Design of Internediatuflight
Design of Internediatuflight
Slab Type S4
lx 4.5
= =1
ly 4.5
thickness of slab=155 mm
d for short span=131mm
d for long span=4.381 m
loading=same as S 3=12.755 KN
+ve moment co−efficient
ax=0.024
ay=0.024
−ve moment co−efficient for continuous edge
ax 1=0.032
ay 1=0.032
+ve moment along short span∨long span
2 2
Mux∨Muy =ax × Wu ×l x =0.024 ×12.755 × 4.381 =5.875 KNm
−ve moment along short span∨long span
2 2
Mux 1∨Muy 1=ax 1×Wu ×l x =0.032× 12.755× 4.381 =7.834 KNm
415× Ast
7.838× 106=0.87 ×415 × Ast × 123 1− ( 1000 ×123 ×20 )
or Ast = 182 mm2
minimum reinforcement = 186 mm2
so spacing 8 @ 270 C/C
Reinforcement
Along short edge for + ve moment 8 @ 300 C/C
Along long edge for + ve moment 8 @ 300 C/C
Along short continuous edge for - ve moment 8 @ 270 C/C
Along long continuous edge for - ve moment 8 @ 270 C/C
10.189 ×106
D= √ = 61mm So safe.
2.76 x 1000
Reinforcement
10.189x106=0.87 X fy X Ast X 131(1-415Ast/1000x131x20) =47298-7.492ast2=47298
1.36x106=6313Ast-Ast2
Ast=6313+ √ 63132-4x1.36x106=6313-5866/2=224 mm2
Use8 ∅ rod spacing = 1000 X 50.3/224 = 224.6 say 220 mm C/C
BEAM
Flow beam layout (for 1st and 2nd floor)
ACCURATE LAYOUT
Loading
Span AB
Assuming size = 250x425
Self-weight = 0.25 x 0.425 x 25/m = 2.656
Weight of B/wall = 0.69 x 2.985 x .2 x 19 = 7.838
Total = 10.494 kN/m
Factor load = 1.5x10.494kn/m=15.741 kN/m
Load form slab(S1) =18.619
Load form continuous slab =12.767
Total = 47.13 kN/m
SPAN BC
assumed size = 250x425
Self-weight of beam =2.656
Weight of B/wall=0.693x2.985x.2x19=7.861
Total = 10.517 kN/m
Factor load = 1.5 x 10.517 = 15.776 kN/m
Load for slab S2 = 14.973 kN/m
Total = 30.749 kN/m
column: beam = 1: 3.72
D.F AB=3.72/1+1+3.72=0.65
D.F BA=3.72/9.44 = 0.39
D.F BC =0.39
D.F CB =0.65
Joint A B C
Member AB BA BC CB
D.F 0.65 0.39 0.39 0.65
F.E.M - 79.53 + 79.53 -51.89 + 51.89
Distribution + 51.69 -10.78 -10.78 -33.73
C.O -5.39 +25.85 -16.87 -6.39
Distribution +3.50 -3.50 -3.50 +3.50
Net -29.73 +91.40 -83.04 +16.27
29.73+ 91.4
B.M of center of AB = 119.30− =58.75 KNm
2
83.04+16.27
B.M of center of BC = 77.83− =36.31 KNm
2
beam FB/1
The B.M=58.75-ve at A=29.73, -ve B.M at B=91.04
ly=Lo/6xdf+fw
=.7x4500/6+155+250
=525+930+250=1705,say1700
So using 16 ∅ rod, effective depth=425-25-8=392mm
Eff Span 1 c/c 4.500
Eff Span 2 4250+392=4642
So eff span=4500 mm
d = √ 91.04 x 10 6
/2.761x250=363 <392 ok.
Reinforcement (for +ve moment)
MUD=58.75khm
Mulim=0.36xfckxbfxdf(d-0.42Df)
=0.36x20x1700x155(392-0.4x155)
=1.8972x106x370=700.04x106 N.m>MUD
58.75x106=0.87x415xAstx392(1-415Ast/392x20)
Ast=32093-3803/2=421mm2
Use 4 - 12, total area = 4 x 113.1 = 452.4 mm2
For –ve moment = 29.73 KNm at A
At the end the beam will be designed as rectangle beam.
Xumax
=0.48, Xu max=0.48 × 392=188
d
d−0.42× Xu max
) = 105.92 KNm greater than 29.73 hence ok.
Mu lim ¿ 0.36× fck ×b × Xu max ¿
It is under reinforcement.
