0% found this document useful (0 votes)
182 views8 pages

USULAN MATRIX RAB ME Fasilitas Gedung Eks AOC JATSC 23 MEI 2018 PDF

This document provides an estimated budget plan for an HVAC installation project at the Soekarno Hatta airport. It lists the proposed indoor and outdoor AC units for the first and second floors, providing specifications and estimated unit costs. The total estimated cost for the first floor is Rp437,488,370 and for the second floor is Rp96,284,370, with an overall subtotal of Rp533,772,740. Minor changes are proposed to upgrade some units with higher capacity and updated models while keeping the overall budget similar.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
182 views8 pages

USULAN MATRIX RAB ME Fasilitas Gedung Eks AOC JATSC 23 MEI 2018 PDF

This document provides an estimated budget plan for an HVAC installation project at the Soekarno Hatta airport. It lists the proposed indoor and outdoor AC units for the first and second floors, providing specifications and estimated unit costs. The total estimated cost for the first floor is Rp437,488,370 and for the second floor is Rp96,284,370, with an overall subtotal of Rp533,772,740. Minor changes are proposed to upgrade some units with higher capacity and updated models while keeping the overall budget similar.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

estimator3 Page 1 23/05/2018

MEP.01
RENCANA ANGGARAN BIAYA
PROYEK : PENGADAAN DAN PEMASANGAN FASILITAS PENDUKUNG GEDUNG EKS AOC JATSC
DI SOEKARNO HATTA
PEKERJAAN : PEKERJAAN TATA UDARA - (AC VRF/VRV SYSTEM)
LOKASI : KANTOR CABANG JATSC
Data Material yang diusulkan untuk di CCO Harga Estimasi Usulan Perubahan
Harga Kontrak
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
No. Uraian Pekerjaan (Kontrak) Volume Satuan No. Uraian Pekerjaan (Kontrak) Volume Satuan Keterangan
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 1 2 3 4 5 6 7

A. LANTAI 1 A.
1. Pengadaan Mesin AC VRF/VRV SYSTEM 1. AC Indoor Merk Daikin (VRF/VRV)
a. Wall Mounted type 3.00 unit 11,591,310 34,773,930 Wall Mounted type FXAQ 25PVE 3.00 unit 11,591,310 34,773,930 Sudah Sesuai
- Kapasitas Pendingin : 9.600 Btu/h - Kapasitas Pendingin: 9.600 Btu/h
- Air Flow : 277 CFM - Air Flow : 282 CFM
- Accessories : Wireless Remote Controller - Accessories : Wireless Remote Controller
b. Wall Mounted type 5.00 unit 11,886,350 59,431,750 Wall Mounted type FXAG 32PVE 5.00 unit 12,237,456 61,187,280
- Kapasitas Pendingin : 12.300 Btu/h - Kapasitas Pendingin: 12.300 Btu/h
- Air Flow : 355 CFM - Air Flow : 300 CFM
- Accessories : Wireless Remote Controller - Accessories : Wireless Remote Controller
c. Wall Mounted type 4.00 unit 12,378,070 49,512,280 Wall Mounted type FXAG 40PVE 4.00 unit 12,965,876 51,863,504
- Kapasitas Pendingin : 15.000 Btu/h - Kapasitas Pendingin: 15.000 Btu/h
- Air Flow : 433 CFM - Air Flow : 424 CFM
- Accessories : Wireless Remote Controller - Accessories : Wireless Remote Controller
d. Wall Mounted type 11.00 unit 13,754,910 151,304,010 Wall Mounted type FXAG 50PVE 11.00 unit 15,005,452 165,059,972
- Kapasitas Pendingin : 19.000 Btu/h - Kapasitas Pendingin: 19.100 Btu/h
- Air Flow : 549 CFM - Air Flow : 530 CFM
- Accessories : Wireless Remote Controller - Accessories : Wireless Remote Controller
e. Wall Mounted type 10.00 unit 14,246,640 142,466,400 Wall Mounted type FXAG 63PVE 10.00 unit 17,586,140 175,861,400 disesuaikan dengan instalasi
- Kapasitas Pendingin : 25.000 Btu/h - Kapasitas Pendingin: 24.200 Btu/h Tahap I dan type outdoor
- Air Flow : 722 CFM - Air Flow : 671 CFM di tahap 1
- Accessories : Wireless Remote Controller - Accessories : Wireless Remote Controller

