engineering Construction Kit, which included could be assembled at the same time as the shoring towers
planning, pre-assembly and delivery, as well as on-going were erected.
project support.
PERI engineers supported the contractor’s team throughout
The implementation plan envisaged two independent bridge the entire construction process with punctual logistics and
superstructures with a pre-stressed, twin-webbed T-beam on-going project support. This meant that all requirements
cross-section. The best solution proved to be a shoring con- were met and the tight construction schedule was main-
struction with large span widths of 20.50 m and 25.50 m tained.
respectively, positioned on the foundations of the fixed bridge
supports and without any intermediate supports in the bridge
segments.
231
232
“We decided in favour of PERI due to the guaranteed quality and safety consid-
erations along with a convincing price-performance ratio. An essential part of
the excellent cooperation was the technical support right from the very start of
construction.”
The 1,400 m long, four-lane bridge, spanning the Roskilde Fjord between
Marbæk and Tørslev, shortens the connection between two peninsulas south
of Frederikssund. The 10 km long, four-lane expansion highway connection
shortens travel times and takes the high volume of through-traffic away from
the nearby inner city districts.
Contractor
RBAI JV I/S: Rizzani de Eccher, Udine, Italy;
Acciona Infrastructures, Aclobendas, Spain;
BESIX, Brussels, Belgium
Field Service
PERI Denmark, Greve
233
234
“I’ve known PERI for 35 years now, from my time in Spain. Exactly like there, the
materials here in Mexico are in very good condition. The technical department did a
fantastic job. ALPHAKIT, just like the other PERI systems, is an excellent system
that allows us to work much faster and easier.”
For the edge areas of the bridge, PERI engineers and the contractors developed
an efficient solution based on the ALPHAKIT System. For this, the materials
were delivered just-in-time to the jobsite to meet the respective construction
phase requirements and mounted on-site to form ALPHAKIT Heavy-Duty Truss
Girders and shoring towers. As a result, the 65 m long construction for the
superstructure build, consisting of heavy-duty truss girder units, could be
realised with a minimum of space and crane time. The outermost 12 m of the
central bridge section was supported by ST 100 Stacking Towers. This solution
made it possible to realise an 80 m superstructure section in one piece. After
concreting and striking, this section was simply moved into a new position on
the opposite side of the bridge.
Contractor
Azvi Mexico, Ciudad de México Grupo Azvi,
Sevilla, Spain
Field Service
PERI Mexico, Huehuetoca
235
236
“I’m extremely satisfied with the climbing solution and cooperation with PERI.
I would recommend their systems to anyone. Simple application and short
execution time really helped us realise this project.”
The new Champlain Bridge is a 3.4 km long cable-stayed bridge with a striking,
approx. 170-m-high concrete pylon and asymmetrically arranged guy ropes.
The characteristic bridge between Montreal and Brossard includes a two-lane
railway corridor, six lanes for vehicles and a pathway for both cyclists and
pedestrians. PERI provided a complete climbing solution for the upper pylon
as well as extensive on-site support.
The RCS Rail Climbing System was used on the inside of the hollow pylon legs,
while the ACS Self-Climbing System raised the VARIO formwork on the out-
side. The combination of the climbing systems supported the fast construction
progress: both systems could be lifted into the next section using climbing
hydraulics, crane time could be reduced and the 6 m high sections climbed in
12-day cycles. The working platforms remained securely attached to the pylons
during the entire climbing process and provided construction site personnel
with a comfortable and safe working environment at all times.
On the outer side of the ACS system, RCS system protection panel enclosures
- pre-assembled on the ground – formed a virtually gap-free protective shield
for the working platforms. As a result, this further increased safety levels and
protected the workers against the sometimes harsh weather conditions high
above the St. Lawrence River.
At the PERI assembly hall, climbing platforms and VARIO Girder Wall Form-
work elements were accurately adapted to match the complex pylon geometry
Contractor
and delivered to the construction site as pre-assembled units. The final assem- SIGNATURE SUR LE SAINT-LAURENT CON-
STRUCTION: SNC-Lavalin, ACS, HOCHTIEF;
bly took place here in accordance with the detailed PERI general arrangement Melbourne, Canada
drawings under the guidance of an experienced PERI supervisor.
Field Service
PERI Canada, Laval and Bolton PERI Group,
Weissenhorn, Germany
237
“Together with the team of PERI engineers with their fantastic expertise, we
quickly defined the technical solutions for realising the bridge project. It was
extremely important to us that on-site support was always available when
VARIOKIT was used.”
238
The 381 m long motorway bridge is part of the Pan-European up to 4.00 m in the centre of the bridge. The concreting
Transport Corridor VIII, an international transport axis between cycles also varied in length from 3.30 m through to 5.00 m.