Ast × fy
29.73 ×106=0.87 × fy× Ast ×d 1− ( b × d × fck )
Ast = 220.5 mm2
Minimum reinforcement = Ast/bd = 0.85/fy
So, Ast = 201 mm2 which less than 220.5 hence ok.
Use 2 - 12 at the end A
Total area = 2 × 113.1 = 226.2 mm2
For –ve moment 91.04 KNm
Mulim as calculated earlier = 105.92 KNm which is greater than 91.04 KNm so, under reinforcement.
So, 91.04 ×10 6=141532× Ast−29.97 As t 2
Ast = 796 mm2
Use 16 rod, No of rod required = 4 nos.
Total area = 4×201 = 804 mm2
1
Shear force = ×4.25 × 47.13=100.15 KN
2
100.15 ×1000
v = =1.022 N/mm2
250 × 392
1000 × Ast 100 × 4 ×113.1
% of steel at support = = =0.462
bd × 0.12 0.12 ×250 ×392
0.212
c for 0.615 % = 0.36 + 0.12× =0.462 N/mm2
0.25
So shear reinforcement is required.
Shear Reinforcement
Vus=Vu−cbd=100150−0.462× 250× 392=54874 N
d 392
Spacing Sv for 8 stirrup = 0.89 × fy × Asv × =0.87 × 415 ×2 ×50.3 × =259 mm
Vus 54874
Spacing should least of
1. 0.75×392 = 294 mm
2. 300 mm.
So use 8 stirrup @ 250 C/C.
FLOOR BEAM FB/3 & FB/4, FB/3, FB/3
Loading GH/KL
Beam AB(FB/3) assume 250x400
Load for slab(S1)= 18.619 KN/m
Load for slab(S2)= 18.627 KN/m
G H I J K Self-weight
I/L=3556 I/L=3556 I/L=5714
K=3.1 K=3.1 K=5.0 4.5 4.5
4.5 4.5 2.8
Member span F.E.M Fa dead +line load +ve mach span shear
A B C D
Joint ABGH BAHG BCHI CBIH CDIJ DCKJ DE
D.F 0.61 0.38 0.38 0.31 0.50 0.50 0.31
F.EM -69.18 +69.03 -63.03 +63.03 -33.01 +33.01 -63.03
Shear reinforced
Shear Fece Vu = 3/2x37.35x4.25=73.4kn
Tve = 79.4x100/250x369=0.861n/m2
Over all centre reinforced at support =100x3x113.1/250x369=0.368
TC =0.36=(0.12/0.25)X0.48=0.42N/M2
Vus = VU- Tcbd=79400-.42x250x369
=40655 N
So specification of 8 ∅ stirrup
=0.87x415XAstxd/Vus=.87X415X2X50.3X369/40655
=330
Use 8 ∅ stirrup (@ 0.75x369)= @ 275 c/c all though
Beam FB13(CD)
Assume size =250x350
D=350-28-6=319m
Bf =lo/b=6=155=bw=2800x.7/6+6x155+250
=327=930+280 = 1450
Effective span = 2.8m
Calculate momont
+Ve moment = 16.24 depth
-Ve moment at C&D=43.76-Vu
So 43.76x106 =0.87fy.AST.D(1-(Ast.fy/bd.fck)
=.87x415x319Ast(1-(Astx415/200x319x20)
=115175 Ast-37.46Ast2
Or 1.186x 106=3075-Ast2
Or Ast=(3075-2188/2)=443.5mm2
Use 4-12 ∅ ,total=4x113.1=452.4mm2
Shear reinforced
S.F Vu= 55.74 kn
Tve=55740/200x319=0.874n/mm2
% of compression reinforced at support=100x2x50.3/200x369=0.158
Tc = 0.28+0.08/0.25x0.008=0.283n/m2
Vus=Vu-Tcbd=55740-0.283x200x319=37685h
Use 8 ∅ stirrup =0.87x415xAstxd/Vus
=307m
0.75x319=239
So use 8 ∅ @230 c/c
BEAM FB/2
Calculated moment
+ve moment at mid span =36.37kn
-ve DO at B =83 kn
-ve DO c =16.27 kn
Bf=lo/12+bw+3df
=0.7x4500/12+250+155=978 m
Eft. Depth d=425-25-16/2=392
Eft span =4.5m
Total moment ,Tu = wx0.728x0.728/2x(4.5-0.25)x1/2
=8.43kn/m