SUB TOTAL A 437,488,370 SUB TOTAL A 488,746,086

B. LANTAI 2 B.
1. Pengadaan Mesin AC VRF/VRV SYSTEM 1.
a. Wall Mounted type 3.00 unit 11,591,310 34,773,930 Wall Mounted type FXAQ 25PVE 3.00 unit 11,591,310 34,773,930 Sudah Sesuai
- Kapasitas Pendingin : 9.600 Btu/h - Kapasitas Pendingin: 9.600 Btu/h
- Air Flow : 277 CFM - Air Flow : 282 CFM
- Accessories : Wireless Remote Controller - Accessories : Wireless Remote Controller
b. Wall Mounted type 1.00 unit 11,886,350 11,886,350 Wall Mounted type FXAQ 32PVE 1.00 unit 12,237,456 12,237,456
- Kapasitas Pendingin : 12.300 Btu/h - Kapasitas Pendingin: 12.300 Btu/h
- Air Flow : 355 CFM - Air Flow : 300 CFM
- Accessories : Wireless Remote Controller - Accessories : Wireless Remote Controller
c. Wall Mounted type 1.00 unit 11,296,270 11,296,270 Wall Mounted type FXAQ 20PVE 1.00 unit 12,091,772 12,091,772
- Kapasitas Pendingin : 7.500 Btu/h - Kapasitas Pendingin: 7.900 Btu/h
- Air Flow : 433 CFM - Air Flow : 424 CFM
- Accessories : Wireless Remote Controller - Accessories : Wireless Remote Controller
d. Wall Mounted type 7.00 unit 13,754,910 96,284,370 Wall Mounted type FXAQ 50PVE 7.00 unit 15,005,452 105,038,164
- Kapasitas Pendingin : 19.000 Btu/h - Kapasitas Pendingin: 19.100 Btu/h
- Air Flow : 549 CFM - Air Flow : 530 CFM
- Accessories : Wireless Remote Controller - Accessories : Wireless Remote Controller
e. Wall Mounted type 20.00 unit 14,246,640 284,932,800 Wall Mounted type FXAQ 63PVE 20.00 unit 17,586,140 351,722,800
- Kapasitas Pendingin : 25.000 Btu/h - Kapasitas Pendingin: 24.200 Btu/h
- Air Flow : 722 CFM - Air Flow : 671 CFM
- Accessories : Wireless Remote Controller - Accessories : Wireless Remote Controller
f. Wall Mounted type 1.00 unit 27,509,820 27,509,820 Wall Mounted type FXAQ 50PVE 2.00 unit 15,005,452 30,010,904 disesuaikan dengan instalasi
- Kapasitas Pendingin : 36.000 Btu/h - Kapasitas Pendingin: 19.100 Btu/h Tahap I dan type outdoor
- Air Flow : 1038 CFM - Air Flow : 530 CFM di tahap 1
- Accessories : Wireless Remote Controller - Accessories : Wireless Remote Controller

SUB TOTAL B 466,683,540 SUB TOTAL B 545,875,026

A. LANTAI 1 A.
B. LANTAI 2 - B.
JUMLAH 904,171,910 1,034,621,112 13%

Halaman 1 dari 8 TATA UDARA


estimator3 Page 2 23/05/2018

RENCANA ANGGARAN BIAYA


PROYEK : PENGADAAN DAN PEMASANGAN FASILITAS PENDUKUNG GEDUNG EKS AOC JATSC
DI SOEKARNO HATTA
PEKERJAAN : PEKERJAAN PEMADAM KEBAKARAN
LOKASI : KANTOR CABANG JATSC
Data Material yang diusulkan untuk di CCO Harga Estimasi Usulan Perubahan
Harga Kontrak
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
No. Jenis Pekerjaan Volume Satuan No. Jenis Pekerjaan Volume Satuan Keterangan
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 1 2 3 4 5 6 7

A. PEMADAM API RINGAN (PAR) A. PEMADAM API RINGAN (PAR)


1. Lantai 1 Dan Lantai 2 1. Lantai 1 Dan Lantai 2
a. Portable Fire Extinguisher (PAR),Merk Naffco 14.00 unit 1,550,770 21,710,780.00 a. Portable Fire Extinguisher (PAR),Merk CHUBB 14.00 unit 1,515,000 21,210,000.00
- Kapasitas : 5 kg - Kapasitas : 6 kg
- Class : Dry Chemical (Powder) - C - Class : Dry Chemical (Powder) - C
- Lama Pancaran Max. : 14 detik - Lama Pancaran Max. : 14 detik
- Pancaran Max. : 3 - 6 meter - Pancaran Max. : 3 - 6 meter
- Tekanan Max. : 15 - 20 bar - Tekanan Max. : 15 - 20 bar
- Ukuran : Dia. 118 x 465 - Ukuran : Dia. 118 x 465
b. Box PAR ukuran : 800 x 500 x 250 14.00 unit 513,500 7,189,000.00 b. Box PAR ukuran : 800 x 500 x 250 14.00 unit Rp 513,500 7,189,000.00

2. Portable Fire Extinguisher (Ruang Pompa) Pakai Roda, Merk Naffco 1.00 bh 14,172,600 14,172,600.00 2. Portable Fire Extinguisher (Ruang Pompa) Pakai Roda, Merk CHUBB 1.00 bh 16,100,000 16,100,000.00
- Kapasitas : 25 kg - Kapasitas : 25 kg
- Class : Dry Chemical (Powder) - C - Class : Dry Chemical (Powder) - C
- Lama Pancaran Max. : 35 detik - Lama Pancaran Max. : 35 detik
- Pancaran Max. : 5 - 9 meter - Pancaran Max. : 5 - 9 meter
- Tekanan Max. : 12 - 15 bar - Tekanan Max. : 12 - 15 bar
- Ukuran : Dia. 240 x 660 - Ukuran : Dia. 240 x 660