Albania and Bulgaria. In the mountainous south-west region In addition to the constantly changing superstructure
of Northern Macedonia, a total of 14 viaducts were built to cross-sections, the PERI solution also took into account
realise the first sections of the route. The length of around the constant longitudinal inclination of 2.8 %, as well as the
10 km required excavating more than 4,000,000 m³ of earth, variable transverse inclinations of 1.5 % to 6.0 %.
as well as processing 150,000 m³ of concrete and 15,000 t
of reinforcement. During the realisation of the bridge piers, SCS Climbing
Formwork, supplemented by CB Climbing Platforms and
The biggest challenge faced on the four-lane highway section horizontally positioned SB Brace Frames combined with the
was the viaduct at Kilometer 9, which had to be constructed TRIO and VARIO GT 24 Wall Formwork Systems, ensured
using the balanced cantilever method. For the bridge piers fast construction progress of the structures. PERI UP Stair
and superstructure, PERI provided the most cost-effective Tower assembly kept pace with the formworking operations
formwork solution. In particular, the hydraulic solutions for and provided safe access to the various working areas.
adapting and aligning purposes, along with the independent
moving procedure of the formwork carriage, shortened
execution times. As a result, the construction team realised a
regular 7-day concreting cycle.
slabs were completed within the tight project schedule. The Field Service
PERI Serbia, Simanovci
superstructure height varied between 9.00 m at the piers and
239
240
“The construction of the station in Afragola, designed by Zaha Hadid, was not a simple
undertaking – we had to harmonise the future-oriented architectural concept together
with the working material used, namely concrete Thanks to the excellent c ollaboration
between Astaldi and PERI, we could successfully master the task in hand!”
Award-winning architect, Zaha Hadid, designed the futuristic “Porta del Sud”
railway station for high-speed trains near Naples. PERI project engineers
helped to suitably realise this ambitious design consisting of concrete, steel
and glass. They developed a complete formwork and scaffolding concept for
the reinforced concrete work required for the slab formwork totalling 19,000 m²
as well as the 26,500 m² wall area. PERI Italy also contributed a sophisticated
concept consisting of system technology and engineering for constructing the
two 450 m long platforms and 44 concrete Y-shaped piers.
Special geometries along with the defined joint and tie arrangement were
optimally mastered using VARIO GT 24 formwork elements whilst keeping
the amount of work and time to a minimum. For the more complex curva-
tures, 3D polystyrene elements planned in advance positioned on the
VARIO GT 24 formed the negative of the later wall. For forming all the other
walls, the universal TRIO Wall Formwork was used High quality FinPly form-
work panels ensured that the high architectural concrete requirements placed
on the walls could be met. In total, PERI supplied around 30,000 m² of ply-
wood panels with different thicknesses and dimensions including large-sized
FinPly Maxi panels measuring 7,500 mm x 2,700 mm.
General Contractor
Astaldi S.p.a., Rome, Italy
Field Service
PERI Italy, Rome
241
242
“With the support of PERI, we completed the work on the suspended slabs ahead
of schedule, a huge success in our race against time – and in a very safe working
environment too.”
Istanbul Airport can accommodate 90 million passengers per hand in a longitudinal direction. Thanks to the high system
year but has the capacity to increase this up to 200 million rigidity, areas of up to 1,000 m² could be moved as a single
passengers annually. Two gigantic terminal buildings have unit. Regardless of the height of the platforms – some of the
been planned to handle this enormous passenger volume - working platforms were mounted at heights reaching 40 m –
the first terminal alone offers 680,000 m² of usable space. the LGS elements could be moved manually to their next
For the internal work on the extensive slab soffits, the con- place of use in just 15 minutes. This led to enormous time
tractor and PERI created working platforms based on the LGS savings which, in turn, meant that the planned construction
Lattice Girder System. The system provides safe and efficient plan was realised earlier than expected. Last but not least,
solutions for large spans and high loads. all PERI team members worked closely with the site manage-
ment to ensure that the large quantities of materials were
To process the approx. 220,000 m² slab area at heights reach- delivered just-in-time despite the short lead time.
ing up to 17.50 m, the construction teams installed a total of
16,500 m² of platforms with spans of up to 15 m, supported
by PERI UP Flex Shoring. The area under the platform was
protected by fitting system decking, which meant that the
check-in counters could be installed earlier than planned.
Contractor
IGA Havalimanları İnşaatı Adi Ortaklığı Tic.
Due to the tight schedule and enormous slab surface, it was İşletmesi, Istanbul, Turkey
also necessary to minimise the assembly and modification
Field Service
times of the working platforms. As a result, PERI used a PERI Turkey, Istanbul PERI Group,
Weissenhorn, Germany
rolling system to move the platform elements comfortably by
243
“Together with the PERI specialists and their vast experience and commitment,
we succeeded in turning the architectural design into reality with the help of the
individual formwork solution.”
244
The new Metro Line 3 station concourse at the famous Plaza de Armas in
the centre of Santiago is one of the country’s modern urban development
projects. As a visual and technical engineering highlight, the new struc-
ture harmoniously blends into the listed surrounding area and characteris-
es the cityscape of today.