Vu = 4.25x30.749/2=63.34kn
Ve = requirement shear =Vu =1.6T/6=63.34+1.6X8.43/6=65.59KN
Tve = 65.59/250x392=0.669n/m2
Long reinforced
equivalent B.H, val=Mu + Me
when Ve =Tu (1+(.425/.250)=10.02kn/m
Vel=36.37+10.02=46.39 kn/m
Mulim=0.36fckxXumax/d(1-0.42 Xumax/d)bd2
Xumax/d=0.48
=0.36x20x0.48(1-0.42x0.48)250x3922
=106.25kn/m.which is mel=46.39 kn/m
So the section is under reinforced
So 46.39x106=0.87xfyxAst d(1-(fy Ast/bd fck)
=141532Ast – 29.97 Ast2
Or 1.55x106=4722Ast-Ast2
Or Ast=4722-4012/2=355 mm2
Use 2 nos 16 ∅ at bottom
Flow Beam FB/2
Reinforce for –Ve moment at B=83kn
End portion will be designed as rectangular section
Mulim as calculated earlis is more than MuD is 83kn
So the section is under reinforced,
So 83 x 106=0.87fyAst.d(1-Astfy/bdfck)
or,83 x 106 =141532Ast-29.97Ast2
Or,Ast=686mm2
Use 3-16Φ+1-12Φ at the support top
Negative moment at C =16.27Kn/m
Use 2-12Φ at top 0f section at C.
Transverse Reinforce
% steel at support =(100 x 3 x 113.1)/(250 x 3.92)=0.345%
τcfck 0.346%will be from table=0.36+(0.12/0.25) x 0.096=0.41N/mm2
τuc > τc,Transverse shear Reinforce essestial.
Asu =τu,Su/b1d1(0.87f)+VuSu/2.5d1(0.87fy)
Assume 8Ф stirrap b1=250-(25-4) x 2=208
d1=425-(25-4) x 2=383
(Asu x 0.87fy/Su)=(τu/b1d1+Vu/2.5 X d1)=(8.43 x 106/208 x 383)+(63.34 x 1000/383)=106+165=271N/mm
Also Asu =(τve-τc) x bsu/0.87fy
Or,Asu x 0.87fy/su=(τve-τc)b=(0.669-0.41) x 250=65N/mm
We know,(Asu/Su)=271/0.87fy=0.75
Su=(2 x 50.3/0.75)=134N/mm
Hance stirrap 8Ф @130 c/c
This should not excud x1(x1+y1)/4
X1=250-2 x 2=200, y1425-2 x 25=375
(x1+y1)/4=200+375/4=144
Hance 8Ф @130 c/c satisfy the code
Beam FB/5 ,FB/6 ,FB/4 ,FB/5 ,FB/6
K=1
M K=3.72 N=3.72 O=3.34 P=3,72 Q=3.72 R
K=I/L,
For column K = 1146, Column : Beam : beam
For Tee beam, 250 x 425, K = 4265, 1 3.72 3.34
For Tee beam, 250 x 350, K =3828,
DF-MN=(3.72/5.72)=0.65,
MN=(3.72/9.44)=0.39,
NO=0.39,
ON=0.41,
OP=0.41,
PO=0.41,
PQ=0.41,
QR=0.39,
QP=0.39,
RQ=0.65,
Momen Spa F.EMdue todu+lim Stirrap moment S.F
t n
FB/5 MN/QR 4.5 (47.13 X (47.13 X (47.13 X
4.52/12)=79.53 4.52/8)=119.3 4.252/2)=100.15
Point M N O P
D.F MN NM NO QN OP PQ PQ
SHEAR
BEAM FB/16
100 X 3 X 113.1
% of positive reinforcement = = 0.325
250 X 417
0.12
τc = 0.36+ 0.25 X 0.075 = 0.396 N/m2
Calculate moment-
+ve=12.38kn-m
-Ve=45.5kn-m
Reqd. d=
√ 45.55 x 106
2.76 x 250
=257mm
100 X 2 X 113.1
Area of compression reinforcement = = 0.2842
250 X 319
0.12
τc = 0.36+ 0.25 x0.034 = 0.376 N/mm
2
A G B
5.0 4.5
LOADING
AG
Self wt = 0.45x0.25x1.5=4.22 kn/m
Wall = 0.80x0.2x2.96x19x1.5= 13.50
Slab 19.82
37.54 Kn/m
GM
Self Wt = 0.4x0.25x25x1.5 = 3.75
Wall = 0.8x0.2x3.01x19x1.5= 13.73
For Slab = 18.63
Total= 36.11 Kn/m
MEMBER SPAN F.E,M. SPAN S.F.