SUB TOTAL A 43,072,380.00 SUB TOTAL A 44,499,000.00


-
B. TESTING AND COMMISIONING
Pelaksanaan ini, meliputi : B. TESTING AND COMMISIONING
1. Pembersihan / Pembilasan Pemipaan Hydrant Pelaksanaan ini, meliputi :
a. Pembelian air bersih 100.00 m3 15,000 1,500,000 1. Pembersihan / Pembilasan Pemipaan Hydrant
b. Penyewaan mesin pompa tekanan, > 13,8 Bar 1.00 unit 2,567,500 2,567,500 a. Pembelian air bersih 100.00 m3 15,000 1,500,000
c. Pemakaian daya listrik 45.00 kWh 1,500 67,500 b. Penyewaan mesin pompa tekanan, > 13,8 Bar 1.00 unit 2,567,500 2,567,500
d. Perbaikan kebocoran dan finishing 1.00 lot Sdh msk Ditawarkan c. Pemakaian daya listrik 45.00 kWh 1,500 67,500
2. Tekanan Air Pada Pemipaan Hydrant d. Perbaikan kebocoran dan finishing 1.00 lot Sdh msk Ditawarkan
a. Pembelian air bersih 100.00 m3 15,000 1,500,000 2. Tekanan Air Pada Pemipaan Hydrant
b. Penyewaan mesin pompa tekanan, > 13,8 Bar 1.00 unit 2,567,500 2,567,500 a. Pembelian air bersih 100.00 m3 15,000 1,500,000
c. Pemakaian daya listrik 45.00 kWh 1,500 67,500 b. Penyewaan mesin pompa tekanan, > 13,8 Bar 1.00 unit 2,567,500 2,567,500
d. Perbaikan kebocoran dan finishing 1.00 lot Sdh msk Ditawarkan c. Pemakaian daya listrik 45.00 kWh 1,500 67,500
3. Pengoperasian / Running Sistem Hydrant d. Perbaikan kebocoran dan finishing 1.00 lot Sdh msk Ditawarkan
a. Pembelian air bersih 100.00 m3 15,000 1,500,000 3. Pengoperasian / Running Sistem Hydrant
b. Pembelian bahan bakar solar 500.00 liter 10,000 5,000,000 a. Pembelian air bersih 100.00 m3 15,000 1,500,000
c. Pemakaian daya listrik 45.00 kWh 1,500 67,500 b. Pembelian bahan bakar solar 500.00 liter 10,000 5,000,000
c. Pemakaian daya listrik 45.00 kWh 1,500 67,500

SUB TOTAL B 14,837,500 SUB TOTAL B 14,837,500

A. PEMADAM API RINGAN (PAR) 43,072,380 A. PEMADAM API RINGAN (PAR) 44,499,000
B. TESTING AND COMMISSIONING 14,837,500 B. TESTING AND COMMISSIONING 14,837,500
JUMLAH 57,909,880 JUMLAH 59,336,500

Halaman 2 dari 8 PEMADAM KEBAKARAN


estimator3 Page 3 23/05/2018

MEP.04
RENCANA ANGGARAN BIAYA
PROYEK : PENGADAAN DAN PEMASANGAN FASILITAS PENDUKUNG GEDUNG EKS AOC JATSC
DI SOEKARNO HATTA
PEKERJAAN : PEKERJAAN FIRE ALARM (PENDETEKSI DINI KEBAKARAN)
LOKASI : KANTOR CABANG JATSC
Data Material yang diusulkan untuk di CCO Harga Estimasi Usulan Perubahan
Harga Kontrak
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
No. Uraian Pekerjaan (Kontrak) Volume Satuan No. Jenis Pekerjaan Volume Satuan Keterangan
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 1 2 3 4 5 6 7

A. PEKERJAAN PERALATAN UTAMA FIRE ALARM, Merk SHEILD A. PEKERJAAN PERALATAN UTAMA FIRE ALARM,Merk Nohmi
Pengadaan, pemasangan dan pengujian seluruh pekerjaan Peralatan Pengadaan, pemasangan dan pengujian seluruh pekerjaan Peralatan
Utama Fire Alarm lengkap dgn. Master Control Fire Alarm, Terminal Utama Fire Alarm lengkap dgn. Master Control Fire Alarm, Terminal
Box Utama, Sirine, Instalasi kabel pada MCFA, Pesawat Telepon Box Utama, Sirine, Instalasi kabel pada MCFA, Pesawat Telepon
Emergency, dan accessories lainnya sesuai gambar rencana dan Emergency, dan accessories lainnya sesuai gambar rencana dan
spesifikasi teknis. spesifikasi teknis.

A.1 Peralatan Utama Fire Alarm 1.00 Unit 82,160,000 82,160,000 A.1 Peralatan Utama Fire Alarm 1.00 Unit 150,150,000 150,150,000
MCFA System Addressable, Kapasitas 126 primary points per loop, 800 points per MCFA System Addressable, Kapasitas 126 primary points per loop, 800 points per 2 loop, 255
panel when using panel when using addres per loop
sub-points, Powerful, network wide cause and effects (500 total). Fully user sub-points, Powerful, network wide cause and effects (500 total). Fully user
programmable by point or zone programmable by point or zone

(interkoneksi dengan Fire Suppression System - Aerosol) - Bersertifikat UL, Ulc, FM: (interkoneksi dengan Fire Suppression System - Aerosol) - Bersertifikat UL, Ulc, FM:

1. Addressable Repeater Panel (Anounciator) 1. Addressable Repeater Panel (Anounciator) 1.00 unit 29,120,000 29,120,000
2. Battrey charger 30 menit 2. Battrey charger 30 menit
3. Power supply 220 V, 50 Hz 3. Power supply 220 V, 50 Hz
4. Sirine 90-150 dB 2 unit 4. Sirine 90-150 dB 2 unit
5. Pesawat telepon (komunikasi pemadam kebakaran) 5. Pesawat telepon (komunikasi pemadam kebakaran)
6. TBU-MCFA 6. TBU-MCFA
7. Signal audio dari emergency tata suara (sound system) 7. Signal audio dari emergency tata suara (sound system)
8. Testing and commissioning 8. Testing and commissioning
9. Accessories lainnya 9. Accessories lainnya

SUB TOTAL A 82,160,000 SUB TOTAL A 179,270,000

B. PEKERJAAN INSTALASI FIRE ALARM,Merk SHEILD B. PEKERJAAN INSTALASI FIRE ALARM,Merk Nohmi
Pengadaan, pemasangan dan pengujian seluruh pekerjaan instalasi fire alarm Pengadaan, pemasangan dan pengujian seluruh pekerjaan instalasi fire alarm
lengkap dgn jenis, type kabel, isolasi penyambungan kabel, pelindung kabel lengkap dgn jenis, type kabel, isolasi penyambungan kabel, pelindung kabel
(PVC-HI), junction box, berbagai jenis detektor, Break glass switch, lampu tanda, (PVC-HI), junction box, berbagai jenis detektor, Break glass switch, lampu tanda,
dan Alarm bell serta inbow dus, dan klem pipa kabel, serta accessories lainnya dan Alarm bell serta inbow dus, dan klem pipa kabel, serta accessories lainnya
sesuai gambar rencana & spesifikasi teknis sesuai gambar rencana & spesifikasi teknis