Due to the downtown location and limited storage space, PERI delivered
the ready-to-use pre-assembled boxed elements just-in-time to the
construction site. Here, they could be connected to form shape-providing
complete formwork – installed on MULTIPROP shoring towers and similar
to system formwork. In total, 900 m² of the most geometrically demand-
ing slab surface was realised with a very high quality of execution.
Contractor
Piques y Túneles metro S.A., Santiago de Chile
(Dragados; Besalco)
Field Service
PERI Chile, Colina, Santiago de Chile
PERI Brazil, Vargem Grande Paulista
245
246
“Also for this large project, PERI provided us with an ideal combination of
systems that allowed us to achieve outstanding quality using safe working
conditions. The collaboration resulted in optimal technical solutions and
on-time delivery of large quantities of materials.”
The new Gazenica passenger port relieves the historic harbour in Zadar’s old
town district which is a designated UNESCO World Heritage Site. To ensure
that vessels up to 400 m long can also dock here, a new 25,000 m² facility has
been built in the vicinity that includes a two-story passenger and ferry terminal.
Thanks to the intelligent combination of the different PERI formwork and
scaffolding systems, all specified quality goals and time schedules were
reliably achieved in the project.
Different PERI systems were used for the entire terminal building – dependent
on the component geometry and load as well as the required concrete quality.
DUO and TRIO system formwork were used for the foundations, beams, col-
umns and walls. Depending on the geometric complexity and support height,
MULTIFLEX or SKYDECK were selected for constructing the slabs. In turn,
PERI UP Flex proved itself as flexibly adaptable shoring.
General Contractor
STRABAG d.o.o. Zagreb, Direktion MU-CC,
Croatia
Field Service
PERI Croatia, Zagreb
247
248
“PERI played a decisive role in realizing this once-in-a-century structure. Tunnel entrances,
breakwaters and operations building were extremely challenging due to maintaining the
highest quality requirements. The formwork could be easily moved and provided the best
possible safety and first-class architectural concrete quality. We came to appreciate the
professional engineering, service and the striving of the PERI engineers for perfection.”
On the two artificial islands, which were created for the transition area
from the tunnel to the respective adjacent bridge, the operations buildings
for the mega transport infrastructure were built along with a number of
other structures. The east island forms the transition area from the im-
mersed tunnel in the direction of Hong Kong. The building on the island
provides, among other things, space for a comprehensive exhibition on the
The expertise of PERI engineers in project-specif-
transport engineering project. The structure on the artificially created ic formwork and shoring planning allowed the exe-
cution of the complex geometries of tunnels, en-
island towards the west consists primarily of the required operating and trances and operations building in the highest SB
utility facilities for the underwater tunnel. 4 architectural concrete quality.
249
Marieholm Tunnel, Gothenburg, Sweden
250
When manufacturing the three 100 m long segments for the Gothenburg
immersed tunnel, the VARIOKIT Engineering Construction Kit ensured
efficient work operations in the dry dock. Project-specific solutions mixed
with standardised system components optimised the costs.
For these segments and the tunnel exits, PERI and Züblin Scandinavia AB
jointly planned project-specific formwork solutions based on VARIO GT 24
Girder Wall Formwork. The internal wall was formed using TRIO panel
formwork.
For forming the arches and slabs, two PERI tunnel formwork carriages en-
sured fast and cost-effective procedures. Heavy-duty wheels and crane rails
were used to move the almost 25 m long formwork carriages whereby the
advantages of the flexible, lightweight and separable VARIOKIT formwork
carriage were ably demonstrated in the narrow working space.
Contractor
Züblin Scandinavia AB, Sweden
For the rounded arches in the upper area of the tunnel, the PERI team devel-
Field Service
oped special elements. Here, the SCS Climbing System supported the exter-
PERI Sweden, Halmstad
nal wall formwork. PERI UP Flex stair towers and reinforcement scaffolding
guaranteed safe and easy access to the dry dock as well as various working
areas. Last but not least, the PERI option regarding the rental of materials re-
ally paid off. This meant it was possible to accurately and cost-effectively plan
the specific project requirements. The construction site was delivered to on
schedule and always with the correct quantities.
“Cooperation with PERI began at the tendering phase. The flexible but robust formwork
system was one of the key aspects in the creation of the execution concept for the tunnel
elements. At the planning stage, the implementation team and PERI’s technical support
team then jointly optimised the concept. PERI provided excellent technical support in both
phases and always proved to be a reliable partner, with good ideas and solutions.”
251
252
Just-in-time factory
and site logistics
Ing. David Grygar Site Manager
“Thanks to the right design and provision of transport, we were able to start the
construction work on schedule. The movable constructions from PERI allowed us to
shift the formwork very quickly thus saving both time and money.”
The 171 km long Dálnice 3 between Prague and Linz is taking shape.
Near České Budějovice, a pedestrian tunnel was realised in the form of an
underpass.
In order to meet the strict deadline, pre-assembly was carried out at the factory.