AG 5.0 (37.54 X 52)/12 (37.54 X 52)/8 (37.54 X 4.75)/2
=78.2 =117.31 =89.16
Loading
BH (250 X 450) FB/9
Self-weight = 0.25 X 0.45 X 25 X 1.5 = 4.22 KN/m
Wall = 1 X .10 X 2.96 X 19 X 1.5 = 8.44 KN/m
Load for slab – S1 19.42 KN/m
S2 15.939 KN/m
Total 48.42 KN/m
HN (250 X 400) FB/10
Self-weight = 0.25 X 0.40 X 25 X 1.5 = 3.75 KN/m
Wall = 1 X .10 X 3.01 X 19 X 1.5 = 8.58 KN/m
Load for slab – S1 18.63 KN/m
S2 18.63 KN/m
Total 49.59 KN/m
Member Span F.E.M Span moment S.F
FB 9 BH 5 48.42× 52 48.42× 52 48.42× 4.75
=100.88 =151.31 =115
12 8 2
FB 10 HN 4.5 48.42× 4.52 48.42× 4.52 48.42× 4.25
=83.68 =125.52 =105.38
12 8 2
Joint B H N
Member BH HB HN NH
D.F 0.7 0.42 0.39 0.69
F.E.M - 100.88 + 100.88 - 83.68 + 83.68
Distribution 70.6 - 7.2 6.7 57.7
CO 3.6 35.3 28.85 3.35
Distribution 18 2.58 2.52 2.31
32.08 126.4 121.75 24.94
√
6
123.38× 10
d= =422< 422
2.761 ×250
6
+ve moment=72.39 ×10
Mulim=0.36 × fck × bf × Df × ( d−0.42 Df )
¿ 0.36 ×20 ×1700 ×155 × ( 442−0.42×155 )=713.09 KN/m > 72.39 KN/m
Ast ×415
(
so ,72.39 ×10 6=0.87 × 415 × Ast ×d 1− )
bf × d × fck
2
Or Ast = 460 mm
Use 2 – 16 + 1 – 12 at
Use – 5 – 16 at top
Negative moment 34.53 KNm at B
So 34.53× 106=15958 Ast−29.97 As t 2 or Ast = 226 mm2
Minimum reinforcement Ast/bd = 0.85/fy or Ast = 226 mm2
Use – 2 – 12 at top
Shear force, Vu = ½ X 48.42 X 4.75 = 115 kN
ve = (115 X 1000)/(250 X 442) = 1.04
100 X ( 2 X 201+1 X 43.1 )
% of steel = =0.47
250 X 442
c = 0.36 +0.12 X .22/.25 = 0.466
Vus = Vu - cbd = 115000 – 0.466 X 250 X 442 = 63507
442
Spacing of 8 = .87 × fy ×2 ×50.3 × =252 mm
63507
Use 8 @ 250 C/C all through.
BEAM SLAB
THICKNESS =155
D= 155-24=131 m
Lu/ln=5/4=1.11
Effective span = 4.381 m
Factored load = 9.86
Mid span coefficientnegative coefficient of corner edge
ax = .0.0414 ax = 0.0514
ay = 0.0357 ay = 0.047
+ve moment
Mux=0.44x9.86x4.3812=8.33
Muy= 0.037x9.86x4.3812
-ve moment
At corner edge of span Mux1 = 0.053x9.86x4.3812=10.03
Muy1=8.9
Positive reinforcement short span
Ast= 0.5fck/f4 x [1-√(4.6x18.33x106)/(fck x b x d2)]bd
= 10/415(1-.94)bd
= 189 m2
Spacing of 8 mm bar = 1000x50.3 =266 m2
Reinforcement along edge
Ast = 0.5fck/f4 x [1-√(4.6x18.33x106)/(fck x b x d2)]bd
= 10/415(1-0.946)1000x 123 = 18
-ve moment along short edge
Ast = 0.5fck/f4 x [1-√(4.6x18.33x106)/(fck x b x d2)]bd
=10/415(1-0.931)1000x131
=207 m2
Spacing = 1000x50.3/410 @ 230c/c
Shear stress at long edge= 1/3x9.86x4.381x(7/2+r) = 14.40 kn
Shear stress at long edge = 9.86 x4.381x(7/2+r) = 15.33
Slab RS2
Lu/ln = 1.11 d= 131 effective span = 4.381
+ Positive moment
Ax = 0.044
Ay = 0.037
-negative moment
Ax1 = 0.053