B.1 Lantai 1 B.1 Lantai 1


1. Addressable Head Detector w/ Base: S-A4013/S-A4001 2.00 bh 1,006,460 2,012,920 1. Addressable Heat Detector w/ Base 2.00 bh 1,274,000 2,548,000
2. Addressable Smoke Detector w/ Base: S-A4011/S-A4001 52.00 bh 1,027,000 53,404,000 2. Addressable Smoke Detector w/ Base 52.00 bh 1,456,000 75,712,000
3. Outlet Emergency Telepon 4.00 bh 71,890 287,560 3. Outlet Emergency Telepon 4.00 bh 71,890 287,560
4. Addressable Manual Call Point (Break Glass Switch) w/Back Box: S-A4061-S-A4062 4.00 bh 1,951,300 7,805,200 4. Addressable Manual Call Point (Break Glass Switch) w/Back Box 4.00 bh 1,183,000 4,732,000
5. Addressable Open Area Sounder (Alarm Bell): S-A4021 4.00 bh 1,745,900 6,983,600 5. Addressable Open Area Sounder (Alarm Bell) 4.00 bh 1,547,000 6,188,000
6. Addressable Open Area Sounder/Beacon(Lampu Tanda): S-A4025 4.00 bh 1,899,950 7,599,800 6. Addressable Open Area Sounder/Beacon(Lampu Tanda 4.00 bh 1,547,000 6,188,000
7. Dual Priority Switch Monitor Module: S-A4042 1.00 bh 2,310,750 2,310,750 7. Dual Priority Switch Monitor Module 1.00 bh 1,092,000 1,092,000
8. Addressable Isolator Module w/Isolating Base: S-A4051/S-A4007 4.00 bh 1,324,830 5,299,320 8. Addressable Isolator Module w/Isolating Base 4.00 bh 2,002,000 8,008,000
9. Single Input/Output Module: AI-510 1.00 bh 1,776,710 1,776,710 9. Single Input/Output Module 1.00 bh 1,092,000 1,092,000
10. Power Supply Unit : PSU24/3 1.00 bh 4,621,500 4,621,500 10. Power Supply Unit 1.00 bh 3,786,000 3,786,000

SUB TOTAL B.1 92,101,360 SUB TOTAL B.1 109,633,560

B.2 Lantai 2 B.2 Lantai 2


1. Addressable Head Detector w/ Base: S-A4013/S-A4001 2.00 bh 1,006,460 2,012,920 1. Addressable Heat Detector w/ Base 2.00 bh 1,274,000 2,548,000
2. Addressable Smoke Detector w/ Base: S-A4011/S-A4001 54.00 bh 1,027,000 55,458,000 2. Addressable Smoke Detector w/ Base 54.00 bh 1,456,000 78,624,000
3. Outlet Emergency Telepon 4.00 bh 71,890 287,560 3. Outlet Emergency Telepon 4.00 bh 71,890 287,560
4. Addressable Manual Call Point (Break Glass Switch) w/Back Box: S-A4061-S-A4062 4.00 bh 1,951,300 7,805,200 4. Addressable Manual Call Point (Break Glass Switch) w/Back Box 4.00 bh 1,183,000 4,732,000
5. Addressable Open Area Sounder (Alarm Bell): S-A4021 4.00 bh 1,745,900 6,983,600 5. Addressable Open Area Sounder (Alarm Bell) 4.00 bh 1,547,000 6,188,000
6. Addressable Open Area Sounder/Beacon(Lampu Tanda): S-A4025 4.00 bh 1,899,950 7,599,800 6. Addressable Open Area Sounder/Beacon(Lampu Tanda) 4.00 bh 1,547,000 6,188,000
7. Dual Priority Switch Monitor Module: S-A4042 1.00 bh 2,310,750 2,310,750 7. Dual Priority Switch Monitor Module 1.00 bh 1,092,000 1,092,000
8. Addressable Isolator Module w/Isolating Base: S-A4051/S-A4007 4.00 bh 1,324,830 5,299,320 8. Addressable Isolator Module w/Isolating Base 4.00 bh 2,002,000 8,008,000
9. Single Input/Output Module: AI-510 1.00 bh 1,776,710 1,776,710 9. Single Input/Output Module 1.00 bh 1,092,000 1,092,000

Halaman 3 dari 8 FIRE ALARM


estimator3 Page 4 23/05/2018

MEP.04
RENCANA ANGGARAN BIAYA
PROYEK : PENGADAAN DAN PEMASANGAN FASILITAS PENDUKUNG GEDUNG EKS AOC JATSC
DI SOEKARNO HATTA
PEKERJAAN : PEKERJAAN FIRE ALARM (PENDETEKSI DINI KEBAKARAN)
LOKASI : KANTOR CABANG JATSC
Data Material yang diusulkan untuk di CCO Harga Estimasi Usulan Perubahan
Harga Kontrak
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
No. Uraian Pekerjaan (Kontrak) Volume Satuan No. Jenis Pekerjaan Volume Satuan Keterangan
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 1 2 3 4 5 6 7