Complete formwork units consisting of SLS Heavy-Duty Spindles, GRV Articu-
lated Walers and GT 24 Lattice Girders ensured efficient construction process.
As a result, transport and construction site logistics were significantly simpli-
fied. In addition, concrete pump connections and external vibrator equipment
had been included in the planning and also delivered to the jobsite.
Contractor
GRIV s.r.o., České Budějovice, Czech Republic
Field Service
PERI Czech Republic, Jesenice and Prahy,
Czech Republic
253
“We worked well together with PERI and received very competent support from
the beginning to the end: from the planning stage and provision of a supervisor
through to project coordination during the construction phase.“
254
The new Bremerhaven inner-city harbour tunnel provides an from 14 m up to 19 m, the standard formwork carriage could
improved connection to the port facility and, at the same be adjusted accordingly. In order to easily and safely reach
time, gave residents in the north of the city relief from high the bottom of the 15 m deep and 16 m wide construction pit
traffic volumes. During the construction of the 1,800 m long of each individual building dock, 10 PERI UP Flex stair towers
tunnel at a depth of 15 m, 200,000 m³ of concrete and were used. These could be moved to the next section each
24,000 t of steel were processed with the help of the PERI time requiring only one crane pick thus saving valuable time.
solution. This also applied to the semi-monolithic construction A PERI project coordinator ensured problem-free and precise
of the 10 m long tunnel sections. coordination between the site management and PERI engi-
neers. A measure that positively influenced the entire con-
Here, 3 wall and 4 slab formwork carriages demonstrated struction process.
their performance power on a daily basis. For maximum tight-
ness, the bottom slab and walls were concreted in one pour.
For this, two launching beams spanned the respective section
which was to be concreted. The subsequent slab formwork
carriage followed the cycle specifications of the wall form-
work carriage. Moving forward as well as shuttering and
striking procedures were carried out hydraulically. The flexible Contractor
ARGE Hafentunnel Bremerhaven, Germany;
VARIOKIT tunnel formwork solution allowed the use of the Ed. Züblin AG, Direktion Ingenieurbau Nord,
formwork carriages on both straight and curved sections of Gruppe Bremen-Niedersachsen, Bremen, Germany
the tunnel. Also for the construction of the widened areas Field Service
PERI Germany, Hamburg Office; PERI Germany, Weissenhorn
255
256
As part of the Pan-European Transport Corridor X, the largest road tunnel in Serbia
connects the city of Niš to the Macedonian border. Forming part of the E 75
motorway, it relieves both private and freight transport volumes between Central
and South-Eastern Europe, and the Middle East.
The contractors relied on PERI expertise and VARIOKIT to realise the six cross
connections between the two tunnel tubes when constructing the twin-tube,
1,800 m long tunnel near Manajle. The flexibility of the Engineering Construction
Kit was also exploited to the full when constructing the slightly wider emergency
bays.
The structures were realised quickly and economically using VARIOKIT tunnel
formwork carriages, which consisted of 90 % rentable system components.
With a simple design, the large formwork and scaffold units could be set up
quickly with the help of a hydraulic unit and then quickly moved into position.
For the intersection points on the main and cross-connection passages, specially
shaped components from PERI were cut to size at the factory and delivered
just-in-time to the construction sites. Forming the entrance portals to the cross
connections also required a geometrically flexible system to accommodate the
different radii that merged into one another. The continuously adjustable
RUNDFLEX Circular Formwork demonstrated its strength once again here,
Contractor
allowing realisation of all radii from 1 m upwards without any element modification. EURO ALLIANCE TUNNELS JSC Ogranak
Beograd, Serbia
Field Service
PERI Serbia, Simanovci
257
“This project was a technological and logistical challenge even for our very experienced
team. PERI was an essential partner to ensure the success of the project. On the basis
of a joint cooperation during the entire construction work and the systems used,
we were able to achieve our planned goals: safety, quality and planning capability.”
260
The Laúca Dam on the River Cuanza is 1,242 m long and 156 m high, and has an
installed capacity of 8.6 billion kWh per year. Around 2.6 million m³ of concrete
was shaped to realise this impressive hydropower facility with construction costs
of USD 4.3 billion. PERI engineers supported the construction work with
project-specific system solutions.
The VARIO GT 24 Girder Wall Formwork together with the CB Climbing System
formed crane-climbed units to form the massive reinforced concrete walls of the
intake structures which are up to 1.75 m thick. In the process, PERI UP Stair
Towers facilitated safe access to all working levels even at great heights. Further-
more, PERI UP was also universally used as shoring for this construction project.
Contractor
Sacyr Somague S.A., Lisboa, Portugal
Field Service
PERI Portugal, Castanheira do Ribatejo
261
262
“The MAXIMO was the right system for large wall thickness, high walls and
numerous applications.”
The PERI formwork solution was mainly based on the MAXIMO Panel Form-
work and RUNDFLEX Circular Formwork systems. The elements of both wall
formwork systems could be seamlessly connected with each other by means of
the BFD Alignment Coupler. With the BFD as the only connecting component,
even filler timber compensations and height extensions could easily be realised.