Ay1= 0.043
Mux = 10.03
Mu y= 7.002
Reinforcement same as R51
Negative rl
Same as RS1
Shear force at short edge = 14.40
Shear force at long edge 15.33
SLAB RS3
R = 1.11, d = 131 and 12.3
Effective span = 4.381
Positive moment
Ax = 0.049
Ay = 0.037
Negative moment at corner edge
Ax1 = 0.053
Ay1= 0.043
Same as RS2
S.F. at long and short edge = 14.40
SLAB RS4
Ly/lx = 1.11, d = 131 and 123
Effective span = 4.381
Positive moment
Az = 0.032
Ay = 0.028
Negative moment
Ax1 = 0.043
Ay1 = 0.037
Positive moment
Mux = 0.032x9.86x4.3812= 6.06
Muy = 0.028x9.86x4.3812 = 5.30
Negative moment
Mux1 = 0.043x9.86x4.3812 = 8.14
Muy1 = 0.037x9.86x4.3812= 27.00
Positive moment along short edge
0.5fck/fy[1-√(4.6x6.06x106/20x1000x1312)]1000x131 = 12
Spacing = 1000x503/253 = 198
Spacing of 8φ 270 c/c
Positive moment along long edge
8 φ @ 270 c/c
Negative moment along short edge 10/415[1-√(1-4.6x8.14x106/20x1000x1282)]1000x128 = 185 m2
Therefore 8φ @ 270c/c
Negative along long edge
S F at 8φ @ 270c/c at short edge = 1/3x9.86x4.381 = 14.40
Long edge = 9.86x4.381x1/3 = 14.40
Slab RS5
Thickness 120 th
Loading ,
Self load = 4.50
Lintel =2.25
Flinch = 1.80
Total = 8.55 kn/m
Ly/lx = 4.5/2.8 = 1.6
D = 120-24 = 96
Span = 2.8
Therefore = 550+96 = 2646
Ax = 0.046
Ay = 0.028
Ax1 = 0.060
Ay1 = 0.037
MUX =0.046x8.55x2.462 =2.754
MUy=0.028x8.55x2.6462=1.68
MUX1=0.060x8.55x2.6462=3.59
MUy1=10/415[1-√1-4.6*2.754.106/1000*20*962]1000*96
Positive ast =10/415[1-√(1-4.6x2.7x106)/1000x20x96x96] x 1000x96= 81m2
minimum reinforcement =0.12/100*120*1000=144 m2
spacing = 1000x50.3/144=349
3x 96=288m
….89@280CLC
…............10/415[1-√1-4.6*3.55*106/1000*20*962]96*1000
=10/415(1-.954).96*1000=106
Use 8φ @@280C/C
Sf at shaft edge =⅓x8.55x2.646=7.54
At long edge =8.55x2.646 1.6/3.6=10.05
Spacing reinforcement
Ax= 0.094
Ay 0.056
Mux = 0.094x1.8x2.642 = 5.13
Muy = 0.056x7.8x2.6462 = 3.06
Shear at edge
Ash = 10/415[1-√1-(4.6x5.13x1010/1000x20x562]1000x96
10/415(1-0.934)1000x96 = 153 m2
Minimum reinforcement = 144m2
Spacing at 8φ = 1000 x 50.3/153 = 328 m
Use 8 φ @ 270 c/c
Along long edge = 10/415[1-√1-(4.6x3.06x102/1000x20x882)]1000 x 88 = 190
Use 8 φ @ 280 c/c
Roof Beam RB / 11 ( 1 Beam) 450x250
Loading,
Self = 0.450x0.25x25x1.5 = 4.22
CANTILEVER OF RB12(I0)
-Ve moment at I – 77.97
Xumax = 0.48X367 = 176.16mm
Mulin = = 0.36X20X250X176.16(367-0.42X176.16)c
= 0.317X293 = 92.881 > 77.97
77.97X106=132505Ast – 29.97
Or, 2.60X106=4421-Ast2
3 – 16 @+1 – 12@
- Ve moment at 0 – 13.45
Use= 2-12@
Vu = (64510/250X367)=0.703
Steel = (100X2X113.1/250X367)=0.25
Tc = 0.36N/mm2
0.75X367 = 275.25mm
So, 8 - @270c-c.
