Design
Design
ABSTRACT: The project entitled analysis and design and divisions, each having a divisional headquarters. There are a
execution of cross traffic works in railways using box total of sixty-eight divisions.
pushing technique (RUB), illustrates about the work to be
carried out for the widening of existing roads using box 1.2 Comparison with Other Conventional Methods
pushing techniques for rail under bridges. It also explains Box pushing technique is much better when compared with
about the methodology involved in execution of box the other conventional methods like open-cut systems, as the
pushing technique. The design will be carried out as per open-cut method requires excavation, digging, placing etc.,
Indian standards, particularly Indian railways standards, which causes inconvenience to the movement of vehicles and
IRC, IRS, and IS CODES. In which the design of major traffic problems., but whereas the box pushing technique
components thrust bed, precast box used for the widening does not make any disturbance to the existing traffic but also
are done as per IRS codes. The design of pre cast box is provides widening of existing road within a short period of
done using STAAD pro, it also includes the layout of time.
reinforcement details of two important structures used in
this method apart from conventional method i.e., thrust bed 1.3The Need of Box Pushing Technique
(main bed and auxiliary bed), pre cast box. In railways Present day Intensity of Traffic, both Rail & Road
whenever there is a need to make a underpass ,either for due to the fast development, is very heavy it cannot
canal crossing, RUB’S(Rail under bridges), programme of the disturbed, for construction of under bridges or
widening existing railway culverts etc.BOX PUSHING Canal Crossings, drainage etc. by conventional i.e.
TECHNIQUE is used. Since the work has to be done open cut system.
without interruption to rail traffic, box pushing technique is Box Pushing Technique is developed where in
largely favoured in comparison to conventional methods. R.C.C. Boxes in segments are cast outside and
Present day Intensity of Traffic, both Rail & Road due to pushed through the heavy embankments of Rail or
the fast development, is very heavy it cannot the disturbed, Road by Jacking.
for construction of under bridges or Canal Crossings,
drainage etc by conventional i.e. open cut system. Box 1.4 OBJECTIVES
Pushing Technique is developed where in R.C.C. Boxes in In the present dissertation work on ANALYSIS & DESIGN
segments are cast outside and pushed through the heavy OF BOX PUSHING TECHNIQUE. Analytical models of
embankments of Rail or Road by Jacking. BOX PUSHING TECHNIQUE are prepared and analyzed
Keywords: Cross Traffic Works, Box Pushing Technique, by using STAAD PRO software. In the current study, work
Rail Under Bridge (RUB),IRC,IRS, IS Codes. is carried-out on the methodology of the box pushing
technique, which provides widening of existing RUB at
I. INTRODUCTION Chicksugur, Raichur dist.
1.1 General
In railways whenever there is a need to make a underpass II. METHODOLOGY
,either for canal crossing, RUB’S(Rail under bridges), 2.1 General
programme of widening existing railway culverts etc..BOX Excavation
PUSHING TECHNIQUE is used. Since the work has to be Casting of Thrust Bed
done without interruption to rail traffic, box pushing Fabrication of Front and Rear shield
technique is largely favored in comparison to conventional Box Casting and placing
methods. Transportation is one of the main objects in the
Pushing-shifting-pushing operation
infrastructure of a developing country like India. Most of the
Miscellaneous works
Indian intra national transportation is done by railways.
Precautions
Railways were first introduced to India in 1853
from Bombay to Thane. In 1951 the systems were
2.2 Box Pushing Operation
nationalized as one unit, the Indian Railways, becoming one
of the largest networks in the world. Comprising 115,000 km To push precast box segment, reaction is obtained
(71,000 miles) of track over a route of 65,000 km from thrust bed. For this, screed is dismantled at pin
(40,000 miles) and 7,500 stations. Sixteen Zones in pocket location, pin pockets are cleaned, pins are
2003. Each zonal railway is made up of a certain number of inserted and Hydraulic Jacks- 8/10 nos. are installed
between pins and bottom slab of the box with Sakthinagar in Raichur –Karnataka district”, on either side of
packing plates and spacers. existing RUB with Box of size 7.5 x 5.5 mt at Railway Km
A 20mm thick plate is provided, butting against 205/200-300
bottom slab of box, in front of the Jacks to avoid Phase –I
damage to concrete surface.