10. Power Supply Unit : PSU24/3 1.00 bh 4,621,500 4,621,500 10. Power Supply Unit 1.00 bh 3,786,000 3,786,000

SUB TOTAL B.2 94,155,360 SUB TOTAL B.2 112,545,560

SUB TOTAL B 268,416,720 SUB TOTAL B 401,449,120

A. PEKERJAAN PERALATAN UTAMA FIRE ALARM, Merk SHEILD 82,160,000 A. PEKERJAAN PERALATAN UTAMA FIRE ALARM,Merk Nohmi 179,270,000
B. PEKERJAAN INSTALASI FIRE ALARM,Merk SHEILD B. PEKERJAAN INSTALASI FIRE ALARM,Merk Nohmi
B.1 Lantai 1 92,101,360 B.1 Lantai 1 109,633,560
B.2 Lantai 2 94,155,360 B.2 Lantai 2 112,545,560
JUMLAH 268,416,720 JUMLAH 401,449,120

Halaman 4 dari 8 FIRE ALARM


estimator3 Page 5 23/05/2018

MEP.08
RENCANA ANGGARAN BIAYA
PROYEK : PENGADAAN DAN PEMASANGAN FASILITAS PENDUKUNG GEDUNG EKS AOC JATSC
DI SOEKARNO HATTA
PEKERJAAN : PEKERJAAN SECURITY SYSTEM (CCTV & ACCESS CONTROL)
LOKASI : KANTOR CABANG JATSC
Data Material yang diusulkan untuk di CCO Harga Estimasi Usulan Perubahan
Harga Kontrak
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
No. Jenis Pekerjaan Volume Satuan No. Jenis Pekerjaan Volume Satuan Keterangan
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 7 8 1 2 3 4 5 6 7

A. PEKERJAAN PERALATAN UTAMA SECURITY SYSTEM,Merk Sheild A. PEKERJAAN PERALATAN UTAMA SECURITY SYSTEM,Merk Sonny
Pengadaan, pemasangan dan pengujian seluruh pekerjaan Peralatan Pengadaan, pemasangan dan pengujian seluruh pekerjaan Peralatan
Utama CCTV lengkap dgn. Video Switcher, Time lapse Video Recorder, Utama CCTV lengkap dgn. Video Switcher, Time lapse Video Recorder,
Distribusi line control, Remote Control, Instalasi kabel pada CCTV Distribusi line control, Remote Control, Instalasi kabel pada CCTV
dan accessories lainnya sesuai gambar rencana & spesifikasi teknis. dan accessories lainnya sesuai gambar rencana & spesifikasi teknis.

A.1 Peralatan Utama CCTV A.1 Peralatan Utama CCTV


CCTV Kapasitas 8 Camera Input, lengkap dengan ; CCTV Kapasitas 8 Camera Input, lengkap dengan ;
a. Digital Video Recorder-16 Channels 1.00 Unit 21,567,000 21,567,000 a. Licensi IP Kamera untuk NVR Milestone 7.00 Unit 6,800,000 47,600,000 Info dari Suplier
- Power Source : 220/230 VAC, 50 Hz, Mak.35 Watt. b Hardisk 4 TB 2.00 Unit 4,500,000 9,000,000 milestone
- Temperatur Kerja : 0 oC s/d 45 oC.
eSATA, USB2.0 and 16 HDDs

b. Desktop Network Keyboard & Control Keybord, Support 1.00 Unit 25,161,500 25,161,500 c. Network Switch Hub 16 Port 100/1000Mbps (Unit Network Switch 16 Port) 1.00 Unit 5,500,000 5,500,000 Website; Glodok
DVR,NVS,PTZ Dome Camera RS232,RS485 & Network - Power Source : Maksimum 14.7W (220V / 50Hz) online.com
Connections, Joystick Control & PTZ Functions - Bandwidth / Backplane: 32Gbps

c. Network Switch Hub 16 Port 100/1000Mbps (Unit Network Switch 16 Port) 1.00 Unit 6,675,500 6,675,500 - MAC Address Table : 8k
- Power Source : Maksimum 14.7W (220V / 50Hz) - Packet Buffer Memory: 512KB
- Bandwidth / Backplane : 32Gbps - Packet Forwarding Tingkat
: 23.8Mbps
- MAC Address Table : 8k - Jumbo Bingkai : 10240 Bytes
- Packet Buffer Memory : 512KB d. Perangkat komputer Core 3i CPU, keyboard & Printer 1.00 Unit 3,393,500 3,393,500 Website; Tokopedia
- Packet Forwarding Tingkat : 23.8Mbps e. Power Supply + Stabilizer c/w Battery Charger, 230VAC, 50 Hz, 500VA 1.00 Unit 759,000 759,000
- Jumbo Bingkai : 10240 Bytes f. Professional Surveillance System (Video Management Software) 1.00 Set 3,081,000 3,081,000
d. Perangkat komputer Core 3i CPU, keyboard & Printer 1.00 Unit 15,405,000 15,405,000 g. TV LCD Monitor 19" operator 4.00 Unit 1,124,200 4,496,800 Website ; Bhinneka
e. Power Supply + Stabilizer c/w Battery Charger, 230VAC, 50 Hz, 500VA 1.00 Unit 7,702,500 7,702,500 h. Arrester Coaxtrab, 24 V-DC, 15 kA 1.00 bh 564,850 564,850
f. Professional Surveillance System (Video Management Software) 1.00 Set 20,540,000 20,540,000 i. Mounting rak dan hausing 1.00 Unit 9,602,450 9,602,450
g. TV LCD Monitor 19" operator 4.00 Unit 3,081,000 12,324,000 j. Instalasi Fiber Optic 1.00 lot 20,234,000 20,234,000
h. Arrester Coaxtrab, 24 V-DC, 15 kA 1.00 bh 513,500 513,500
i. Mounting rak dan hausing 1.00 Unit 8,729,500 8,729,500 -
A.2 Peralatan Utama Security System
j. Material Bantu dan Testing Commissioning 1.00 lot 2,567,500 2,567,500 Integrated Security System, lengkap dgn;
a. Access Control Client 1.00 unit 28,750,000 28,750,000
A.2 Peralatan Utama Security System 1.00 Unit 92,943,500 92,943,500 - Intel Core i5, 8GB RAM, 1TB HDD
Integrated Security System, lengkap dgn; - Windows 10 Prof 64-bit
Control Panel (Inteligent 4 Door Access Controller: DC-400000) dan 24 Port
a. Ethernet Switch: JFS524 b. UPS for Access Control Client Server 3KVA 1.00 unit 20,700,000 20,700,000
- Power Source : 12/24 VAD, 50 Hz, Mak.50 VA c. Master Controll HID V1000, IP Base 1.00 unit 29,900,000 29,900,000
- Temperatur Kerja : 0 oC s/d 45 oC d. Controll Module HID V100 (unntuk 2 Pintu, RS485) 4.00 unit 13,800,000 55,200,000
- c/w Management Software dan Power Supply Unit. e. Enclosure dan Power Supply 5.00 unit 1,955,000 9,775,000
b. Monitor LCD Keypad, 1 pc
c. Power Supply + Stabilizer, 230VAC, 50 Hz, 250VA, 1 pc
d. Battrey charger 1 jam, 1 pc
e. Testing commissioning
f. Material bantu