Using MAXIMO, the straight walls could be shuttered through a fast cycle se-
quence and in high quality. Here, the one-sided MX 18 Tie Technology ensured
fast shuttering times for all wall thicknesses, because no additional site person-
nel or scaffolding was required on the primary formwork when closing. The
small number of tie points in the MAXIMO system not only further accelerated
forming operations but also reduced the time and expense involved in subse-
quent sealing measures.
Field Service
PERI Austria, Nussdorf ob der Traisen
263
A functional work
of art made of concrete
264
“Due to the tight schedule and stiff competition, we decided in favour of the RCS
system. The easy and simple handling meant that 3 workers were sufficient to carry out
the shuttering operations. In addition, the safety installations were an integral part of
the assembly and did not have to be adapted to suit the different construction phases.”
Perrard, a subsidiary of the Eiffage Group, was looking for a safe as well as very
efficient solution for the construction of a new water tower near the town of
Gasperich in southern Luxembourg. The schedule for the construction and
planning phases was extremely tight, while the budget demanded cost-effective,
optimal solutions and, at the same time, there should be no compromise on work
safety. Furthermore, due to its exposed position, the outside of the 73 m high
circular tower had to be realised with an architectural concrete look.
External and internal formwork were based on the RCS Rail Climbing System and
supplemented by VARIO GT 24 Wall Formwork elements which had been adapted
to match the curvature. Using a 3.30 m standard cycle height, only 2 rows of ties
were required, which resulted in significant time savings for shuttering and striking
operations, as well as advantages regarding the waterproof construction.
The RCS system also allows rail-guided climbing with circular walls, so that the
moving units are securely connected to the structure at all times by means of
climbing shoes. On the outside, the RCS climbed independently with the help of
mobile climbing hydraulics, and the internal formwork was lifted by crane.
The PERI solution was completed with the addition of the MAXIMO Panel Form-
work for the internal walls and SKYDECK for the construction of the intermediate
slabs. PERI UP Flex was used in this construction project as reinforcement scaffold
and as a lightweight site stair tower which provided a flexible access solution.
Contractor
Perrard S.A., Niederanven, Luxembourg
Field Service
PERI BeNeLux Luxembourg, Contern
265
“This construction site is yet again another highlight for me. The lock facility was a
demanding construction project whereby numerous mounting parts with very tight
tolerance specifications had to be taken into consideration. The coordination was
perfect: PERI supplied the formwork elements completely prefabricated - and there
was no component that did not fit. My appreciation goes out to all PERI engineers
who worked with us with their high level of technical understanding – a big thank
you. The collaboration could not have been better.”
266
Accurately prefabricated
formwork solution
A new 216 m long, 12.60 m wide and 12.70 m high lock cient striking operations as well as ensuring reusability. The
chamber was constructed parallel to the existing Moselle SCS Climbing System, used as scaffolding for the 7.80 m
Lock located south of Trier. As the 15 m deep structure high VARIO GT 24 Girder Wall Formwork, guaranteed optimal
required a very high degree of reinforcement, PERI supplied workflows.
prefabricated formwork based on the VARIO GT 24 Girder
Wall Formwork to the large construction site on a just-in-time A PERI project coordinator supported the site management
basis. Specifically adapted to match project requirements as team with the coordination and control of the planning and
well as ensuring that material quantities and scheduling assembly processes. In addition, PERI supervisors briefed
exactly suited the technology of the jobsite. the construction team on the correct handling and assembly
of the various formwork and scaffolding solutions.
Clearly marked elements were manufactured with very small
tolerances and could be immediately allocated to the respec-
tive place of installation. The design of the formwork carriage
for constructing the longitudinal channels was also well
thought-out down to the smallest detail and likewise pre-as-
sembled at the company´s assembly hall using PERI system
components.
267
safety requirements.
“SMCC has worked with PERI on many projects for a long time now and always to
our complete satisfaction. Once again, everything has been completed on time and
with a minimum of effort. We will certainly be relying on PERI for our next projects.”
270
Very little time and space were the defining parameters of the Pengerang Inte-
grated Petroleum Complex in Malaysia PERI UP and VARIO GT 24 wall formwork
showed how working scaffolds, shoring and formwork construction function for
realising slender concrete constructions also during extreme conditions.
The mega project in southern Malaysia is expanding extreme- The already tight time constraints were aggravated by poor
ly quickly – likewise, the shoring and working scaffold of the weather conditions – the facility is situated directly on the
cracking plant for heavy residue materials resulting from the coast. Flexibility was also required during assembly opera-
first petroleum processing steps. The 30 m high reactor tions. Last-minute design changes had to be taken into con-
tower is the highest part of the plant segment. The entire sideration without affecting access to the working areas or
scaffolding system complete with shoring towers, access transfer of loads.
means and working levels was realized with PERI UP Flex.