Nail anchor plates are removed and earth is manually 3.1.1 Design Data
excavated in front of cutting edge in a way to get Rail level = 108.907
annular clear space of 300mm all-round. Formation level = 108.232
Anchor plates are refixed in position and uniform Size of box (2) = 7.500x5.650
pressure is applied to the jacks through Power Pack. Top of bottom slab of box= 101.257
After complete push (maximum 300mm) jacks are Top of box = 107.657
released, protruding nails are gas cut/driven and jacks Top of thrust bed (top of screed) = 100.507
again packed with packing plates and spacers. Earth cushion (from top of box) = 0.575
Process is repeated till front box is pushed to required Thickness of top slab = 0.750
position. Thickness of bottom slab = 0.750
Then 2nd box segment is slewed and brought in Thickness of wall: outer walls= 0.750
position behind 1st box segment. Out to out width of box = 9
Out to out height = 7.150
8 nos. Jacks, each of 200 Tons capacity, are housed
Total pushing length = 22
between two box segments in addition to 8 nos. Jacks
No of segments = 2
already provided between thrust bed and 2nd box
Length of first and second segments = 11.00
segment.
Thickness of thrust bed = 0.750
3 nos. Jacks, each of 100 Tons capacity, are provided
Concrete grade = M25
in 3 slots made in each sidewall to facilitate
Steel grade Fy = 500
correction of line and level of box during pushing.
Bulk density of soil = 2.10 t/mt3, taken on
Earthwork is now done in front of 1st box segment
conservative
and it is pushed. Protruding nails are gas cut/driven
and anchor plates are refixed in position.
3.1.2 Dead Loads
Thereafter, jacks housed between two box segments 3.1.2.1 Vertical Loads
are released and then 2nd box segment is pushed. As normally in railways, total weight of 6750kg/m including
Process is repeated till both the box segments are track str.is to be taken
pushed to required position. Hence for total no of tracks =1x6750 =6750 kg/m
Cutting Edge is dismantled & front face of 1st box Total weight of P.Way on top of box unit = 6750x11(length
segment is cast in plumb. of box unit) =74250 kgs =74.25T
3.1.2.2 Earth Filling Cushion
2.3 Stages in Execution of Work So total UDL on top of slab of box will be =1.208x9(o/o
1. Excavation for thrust bed and auxiliary bed. width) x11 = 119.54T
2. Concreting of thrust bed & pin pockets. Hence Total Weight at Top = 74.25+119.54
3. Casting of box segments. = 193.79 T
4. Protection of track & embankment. Load on Bottom Surface=load on top +self-weight of box
5. Arrangement of adequate capacity jacks with power Weight of Box =9.00X0.750X2X2.50 = 33.75
pack. Weight of Vertical Walls =5.650X1.50X1X2.5= 21.19
6. Pushing operation. Haunches =4.00X0.15X0.075X2.50 = 0.11
7. Construction of Wing wall/Toe wall/Return WALL Total Weight per Meter = 55.05
Weight of One Segment =55.05X11 = 605.5T
2.4 Major Components of Rub: Load on Bottom Surface =193.79+605.55 = 799.3 T
1. THRUST BED
2. PRECAST BOX 3.1.2.3 Earth Pressure
3. FRONT SHIELD From bottom of the box
4. REAR SHIELDS Soil parameters Ɵ = 28.00 δ = 9.33
5. PINS POCKECTS Active earth pressure co-efficient ka 0.3344
6. HYDRAULIC JACKS [B] EARTH PRESSURE [Ref: cl – 5.7 of IRS code for sub
str. & Foundation]
III. RESULTS AND DISCUSSIONS cos 2 (Ɵ − α)
3.1Analysis and Design of Thrust Bed 𝐾𝑎 = 2
sin Ɵ+δ −sin
(Ɵ+i)]
3.1.0 Introduction cos 2 α cos α + δ 1 +
cos α−δ −cos
(α−i)
This report contains design of Thrust Bed for precast RCC cos (Ɵ − α) = 0.7797
single box to be pushed inside the embankment for cos α + δ = 0.9868
“Proposed RUB, at Chicksukur Railway station, Near
sinƟ + δ = 0.6064
REFERENCES
[1] Advanced Structural Analysis by Ashok k. Jain,
New Channel Brothers.
[2] Dynamics of Structures by Clough and Penzien