3.75 Ri = 40.29
FB12(I0)
Loading ,
Self wt =( 0.4X0.25X1.5X2.5) = 3.75
Slab S4 = 18.63
S5= 7.33
Total =(3.75+18.63+7.33)= 29.71n/mm.
F.E.M ON BOTH END = (29.71x4.52)/2 = 50.14 kn
S.F at both end = (29.71X4.25)/2 = 63.13kn.
C I O (29.71x4.252)/8
OI = 67.08N
CI IC IO
96.42
26.98 16.86
C I O
84.15
67.08-50.5 = 16.58
Span 78.03
- ve span I = 96.42
D = 417 1000
H=5m
155
450 750
250
Ve = 78.3
Tu = (15.94X0.752/2X5X1/2) = 11.20mm
Ve = 81.19+1.6X11.2/6 = 84.18mm
Lontudional reinforcement
Mu =Mo + Mi
Mulin= 120.1>96.42
96.42X106=150558-29.97Ast2
Use 4- 16ᵩ.
Use – 4-16ᵩ
-Ve= 26.98 at C
At use 2-12ᵩ.
Tc = 0.56+(0.66/0.25)X0.075 = 0.578n/mm
It should moment ,
130 c-c.
Ve = 16.58
- Ve at I = -84.15
Do = 16.86
Mulim = 485.3>16.58
250
-ve at I = 84.15
Use 3 – 16 - ᵩ + 12 ᵩ
-Ve span at O = -16.86
18.86X106 = 132505 – 29.97 Ast
Or, 0.63X106 = 4421 – Ast2
Ast = (4421 – 4127)/2 = 147 m2
Reinforcement = 188
S0 use 2 – 12 ᵩ
Sf Vu = ½ X 29.27X4.25 = 63.13 , ῖve = (63.130/250X367) = 0.686
So steel = 0.25 , ῖ c= 0.36
Vus = vu - ῖ c bd = 63130- 0.36X250X367=30100
Stair at 8 ᵩ stirrup=(0.87X415X2X50.3X367)/30100 = 443m
0.75X367 = 275
So use 8 ᵩ @ 270 c-c.
BEAM IB/15 AT CENTRE OF 2800
LOADING FOR 6-6 (250x380)
TOTAL LOAD = 26.66kn/m d=( 380-33)=347
B.M = 67.48 kn/m
Mulin = 0.36fck xumax /d (1-0.42Xxumax/d) bd2
= 0.36X20X0.48(1-0.42X0.48)230X319 2
=3.45X0.789X240X347 = 0.22 X 3472 = 76.34 kn>65.81
So , 67.48 X106 = 0.87fy XAst X347(1-415Ast/230X347)
Or , 2.07 X106 = 3847 – Ast2
Ast = 3847 – 2553 = 700m2
Use - 16 ᵩ- + 1- 12 ᵩ.
S.I @VU
= (26.66x11.25)/2 = 56.65
ῖve = (56650/230X347)=0.710
= (100X713)/230X347 = 0.893 > ῖve
So , reinforcement 8 ᵩ @ 0.75X380 = 280 c-c.
ROOF SLAB STAIR (120 WIDTH) 5/2.8 = 1.785 , D = 96
Load /m = 7.80 kn/m
ax = 0.10 + (0.007/0.25)X0.035 = 0.10 , span = 2.646
ay = 0.056
Mux = 0.1 X 7.8X 2.6462 = 5.460
Muy = 0.056X7.8X2.6462 = 0.058
Ast = (10/415) 1- √❑ 1-(4.5X5.46X106)/1000X20X966 1000X96
10/415(1-0.930)1000X96 = 162m2
Stirrup 8 ᵩ = 1000X50.3/162 =310
Use 8 ᵩ @ 300c-c on both side.
S.F
At shafe load = 1/3 X7.80X2.646=6.88kn
At load shear = 7.80X2.646X1.785/3.785 = 9.73kn.