VARIO GT 24 was used as girder wall formwork. In addition to the strict safety regulations, attention had to be
paid to a number of special requirements arising from the
Fast assembly due to lightweight components and labour-sav- customer’s safety guidelines for oil and gas plants which
ing connection technology with a high load-bearing capacity is could be cost-effectively complied with by the PERI system
one of the characteristics that qualify PERI UP as scaffolding solution.
for projects of this type. Due to numerous work operations
taking place simultaneously in Pengerang and the compact
division of the areas in the industrial complex, there was
hardly any storage area available. Delivery of the enormous
amount of materials was therefore carried out just in time, Contractor
section by section in line with the construction progress. Sumitomo Mitsui Construction Co.,Ltd – SMCC Malaysia Sdn.Bhd.
Field Service
PERI Malaysia, Petaling Jaya
271
“We wanted to have a partner early on in the project with whom we could work
together on the solution. With PERI and the VARIOKIT System, we definitely made
the right choice. It’s definitely the best system and I cannot imagine that we could
have done it better or faster with any other system.”
272
Enormous challenges –
unconventional solution
On the coast of South Africa’s Saldanha Bay, a gigantic crude oil tank farm with
12 underground tanks was realised. Each one has a surface area of 110 × 110 m
and is 17 m high. This large-scale project with a capacity of 13 million barrels, or
2 billion litres of oil, involved moving a total of 1.5 million cubic metres of earth
and pouring 150,000 m³ of concrete. For this extraordinary construction project,
PERI developed project-specific implementation solutions at a very early stage in
collaboration with the project planners.
Contractor
WBHO Construction (Pty) Ltd, Johannesburg,
South Africa
Field Service
PERI South Africa, Cape Town
273
“3D scaffolding planning in conjunction with PERI UP Flex formed the basis of our innovative
scaffolding construction concept in chemical plant engineering. With this concept, we can
plan and erect scaffolding using a cross-trade and forward-looking approach, leading to time
and cost savings, as well as setting new standards regarding work safety.”
“A vision becomes reality: an innovative scaffolding concept was realised through the close
collaboration between PERI and BASF. The combination of scaffolding management, 3D
planning, coordination and execution, in conjunction with PERI UP Flex and BIM, formed a
perfect overall solution for industrial projects. Planning time as well as costs were minimised.”
274
With a capacity of 90,000 t per year, the plant has replaced an older, less-pro-
ductive facility and operates in accordance with the world’s most efficient
production processes. Acetylene is an important intermediate product and is
used as a central source material for around 20 production plants at BASF’s
Ludwigshafen site.
It is not just the new plant work that works with the world’s most modern
technical facilities and processes. During the construction, modern planning
and working methods were also used – this formed the basis for assembly
work operations remaining on schedule. Up to 1,300 people were working at
peak times on the jobsite, which covered an area of around 55,000 m² – the
equivalent of almost eight football pitches – and had an installation height of up
to 90 m.
In order to install the plant technology efficiently and safely, which featured
more than 400 machines and pieces of equipment along with a 90 km long
pipe system and electrical installations, the PERI UP Flex Modular Scaffolding
System was used in the second construction phase. New working levels and
access means were realised for construction and assembly work on an almost
daily basis.
The central project approach was based on the combination of BIM methodolo-
gy for the planning and execution, and high standards of work safety. The jointly
developed, innovative scaffolding concept provided the basis for a comprehen-
sive overall solution for efficient scaffolding construction management, 3D
planning, cross-trade coordination and execution, in order to minimise planning
time and costs. With its 25 cm grid in combination with VARIOKIT system com-
ponents, PERI UP Flex thereby ensured excellent adaptability and occupational
safety at a very high level.
Client
BASF SE, Ludwigshafen, Germany
Field Service
PERI Germany, Competence Centre Industry/
Scaffolding, Weissenhorn; PERI Germany,
Stuttgart
275
276
Complete concept
for a research building
European Spallation Source (ESS) is an important research facility under
construction in the southern Swedish city of Lund. The €1.84 billion research
infrastructure will be the most powerful neutron source in the world.
The ESS facility has a 600 m long linear accelerator where In spite of the complex component geometries complete
protons are accelerated to 96 % of the speed of light. In the with strict tolerance specifications, the entire project could
socalled target station, these protons collide with a target be realised as far as possible with system solutions. For
consisting of the heavy metal tungsten that subsequently example, horizontally positioned brace frames served as a
release neutrons. After this, the neutrons are redirected to platform solution for the TRIO wall formwork for forming the
the surrounding experi-mental stations, enabling materials’ upper sections. The round-shaped building core was con-
properties to be studied and investigated, providing scientific structed using RUNDFLEX circular formwork. The support
data that would not be accessible using other research constructions for forming the massive reinforced concrete
methods. PERI engineers made their expertise available slabs was provided by spatially-designed PERI UP Flex shor-
during the realisation of this major infrastructure project and ing and MULTIPROP shoring towers. A PERI project manager
supported construction activities as early as the planning ensured a smooth logistical construction process in close,
phase as well as throughout the construction process. continuous coordination with the site management team.
