1, Requirements
Android mobile phone supported OTG function.
OTG Function must be on
Android system version must be over 4.0
Controller with IR communication function
IR terminal for insert to the Mobile phone
http://www.epsolarpv.com/en/index.php/Technical/download
After installing them ,it will show the logo”EPEVER” in your mobile phone desk
4, Confirm connected
After insert the IR terminal , your mobile phone will jump a message , Press “OK” to
confirm.
If no message to jump ,
1) check if the power is lower
2)In your Mobile Phone “setting” to find “developer options”, and choose “usb
APP Application
you have to click“Read” (to read the connected controller info) ,configure (to program
the needed info) and click” Send”(to copy the configured info to controller)
Click “Pull down Refresh ” to check the latest data from the controller
Add:BLDG#18,CO.PARK,NO.8HEYING ROAD,CHANGPING DISTRICT,BEIJING,CHINA.102200
Tel:86-10-82894112 / 82894962 Fax:86-10-82894882 Web:www.epsolarpv.com
北京汇能精电科技股份有限公司
BEIJING EPSOLAR TECHNOLOGY CO., LTD
between controller and Mobile .If you have LS-EPLI ,Tracer-EPLI in hand , you have
to choose “Infrared “
5, Battery Setting
Mainly set the battery type(Sealed,Gel,Flood, User), system nominal voltage and
If you want to program the Charging voltage setpoint , you have to choose
“Advance ” , “Battery Type “to “User”, And the “Rated Voltage Level “ must not be
“self-recognition”
6、Load Setting
On : means when powering on the system , the load will be on all the time unless the
battery is overdicharge and then will be on again after the battery reach to the
recovery voltage
From Dark to Dawm ,sunlight strognness is different .Then there will be different
Voltage .
delay .
1)The Load will work following to the setting of Timer1,Timer2 and Timer 3 in order
2)The night length time<Time1+Time2+Time3 , the Load work time will be real night
length time
3)The night length time>Time1+Time2+Time3 , there will be a gap for load not work .
You may adjust the load output Power % in “Rated Current Percent”
Load working time will follow to the real time after synchronizing the controller time to
Rated Current= Load light source Power/ Load light source Power
Add:BLDG#18,CO.PARK,NO.8HEYING ROAD,CHANGPING DISTRICT,BEIJING,CHINA.102200
Tel:86-10-82894112 / 82894962 Fax:86-10-82894882 Web:www.epsolarpv.com
北京汇能精电科技股份有限公司
BEIJING EPSOLAR TECHNOLOGY CO., LTD
When Battery voltage drop to System rated Voltage but not over discharge,
controller will control the load output by power reduction, (The output power percent
Remarks: (5) and (6) are only for the LED Driver or Controller with built in LED
Driver