G I J
H
RB9 RB12
RB7
A RB1 B RB2 C D
RB1\RB2
A B C
400X250 400X250
4.5 4.5
1146
400X25(4.9) 3554 3.1 D.F-A.B=3.1\5.1=.61
400X250(4.5)3556 3.1 BA=3.1\8.2=1.38
BC=3.1\8.2=.39
CB=3.1\5.1=.61
JOINT A B C
MEMBER AB BA BC CB
D.F 0.61 .38 .38 .61
F.E.M - 48.5 + 48.5 - 48.5 + 48.5
Distribution + 29.6 0 0 - 29.6
C.O 0 +14.8 - 14.8 0
Distribution 0 0
18.9 63.3 63.3 18.9
RB1
+ ve moment = 31.65
- Ve moment = -18.9 at A
-63.3 at B
Bf = L0/12+3x155+bw=263+465+250
d=400-25-6=369Tu =14.4x72/2x4x5x1/]2=7.94
Ve=55.3+1.6x7.94/6=57.42
4xe=57420/250x369=0.622
Mu+me Me=tu1+D16/1.7=7.94X11=9.47
=31.65+947=41.12
Mulen=36x20x0.48(1-42x0.48)250x3692
=0.255x369=7984+94.46>41.12
So41.12x106=0.87x415xASLx369(1-415ASL/250X369X20)
=133227asl-29.97ASL2
Asv=4445-3778/2=334m2
W=3-12w
- ve moment =63.3 at B
2.112X106=4445-3363/2=541M2
Use = 3-16
- ve moment at B18.9atA
Use = 2-12
SO % Of Reinforce =100x3x113.1/250x369=0.368
C=0.36+0.12/0.25X118=0.4187
(ASvX0.87fy)/Sv = tu/b1d1+vu/2.5=7.94/88x338+55.3/2.5x338
125+65=190
At (Asv X .87fy )/sv = (v - c)x6=(0.622-417)x250=51ASU:SX=2x50.3x87fy/190=191
(184+334)\4=130
Use 8 @ 130 C/C
Beam RB2 load size 400x250
+ ve moment = 31.65
-ve moment at B = 63.3
-ve moment at C = 18.9
So at RB1
Fa +ve moment – use 3 – 12
Fa –ve moment at B – use 3 - 16
Fa –ve moment at C – use 2 - 12
Vu=55.3kn
Use 8 @130c/c
BEAM RB3\RB4\RB13
45 4.5 2.8
G H I J K L
250X400 250X400 200X300
K for =1146 DF for QH =3.1\5.1=0.61 HQ=3.1\8.2=0.38
250x400=3556 3.1 HI =3.1\8.2 =0.38 IH=3.1\4.8=0.46
200x300=1929 1.7 IV=1.7\7.8=0.25 JI =1.7\7.8=0.25
Q H I J
QH HQ HI IH IJ JI JK
D.F 0.61 0.38 0.38 0.46 0.25 0.25 0.46 0.38
F.E.M -54.3 +54.3 -54.3 +54.3 -10.65 +10.65 -54.3 +54.3
Dish +33.12 0 0 -20.08 -10.96 +10.96 +20.08 0
CO 0 +16.56 -10.04 0 +5.45 -5.45 0
D 0 -2.18 -2.18 -2.51 -1.36 +1.36 +2.51
-21.18 68.38 66.82 31.71 17.46 17.46 43.65
300 520
200
TU=7.54X0.52/2.8XH=1.43 d √17.46X106 /2.76X200=1748<269
Vu=20.98L=20.38
Ve=1.6x1.43/20.38
4u=21.16x1000/200x319=0.379
Mee=m=49+2.12=3.59 mi=tu(1+D/6/1.7=1.43x1.47=2.10mm
Mu iieim=36x20x0.48(1-0.42x48)200x3192
=0.36x20x0.48x0.798x200x3192
=0.176x319=56.144len
So 5.59x106=0.87x415xastx3191(1-ASLx415/200x315x20)209
=115175-37.46ASL20.246X106=30.75-2518/2593=7.5M2=0.0958
0.87XBD/FY=110M2
SO Use -2-12
AT18/17.46X106=17.46=2593-2285/2=194
UM-2-12h
100(2x113.1)/200x269=0.420>Ťue
So HIT Sher ri
ASU/6.5U=0.4/0.87
A SU=asux0.87fyx/
W 8h;su=2x50.3x0.87x415/0.44x200=4154
Wu(0.75x0.300)@225c/c
Beam RB5/RB6/RB14
250X400
Member F.E4 Shammel Shea
FONT M N O P Q
MEMBER MN NM NO ON OP PO PQ QP
DF 0.61 0.38 0.38 0.46 0.25 0.25 0.46 0.38
FEM -39.24 +39.24 -39.29 +39.29 -9.75 +9.75 -39.29 -39.29