TOTAL A 214,129,500 TOTAL A 248,556,600 34,427,100

B. PEKERJAAN INSTALASI CCTV,Merk Sheild B. PEKERJAAN INSTALASI CCTV ,Merk Sonny


Pengadaan, pemasangan dan pengujian seluruh pekerjaan instalasi CCTV Pengadaan, pemasangan dan pengujian seluruh pekerjaan instalasi CCTV
lengkap dgn. jenis, type kabel, isolasi penyambungan kabel, pelindung kabel lengkap dgn. jenis, type kabel, isolasi penyambungan kabel, pelindung kabel
(PVC-HI), berbagai jenis Camera Input, Outlet Stop Kontak, inbow dus, klem (PVC-HI), berbagai jenis Camera Input, Outlet Stop Kontak, inbow dus, klem
pipa kabel, serta accessories lainnya sesuai gambar rencana & spesifikasi pipa kabel, serta accessories lainnya sesuai gambar rencana & spesifikasi
teknis. teknis.

B.1 Lantai 1 B.1 Lantai 1


1. Outdoor Camera-Network IR Bullet (24V-DC), lengkap dengan; 2.00 bh 3,594,500 7,189,000 1. Outdoor Camera-Network IR Bullet (24V-DC), lengkap dengan; 2.00 bh 3,953,950 7,907,900
Fixed Type + Bracket Fixed Type + Bracket
2. Colour Video Camera Dome (24V-DC), lengkap dengan; 4.00 bh 3,337,750 13,351,000 2. Colour Video Camera Dome (24V-DC), lengkap dengan; 4.00 bh 3,671,525 14,686,100
Fixed Type + Bracket Fixed Type + Bracket
3. Door Contanct (Magnetic) atau ID Card 17.00 bh 203,340 3,456,780 3. Paket Locking Pintu
untuk pintu Panel Elektronik, Pintu utama dekat R. Panel elektronik, Pintu utama ke
R. Rapat, 2 Pintu belakang resepsionist
- Card Reader HID Iclass - R10 4.00 bh 4,025,000 16,100,000
- Exit Push button 4.00 bh 460,000 1,840,000

Halaman 5 dari 8 CCTV & Aces control


estimator3 Page 6 23/05/2018

MEP.08
RENCANA ANGGARAN BIAYA
PROYEK : PENGADAAN DAN PEMASANGAN FASILITAS PENDUKUNG GEDUNG EKS AOC JATSC
DI SOEKARNO HATTA
PEKERJAAN : PEKERJAAN SECURITY SYSTEM (CCTV & ACCESS CONTROL)
LOKASI : KANTOR CABANG JATSC
Data Material yang diusulkan untuk di CCO Harga Estimasi Usulan Perubahan
Harga Kontrak
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
No. Jenis Pekerjaan Volume Satuan No. Jenis Pekerjaan Volume Satuan Keterangan
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 7 8 1 2 3 4 5 6 7
- Magnetic Lock + Bracket 4.00 bh 3,680,000 14,720,000

4. Paket Instalasi Locking Pintu


- Instalsi AWG 18+ cat 6 di dallam Pipa Knduit, dari Pintu Belakang resepsionis 2.00 ttk 1,820,000 3,640,000 TAHAP I blm ada
ke Kontrol Panel untuk card reader
- Instalasi Kabel Cat 6 di dalam pipa konduit, dari Pintu Belakang resepsionist 2.00 ttk 910,000 1,820,000 TAHAP I blm ada
ke Kontrol Panel untuk Exit Button dan EM Lock

SUB TOTAL B.1 23,996,780 SUB TOTAL B.1 60,714,000 36,717,220

B.2 Lantai 2 B.2 Lantai 2


1. Colour Video Camera Dome (24V-DC), lengkap dengan; 4.00 bh 3,337,750 13,351,000 1. Colour Video Camera Dome (24V-DC), lengkap dengan; 4.00 bh 3,671,525 14,686,100
Fixed Type + Bracket Fixed Type + Bracket
2. Door Contanct (Magnetic) atau ID Card 18.00 bh 203,340 3,660,120 2 Paket Locking Pintu
2 Pintu Bordes Belakang

- Card Reader HID Iclass - R10 2.00 bh 4,025,000 8,050,000


- Exit Push button 2.00 bh 460,000 920,000
- Magnetic Lock + Bracket 2.00 bh 3,680,000 7,360,000
3 Paket Instalasi Locking Pintu
- Instalsi AWG 18+ cat 6 di dallam Pipa Knduit, dari Pintu masuk Bordess 1.00 ttk 1,820,000 1,820,000 TAHAP I blm ada
ke Kontrol Panel untuk card reader
- Instalasi Kabel Cat 6 di dalam pipa konduit, dari Pintu masuk Bordess 1.00 ttk 910,000 910,000 TAHAP I blm ada
ke Kontrol Panel untuk Exit Button dan EM Lock