On the one hand, this meant that the consistently high safety
requirements were always met. On the other, enormous
amounts of materials had to be made available on a just-in-
time basis. In both cases, the contractor benefited from the
supply of formwork and scaffolding from a single source as Contractor
well as the experience of the PERI engineers. Skanska, Lund, Sweden
Field Service
PERI Sweden, Halmstad
277
278
“By combining the PERI scaffolding with the Integrated Scaffold Program provided
by PERI, we are able to complete our tasks faster and with less site personnel.
This reduced the total man hours of the entire project. This combined system is a
tremendous cost saver in all of our projects.”
Just considering the sheer size of the $5 billion ethane cracker at Chevron
Phillips Chemical, with a targeted production output of 1.5 million tonnes,
is extremely impressive. The complexity of the facility is also highlighted
when looking at the amount of steel that has been installed along with the
continuously winding pipelines. For the construction, it was necessary to
provide workers with secure access means at all points. On the one hand,
this required an enormous amount of scaffolding materials. On the other,
it is important for projects of this size that all relevant information regarding
the scaffolding components is constantly available.
The Integrated Scaffold Program (ISP) from PERI encompasses the 5D PERI
Path software program and facilitates early cost estimates, operational plan-
ning and materials management as well as planning on-site material require-
ments in advance. In Baytown, the software monitored the use of around
750,000 scaffolding components and all related work considerations. The
data allowed a detailed analysis of the working hours to be carried out and
provided enormous transparency. As a result, it was possible to plan in more
detail, reduce labour and logistics costs, and more effectively manage
scaffolding operations.
The PERI UP Flex scaffolding system used was able to accurately follow the
numerous cylindrical reactors and countless pipelines as well as providing
the highest level of safety for all site personnel throughout the entire
construction process. The addition of GT 24 formwork girders facilitated a
cost-efficient solution for realising temporary support for the installation of
the control system.
General Contractor
AMECO (Subsidiary of the Fluor Corporation),
Houston, Texas, USA
Field Service
PERI USA, Houston, Texas
279
280
“Our construction project with simultaneous building shell work and different cross-sectional
dimensions was extremely complex. Due to the intensive cooperation with PERI, we were
able to maintain the tight schedule whilst taking into account all safety requirements.”
The modern kiln plant stands on 4 massive reinforced concrete columns. Their
respective cross-sections: 2.80 m x 2.80 m. Due to the tight construction
schedule, they were realised at the same time. For this, PERI and Züblin jointly
developed project-specific climbing formwork on a system basis. The horizon-
tally mounted SB Brace Frame system combined with standardised compo-
nents taken from the VARIOKIT Engineering Construction Kit formed cantile-
vered climbing platforms. In combination with the TRIO panel formwork, it was
also possible to integrate the vault-like widened areas with variable cross-sec-
tions in the respective concreting section between a height of 11,50 m and 30 m.
The formwork, reinforcement and concreting operations for all vertical and hori-
zontal components were realised at the same time as the columns due to the
PERI UP ensured convenient access to the plat-
extremely short construction schedule. Construction processes at the different form levels of the column climbing formwork
thanks to a stairway access assembly that kept
levels required work steps to be coordinated precisely as space was extremely pace with construction progress. Combined with
limited, and secure access had to be guaranteed at all times. Large, connected VARIOKIT system components, the crane-mova-
ble PERI UP erection scaffold, which is self-sup-
moving units simplified workflows and also reduced crane time requirements porting up to 17 m, allowed safe installation of
the beams at a height of almost 30 m.
to a minimum.
Contractor
Ed. Züblin AG, Ulm/Neu-Ulm Office, Germany
Field Service
PERI Germany, Weissenhorn
281
account.
“The heated Keder roof helped us to reduce snow loads, and hence realise bridging
and load transfer very cost-effectively. A result of the excellent cooperation with
PERI - from the planning phase through to implementation on the jobsite.”
284
Well equipped
through the winter
The PERI UP scaffolding solution adapted perfectly to suit the structural
conditions and static requirements involved in scaffolding and enclosing a
cultural monument. This accelerated the assembly operations and increased
safety levels during use.
The fairytale castle in Bavaria is a world-famous tourist attrac- In this way, significant savings were made in terms of
tion. In 2022, it will be officially nominated as a designated material usage, erection time and effort. Due to the exposed
UNESCO World Heritage Site. Preserving this important position, it is only possible to enter the castle through one
cultural monument requires continuous refurbishment opera- gate. All assembly work had to be carried out in a very con-
tions. To renovate the gatehouse, the oldest building part of fined space to ensure there was no interference with the in-
the castle, PERI UP Flex modular scaffolding was flexibly flux of tourists even during the designated installation period.
adapted to accommodate the difficult geometry. In spite of For example, neither a telescopic handler nor any crane sup-
countless mounting parts, projections and recesses, as well port was used. When executing the roof construction, in par-
as scaffolding a circular tower, system components were ticular, the PERI planning made sure that all assembly steps
used to the greatest possible extent. This resulted in acceler- could be carried out by hand.
ated assembly operations and simultaneously enhanced
safety levels when using the scaffolding.
