The document outlines the checklist requirements for project proposals and completion reports for solar off-grid power packs submitted to the Telangana State Renewable Energy Development Corporation (TSREDCO) Ltd. The proposal form requires an application, customer photo, Aadhar card, electricity bill or non-electricity certification, and bank documents. The completion report requires application forms, invoices, certificates, photos of the installed system and beneficiary, and application fees in the form of a DD based on the system size.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
46 views1 page
Check List For SPV Off Grid Systems PDF
The document outlines the checklist requirements for project proposals and completion reports for solar off-grid power packs submitted to the Telangana State Renewable Energy Development Corporation (TSREDCO) Ltd. The proposal form requires an application, customer photo, Aadhar card, electricity bill or non-electricity certification, and bank documents. The completion report requires application forms, invoices, certificates, photos of the installed system and beneficiary, and application fees in the form of a DD based on the system size.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
TELANGANA STATE RENEWABLE ENERGY DEVELOPMENT CORPORATION
LTD. (TSREDCO)
Check List for Project Proposal/Completion Reports Form for Solar Off-Grid Power Packs.
I. Form (A) Proposal:-
1. Application with covering letter.
2. Photograph of customer. 3. Aadhar Card (Color Xerox). 4. Electricity Bill/Certification for Non-Electricity with Address proof. 5. Bank Passbook/Cancelled Cheque leaf of Beneficiary.
II. Completion Reports :-
1. Part – A, B & C with Application number.
2. Invoice. 3. C.A Certificate. 4. Photograph (Which includes Beneficiary for both panels & Inverters, Batteries). 5. a) Photo of the installed system with the beneficiary before inspection. b) Photos of the installed system with the beneficiary and Inspecting Officer.
Handbook on Construction Techniques: A Practical Field Review of Environmental Impacts in Power Transmission/Distribution, Run-of-River Hydropower and Solar Photovoltaic Power Generation Projects
Challenges and Approaches for Selecting, Assessing and Qualifying Commercial Industrial Digital Instrumentation and Control Equipment for Use in Nuclear Power Plant Applications
LED Street Lighting Best Practices: Lessons Learned from the Pilot LED Municipal Streetlight and PLN Substation Retrofit Project (Pilot LED Project) in Indonesia