+39.29
DIST +23.94 0 0 -13.58 -7.38 +7.38 +13.58
0 0
CO 0 +11.97 -6.79 0 +3.69 -3.69 0
DIST 0 -1.83 -1.83 -1.70 -0.92 +0.92 +1.72
Joint A Q M
Member AQ QA QM MQ
JOINT B H N
member BH HB HN NH
BeamRB9(BH)450X400
+ve moment=47.80
-ve moment at B=30.43
-ve moment at H=83.23
Bf=l0/6+6+155+bw=583+930+250
=1700
d = 400-33=367mm, span=5.00m
d=√{(83.23x106)/(2.761x250}=347mm < 367mm
Mulim= 0.36x20x1700Df(d-.42xdf)
=.36x20x1700x155 (367-.42x155)
=1.90x302=573.8>47.80
Therefore,
47.80x106=.87x1415xAstx367(1-(Astx415/1700x367x20))
=132505Ast-4.4Ast2
Or, 1.595x106=4421-1 Ast
Ast=(4421-3600)/2=365mm2
Use=2 nos 16mm dia rod
Negative moment at A-83.23 kN-m
Xumax/d=.48, Xumax=.48x367=176.16mm
Malim=.36x20x250x176.16x(367-.4x176.16)
=.317x296.54=94>83.23 kN-m
Therefore, 83.23x106=.87x415xAstx367(1-(Astx415/250x367x20))
=132505Ast-29.87Ast2
Or, 2.78x106=(4421-2903)/2=759mm2
Use-4-16mm dia rod
Hogging moment at B=30.49kN-m
(30.43/29.97)x106=4421-1
1.015x106x106=4421-1
Ast=(4421-3936)/2=243mm2
Use-3-12mm dia rod
Shear reinforcement,
Vu=78.52kN
Tve=79520/(250X367)=0.867
percentage of steel=(100X2X202)/(250X367)=0.44%
TC=.36X.12/.25X0.19=0.45N/mm2
Vus=Vu-Tcbd=79520-.45x250x367
= 38233N
Spacing of stirrups=.87x415x2x50.3x367/38239 =349mm
Use(.75x367=275)8mm dia rod @ 270m
Beam RB10 (450X250) HN
+ve moment = 32.28 kN-m
-ve moment at H =78.22 kN-m
- ve moment at N=19.62 kN-m
d=400-33=367mm
Span =4.5m
d=√(78.22x106)/(2.761x250)=337mm<367mm
moment=32.28kN-m
Mulim=573kN-m>32.28 kN-m
Therefore, (32.28x106)/29.97=4421-1Ast
Or, Ast=(4421-3904)/2=259mm2
Use 3nos 12mm dia rod
-ve moment at H=78.22kN-m
Xumax=176.16mm
Therefore, Ast=(4421-3018)/2=702mm2
Use 4 nos 16mm dia rod
-ve moment at N=19.62 kN-m
655x106=4421-1
Ast=(4421-4115)/2=153mm2
Main reinforcement=188mm2
So, use 2 nos 12mm dia rod
Shear reinforce-
Vu=68170 N
Tve=68170/(250x367)=0.743 N/mm2
Percentage of steel=0.44%
Tc=0.45 N/mm2
Vus=Vu- Tcbd=68170-0.45x250x367
=26883 N
Spacing of stirrups=(0.87x415x2x50.3x367)/26883 = 296mm
Use 8 mm dia rod @ 270mm c/c
Beam RB11 & RB12(CIO)
Col=1146 DF=CI=4/6=0.67 IO=2.1/8.1=0.26
CI=250x450=4556 IC=4/8.1=0.49 OI=2.1/4.1=0.51
IO=250x350=2382
1:4:2.1
Member F.E.M. Span moment Shear
RB11-CI 63.13 at C (24.15x52)/8 (24.15x4.75)/2
88.76 at I =75.47 =57.36
+ (54.68x1.25)/5
(54.68x3.75x1.25)/5 =13.69
=51.26 Total=71.03 at C
Total=126.73 57.36+41.01=98.87
At I
BB12-IO (27.73x4.52)/12 (27.73x4.52)/8=70.19 (27.73x4.25)/2
=46.80 =58.93
Joint C I O
member CI IC IO OI
DF 0.67 0.49 0.26 0.51
F.E.M. -63.13 +88.76 -46.80 +46.80
Dist +42.30 -20.56 -10.91 -23.86
C.O. -10.28 -21.15 -11.93 -5.45
Dist +6.89 +16.21 +8.60 +2.72