Hitachi Plant Technologies provides services for thermal power plants including gas turbines, steam turbines, generators, heat recovery steam generators, boilers, and combined cycle and cogeneration plants. It has experience with projects involving installation of new equipment, refurbishment, overhaul, renovation, replacement, and maintenance. It offers construction planning, materials fabrication, engineering design, procurement, project management, field work, maintenance and repair. Major milestones include constructing the first power plant in Japan in 1957 and over 250 units in Japan, as well as projects in over 20 countries overseas since 1963.

Uploaded by

pedro peres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
177 views40 pages

Actividad para Plantas Térmicas

Hitachi Plant Technologies provides services for thermal power plants including gas turbines, steam turbines, generators, heat recovery steam generators, boilers, and combined cycle and cogeneration plants. It has experience with projects involving installation of new equipment, refurbishment, overhaul, renovation, replacement, and maintenance. It offers construction planning, materials fabrication, engineering design, procurement, project management, field work, maintenance and repair. Major milestones include constructing the first power plant in Japan in 1957 and over 250 units in Japan, as well as projects in over 20 countries overseas since 1963.

Uploaded by

pedro peres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 40

HPT’s Activity

for
Thermal Power Plants

Hitachi Plant
Technologies, Ltd

July, 2006
Business Area

¾ Gas Turbine
¾ Steam Turbine
¾ Generator
¾ HRSG
¾ Conventional Boiler (Coal,
Oil, Gas)
¾ Combined Cycle
¾ Co-generation Plant etc

Hitachi Plant Technologies 2


Type of Project

) Installation of New Equipment


) Refurbishment
) Overhaul
) Renovation
) Replacement
) Maintenance etc

Hitachi Plant Technologies 3


Scope of Work: Overview

Construction
Materials
Planning Fabrication
Detail
Design
BOP
Engineering Supply
Design
of BOP Spare Parts
Project
Management
Civil &
Field Maintenance Field Building
Work & Repair Work Electrical
Supply of Work
Piping Mechanical
Fabrication &
Work Erection
Materials
Hitachi Plant Technologies 4
Division of Works: Case-1

OWNER

Main Contractor

Supplier HPC
• Main Equipment • M & E Field Wok

• Basic Engineering • BOP Design & Supply


• Detail Eng. / Material Supply
• Civil & Building
Hitachi Plant Technologies 5
Division of Works: Case 2

OWNER

Main Contractor

Supplier HPC
• Main Equipment • M & E Field Wok
• Basic Engineering • Detail Engineering
• BOP Design & Supply • Material Supply
• Civil & Building
Hitachi Plant Technologies 6
Major Mail stone 
¾ JAPAN:
- First power plant : year1957
- 250 units constructed in Japan
¾ OVERSEAS:
- First power plant - in India: year 1963
- Erection Experience in over 20 counties

Hitachi Plant Technologies 7


Execution Record in Overseas: Overview
PAKISTAN
CANADA
GTG 16unit &TG:
TG 19 projects:
1,140MW
5,520MW

IRAN JAPAN
GTG 23unit & TG: 83 projects: 41.815MW
600MW Br: 16 projects
BTG: 25 projects
TG:25 projects
KUWAIT
CC: 11 projects
GTG 8 units:
BAHAMA GTG: 6 projects
225 MW
GTG 2unit: 50 MW
EGYPT CHINA
GTG 4units : 100MW BTG:250MW
MEXICO
GTG 7 units & TG: NIGERIA THAILAND
456 MW GTG 6 units & BTG: CC & BTG: 79MW
1,690 MW
CUBA
GTG 3unit & BTG: PHILIPIPINES
229MW TG & Br: 850MW
INDIA
SAUDIARAB IA GTG 2unit, BTG
GTG 10 units: & TG: 200 MW SINGAPORE
VENEZUELA 350 MW GTG 2units, CC,
Br 3units: 1,200MW MALAYSIA TG: 2,650 MW
GTG 7 units:
170MW
TOTAL: 64,000 MW
ARGENTINA
AUSTRALIA
TG 2units: 360MW
GTG 5units, TG & Br: 3,856MW

Hitachi Plant Technologies 8


Execution Records : Overseas

PERU THAILAND
Ilo Thermal Power MAPUTAPHUT
125 MW Power Station 70MW x 2 GT-G
(Marker: Hitachi, Ltd.) (Maker : GE)
Completed in Year 2000 Completed in Year 1997

Hitachi Plant Technologies 9


Execution Records : Overseas

NIGERIA NIGERIA
Lagos Thermal Power Delta Power Station
Boiler/Turbine H25 Gas Turbine 6Unit
Rehabilitation Work (Maker: HITACHI)
(Maker: HITACHI)

Hitachi Plant Technologies 10


Execution Records : Overseas

BAHAMA
Bahama Electricity Co.
25MW x 2 Gas Turbines
(Marker: Hitachi, Ltd.)
Completed in Year 2003