SUB TOTAL B.2 17,011,120 SUB TOTAL B.2 33,746,100 16,734,980


343,016,700
TOTAL B TOTAL B

A. PEKERJAAN PERALATAN UTAMA SECURITY SYSTEM,Merk Sheild 214,129,500 A. PEKERJAAN PERALATAN UTAMA SECURITY SYSTEM,Merk Sonny 248,556,600
B. PEKERJAAN INSTALASI CCTV,Merk Sheild B. PEKERJAAN INSTALASI CCTV ,Merk Sonny
B.1 Lantai 1 23,996,780 B.1 Lantai 1 60,714,000
B.2 Lantai 2 17,011,120 B.2 Lantai 2 33,746,100
JUMLAH A & B 255,137,400 JUMLAH A & B 343,016,700

87,879,300 87,879,300

Halaman 6 dari 8 CCTV & Aces control


estimator3 Page 7 23/05/2018

RENCANA ANGGARAN BIAYA MEP.09


PROYEK : PENGADAAN DAN PEMASANGAN FASILITAS PENDUKUNG GEDUNG EKS AOC JATSC
DI SOEKARNO HATTA
PEKERJAAN : PEKERJAAN FIRE SUPPRESSION SYSTEM - GENERATOR AEROSOL SYSTEM
LOKASI : KANTOR CABANG JATSC
Data Material yang diusulkan untuk di CCO Harga Estimasi Usulan Perubahan
Harga Kontrak
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
No. Jenis Pekerjaan Volume Satuan No. Jenis Pekerjaan Volume Satuan Keterangan
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 7 8 1 2 3 4 5 6 7

A. PEKERJAAN FIRE SUPPRESSION SYSTEM - GENERATOR AEROSOL SYSTEM A. PEKERJAAN FIRE SUPPRESSION SYSTEM - GENERATOR AEROSOL SYSTEM

1 Ruang Monitoring Dan Panel Elektrinik Lantai 1 1 Ruang Monitoring Dan Panel Elektrinik Lantai 1
Data Ruangan (10 m x 5,8 m x 3 m), Volume 174 m3 Data Ruangan (10 m x 5,8 m x 3 m), Volume 174 m3
Kapasitas Mass Fire : 17.4 gr Kapasitas Mass Fire : 17.4 gr
a. Cannister Unit Type 3.000gr, Bersertifikat UL, Ulc, FM 4.00 unit 27,729,000 110,916,000 a. Cannister Unit Type 3.000gr, Bersertifikat UL, Ulc, FM 4.00 unit 22,806,000 91,224,000
b. Cannister Unit Type 2000gr, Bersertifikat UL, Ulc, FM 3.00 unit 22,799,400 68,398,200 b. Cannister Unit Type 2000gr, Bersertifikat UL, Ulc, FM 3.00 unit 19,404,000 58,212,000
c. Unit Sequential Activator, Bersertifikat UL, Ulc, FM 7.00 unit 2,567,500 17,972,500 c. Unit Sequential Activator, Bersertifikat UL, Ulc, FM 7.00 unit - Item Diganti
Item Baru
d. Peralatan dan Instalasi Fire Alarm (Pendeteksi Dini), Bersertifikat UL, Ulc, FM Thee-channel input /output module (inchi housing) 5.00 unit 3,626,000 18,130,000 Penganti
Item Baru
- Addressable Smoke Detector w/ Base: S-A4011/S-A4001 4.00 bh 1,027,000 4,108,000 Adaptor for Fire pro Aerosol TI, A4(Inchi ,housing) 2.00 unit 3,010,000 6,020,000 Penganti
- Addressable Heat Detector w/ Base: S-A4013/S-A4001 4.00 bh 1,006,460 4,025,840 d. Peralatan dan Instalasi Fire Alarm (Pendeteksi Dini), Bersertifikat UL, Ulc, FM
- Addressable Open Area Flashing Light with sirene 2.00 bh 1,725,360 3,450,720 - Addressable Smoke Detector w/ Base 4.00 bh 1,498,000 5,992,000
- Addressable Open Area Alarm Bell 2.00 bh 1,797,250 3,594,500 - Addressable Heat Detector w/ Base 4.00 bh 1,260,000 5,040,000
- Addressable Open Area Alarm Horn with Strobe Light 2.00 bh 1,797,250 3,594,500 - Addressable Open Area Flashing Light with sirene 2.00 bh 3,626,000 7,252,000
- Addressable Open Area Evacuate Area Sign 2.00 bh 2,567,500 5,135,000 - Addressable Open Area Alarm Bell 2.00 bh 1,008,000 2,016,000
- Addressable Open Area Gas Discharge Sign 2.00 bh 2,567,500 5,135,000 - Addressable Open Area Alarm Horn with Strobe Light 2.00 bh 2,478,000 4,956,000
- Abort Switch 2.00 bh 872,950 1,745,900 - Addressable Open Area Evacuate Area Sign 2.00 bh 2,366,000 4,732,000
- Addressable Open Area Gas Discharge Sign 2.00 bh 2,366,000 4,732,000
-Analog Addressable Manual Fire Alarm Call Point (red)(inchi),(cover) 1.00 unit 1,610,000 1,610,000 Item Baru
-Analog Addressable Manual Extinguishing Call Point (yellow) (Inchi) (cover) 1.00 unit 1,778,000 1,778,000 Item Baru
- Abort Switch 2.00 bh 1,745,900