285
“Together with PERI, we developed a great concept for the extraordinarily challenging
pylon scaffolding. This meant that the carriageway slab did not have to be loaded,
the flow of traffic was not negatively affected and all deadlines could be met –
a really good example of ‘Engineered Solutions’.”
286
47,80
58,10
2,20
5,50
37,50
Two 60 m high red pylons characterize the cable-stayed Pre-assembled VARIOKIT truss girder units delivered on site
bridge which spans the River Meuse. Carrying out their made it possible to realise the over 40 m high freely-support-
refurbishment without causing any major negative impact on ed bridging in only one night. By means of a mobile crane,
the flow of traffic was a major challenge when erecting the the 21 m long units could be quickly lifted into position and
scaffold. The freely movable suspension of the bridge super- then coupled with bolts. Thanks to the system-determined
structure prevented the erection of the appox. 200 t scaffold- simple assembly procedure and the ability to combine the
ing construction on the carriageway slab. Together with two PERI systems, scaffolding erection and dismantling was
Dutch scaffolding specialists, PERI engineers developed the likewise quick and safe as moving operations from the south-
optimum solution whereby combining the PERI UP Flex ern to the northern pylon.
modular scaffolding with the high load-bearing capacity of
the VARIOKIT system.
Construction Kit reliably transferred the high loads into the Scaffolding Contractor
Steigerbouw Van der Panne, Rotterdam,
pylon foundations. The anchoring concept, designed for ac-
Netherlands
commodating high wind loads, could also be cost-effectively
Structural Renovation
implemented with VARIOKIT system components taken from Venko Outdoor, Hoogeveen, Netherlands
the PERI rental park.
Field Service
PERI Netherlands, Schijndel
PERI Group, Weissenhorn, Germany
287
Refurbishment project
with a customised solution
288
The 280 m long and almost 35 m high dam in Kružberk in the The combinability of the PERI systems led to a integrated
east of the Czech Republic is over 60 years old. PERI de- system solution. In conjunction with the PERI application
signed a customised scaffolding solution on the basis of the technology, new approaches and ideas could be implement-
PERI UP Scaffolding System for this extensive refurbishment ed in the scaffolding operations, which were not only planna-
project. Through the combination of standard components ble but also statically verifiable. This saved on time-consum-
taken from the VARIOKIT Engineering Construction Kit and ing adjustment work and simultaneously increased work
GT 24 Formwork Girders, PERI engineers were able to create safety levels.
a site-compliant system-based implementation concept
together with the contractor and scaffolding company.
Field Service
PERI Czech Republic, Jesenice
289
290
“PERI UP scaffolding is extremely flexible, easy to handle and has a high level of
stability. The collaboration with PERI was very good, the pre-planning worked really
well and was easily implemented on the jobsite.”
The 291 m high Olympic Tower has been a landmark of the Bavarian capital
since 1968. For the partial refurbishment of the structure, the PERI UP Flex and
VARIOKIT system combination ensured efficient assembly at dizzy heights.
Both systems are based on a metric 25 cm grid arrangement and could easily be
combined by means of standardised connecting components. VARIOKIT system
components facilitated the assembly of the protective netting, which was to be
installed in advance, and was also used to attach the suspended scaffold on the
underside of the lower platform. In addition to a range of comprehensive safety
measures designed to protect passers-by, the high wind loads posed a major
challenge for the scaffolders.
With the variable PERI UP Flex Modular Scaffolding System, the circular scaffold
on the concrete shaft of the upward-tapering tower tip was easily and quickly
managed, as the use of time-consuming tube and couplers was eliminated –
also for the realisation of guardrails at heights between 192 m and 243. System
ledgers were used here to achieve a force-fitted, stable connections. Circumfer-
ential toeboards and the use of PERI UP bridging boards guaranteed closed
decking levels and maximum safety without any tripping hazards.
In spite of large streams of visitors, the work was completed on time. The well-
thought-out PERI comprehensive solution proved to be particularly advantageous.
Furthermore, the storage of required materials at the PERI rental park ensured
fast availability and a cost-efficient project solution.
Contractor
Schäfer Gerüstbau GmbH, Memmenhausen,
Germany
Field Service
PERI Germany, Weissenhorn
291
All relevant CO2 emissions resulting from the production of the PERI Handbook will be determined in
accordance with the “natureOfffice procedure” and offset via the purchase and binding suspension of
approved climate protection certificates.
In addition, the wood used for the paper production of the PERI Handbook comes from FSC® certified
forests. The FSC® label confirms that the entire processing and supply chain – from the forest and
wholesalers through to the printing stage – is fully certified.