TOTAL 1 228,076,160 TOTAL 1 213,439,900

2 Ruang TRAFO & PANEL LISTRIK Lantai 1 2 Ruang TRAFO & PANEL LISTRIK Lantai 1
Data Ruangan (4,8 m x 5,8 m x 3 m), Volume 83,52 m3 Data Ruangan (4,8 m x 5,8 m x 3 m), Volume 83,52 m3
Kapasitas Mass Fire : 8.352 gr Kapasitas Mass Fire : 8.352 gr
a. Cannister Unit Type 3.000gr 3.00 unit 27,729,000 83,187,000 a. Cannister Unit Type 3.000gr 3.00 unit 22,806,000 68,418,000
b. Unit Sequential Activator 3.00 unit 2,567,500 7,702,500 b. Unit Sequential Activator 3.00 unit - Item Diganti
Item Baru
c. Peralatan dan Instalasi Fire Alarm (Pendeteksi Dini) Thee-channel input /output module (inchi housing) 4.00 unit 3,626,000 14,504,000 Penganti
Item Baru
- Addressable Smoke Detector w/ Base: S-A4011/S-A4001 4.00 bh 1,027,000 4,108,000 Adaptor for Fire pro Aerosol TI, A4(Inchi ,housing) 1.00 unit 3,010,000 3,010,000 Penganti
- Addressable Heat Detector w/ Base: S-A4013/S-A4001 4.00 bh 1,006,460 4,025,840 c. Peralatan dan Instalasi Fire Alarm (Pendeteksi Dini)
- Addressable Open Area Flashing Light with sirene 1.00 bh 1,725,360 1,725,360 - Addressable Smoke Detector w/ Base 4.00 bh 1,498,000 5,992,000
- Addressable Open Area Alarm Bell 1.00 bh 1,797,250 1,797,250 - Addressable Heat Detector w/ Base 4.00 bh 1,006,460 4,025,840
- Addressable Open Area Alarm Horn with Strobe Light 1.00 bh 1,797,250 1,797,250 - Addressable Open Area Flashing Light with sirene 1.00 bh 1,725,360 1,725,360
- Addressable Open Area Evacuate Area Sign 1.00 bh 2,567,500 2,567,500 - Addressable Open Area Alarm Bell 1.00 bh 1,797,250 1,797,250
- Addressable Open Area Gas Discharge Sign 1.00 bh 2,567,500 2,567,500 - Addressable Open Area Alarm Horn with Strobe Light 1.00 bh 1,797,250 1,797,250
- Abort Switch 1.00 bh 872,950 872,950 - Addressable Open Area Evacuate Area Sign 1.00 bh 2,567,500 2,567,500
- Addressable Open Area Gas Discharge Sign 1.00 bh 2,567,500 2,567,500
-Analog Addressable Manual Fire Alarm Call Point (red)(inchi),(cover) 1.00 unit 1,610,000 1,610,000 Item Baru
-Analog Addressable Manual Extinguishing Call Point (yellow) (Inchi) (cover) 1.00 unit 1,778,000 1,778,000 Item Baru
- Abort Switch 1.00 bh 872,950 872,950

TOTAL 2 110,351,150 TOTAL 2 110,665,650

JUMLAH 338,427,310 JUMLAH 324,105,550

Halaman 7 dari 8 FSS AEROSOL


estimator3 Page 8 23/05/2018

MEP.06
RENCANA ANGGARAN BIAYA
PROYEK : PENGADAAN DAN PEMASANGAN FASILITAS PENDUKUNG GEDUNG EKS AOC JATSC
DI SOEKARNO HATTA
PEKERJAAN : PEKERJAAN TELEPON DAN DATA
LOKASI : KANTOR CABANG JATSC
Data Material yang diusulkan untuk di CCO Harga Estimasi Usulan Perubahan
Harga Kontrak
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
No. Jenis Pekerjaan Volume Satuan No. Jenis Pekerjaan Volume Satuan Keterangan
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 7 8 1 2 3 4 5 6 7
Item Penambahan Usulan Estimasi
A. PEKERJAAN PERALATAN UTAMA PABX, Merk Panasonic A Pesawat Telephone Digital Panasonic KX-DT521X
Beserta Accessories lainnya sesuai gambar rencana &
Pengadaan, pemasangan dan pengujian seluruh pekerjaan Peralatan spesifikasi teknis
Utama PABX lengkap dgn. Billing System & Gate Way, Terminal a. Lantai 1
Box Utama, Perangkat Komputer & Printing, Instalasi kabel pada PABX - R. Minibar, R.VIP1, R.VIP2, 5.00 Unit 175,000 875,000 Website ; Glodok.com
dan accessories lainnya sesuai gambar rencana & spesifikasi teknis. R. Panel Elektronik, , R. Meeting Room
- R.Receptionist , R. Direktur 2.00 Unit 1,815,000 3,630,000 Website ; Trivateljaya
A.1 Peralatan Utama Telepon 1.00 Unit 115,178,050 115,178,050 b. Lantai 2
PABX Kapasitas 6/80 Extention, lengkap dengan; - R. Junior Manager,R.Receptionist, R.Manager, 4.00 Unit 1,815,000 7,260,000
a. Billing system + Gate away Dan Vo/IP R. General Manager
b. Automatic Attendant Console - R. Staff2,3,4, 3.00 Unit 175,000 525,000
c. Perangkat komputer (Monitor, CPU, keyboard & Printer)
d. Power supplay 220V, 50Hz
e. Battery charger untuk 30 Menit
f. Digitel telepon operator 1 unit
g. TBU-PABX 90 pairs
h. Testing and commissioning
i. Pembumian Pengaman + Arresster, 10 line
j. Accessories lainnya

A. PEKERJAAN PERALATAN UTAMA PABX, Merk Panasonic 115,178,050

12,290,000

127,468,050

Halaman 8 dari 8 TELEPON & DATA