Hitachi Plant Technologies 11


Execution Records : Overseas

BAHAMA
1. Contract Formation: Hitachi
HitachiLtd.
Ltd. Main Equipment Supply

Bahamas
BahamasElectricity
ElectricityCorp.
Corp. Sumitomo
SumitomoCorp.
Corp.
Foundation work,
Hitachi
HitachiPlant
Plant Installation work &
2. Location: Material Supply

Replacement
Replacement of
of GTG
GTG (F5
(F5
class)
class) to
to H25
H25 (25MW)
(25MW)

Hitachi Plant Technologies 12


Major Projects: Overseas

EGYPT
Cairo North 750MW Combined Cycle Power Station
Erection Works
250MW x 2 Gas Turbines and Generators
(Maker: Mitsubishi Heavy Industries)
250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.)

Hitachi Plant Technologies 13


Execution Records: Singapore - Overview

Senoko P.S.
Senoko P.S.No.1~8
No.1~8
        120MW×3
        120MW×3
        250MW×5
        250MW×5

Jurong P.S.
Jurong P.S. No.1~4
No.1~4
60MW×4
60MW×4

Tuas stage
Tuas stage 22
Phase2
Phase2 720MW
720MW C/C
C/C

Tuas Stage1No.1,2
Tuas Stage1No.1,2 Sakura
Sakura P.S.
P.S. 800MW
800MW C/C
C/C Seraya
Seraya P.S.
P.S. No.4~6
No.4~6 HPC 
HPC 
600MW×2
600MW×2 250MW×3
250MW×3 Singapore
Singapore Branch
Branch
Hitachi Plant Technologies 14
Execution Records: Singapore - Tuas

SINGAPORE
Tuas Stage I 600 MW x Tuas Stage II 360 MWx2
2ST-G (Maker:Hitachi,Ltd.) Combined Cycle Power Station
Completed in Year 1999 (Maker: Mitsubishi Heavy Industries)

Hitachi Plant Technologies 15


Execution Records in Australia STANWELL:
1,400MW(350MW×4)
Maker: Hitachi,Ltd.
Completed in year 1996
TARONG:
1400MW(350MW×4)
MUNGARRA:
Maker: Hitachi,Ltd. TARONG NORTH:
37MW (F6×1)
Completed in year 1988 450MW(450MW×1)
Maker: Hitachi,Ltd.
Maker: Toshiba,Ltd.
Completed in year
Completed in year 2002
1989
BRISBANE

MELBOURNE SYDNEY
PERTH
LOY YANG B:
PINJAR: KALGOORIE: 1,000MW(500MW×2)
37MW (F6×1) 37MW (F6×1) Maker :Hitachi,Ltd.
Maker : Hitachi,Ltd. Maker: Hitachi,Ltd. Completed in year 1996
Completed in year 1990 Completed in year 1989

Hitachi Plant Technologies 16


Execution Records: Australia- Queensland

Tarong Power Station


350MW x 4 Steam Turbines
(Maker: Hitachi, Ltd.)
Completed in Year 1988

Hitachi Plant Technologies 17


Execution Records: Australia- Queensland

Tarong North Power Station


450MW x 1 Steam Turbines
(Maker: Toshiba, Ltd.)
Completed in Year 2002

Hitachi Plant Technologies 18


Execution Records: Australia- Queensland

Stanwell Power Station


350MW x 4 TG & Auxiliaries
(Maker: Hitachi, Ltd.)
Completed in Year 1996

Hitachi Plant Technologies 19


Execution Records: Australia- Victoria

Loy Yang ‘B’:


500MW x 2 TG & Auxiliaries
(Maker: Hitachi, Ltd.)
Completed in Year 1996

Hitachi Plant Technologies 20


Execution Records: Australia- Western
Australia

- Mungarra : 37MW x 1 F6 Gas Turbine


(Maker: Hitachi, Ltd.) Completed in year 1989
- Kalgoorlie: 37MW x 1 F6 Gas Turbine
(Maker: Hitachi, Ltd.) Completed in year 1989
- Pinjar: 37MW x 1 F6 Gas Turbine
(Maker: Hitachi, Ltd.) Completed in year 1990

Hitachi Plant Technologies 21


Execution Records: Kogan Creek 750MW (
under construction)

) Project Name: Kogan Creek Power plant 750MW coal


fired power station
) Location: Queensland, Australia
) Owner: CEPA(Kogan Creek)Holding Pty Ltd.
) Manufacture: SIEMENS Ltd. Australia
) Scope of our work: Installation work
) Date of Contract: Aug 2005
) Date of Completion: Aug, 2007

Hitachi Plant Technologies 22


Execution Records: Australia

) Waste Water Treatment Plant for Sydney Metropolitan


Waste Disposal Authority
) Major overhaul of Tarong U1 Turbine
) Refurbishment and re-commissioning of Swankbank
‘A’ Sootblowers
) Electrical & instrumentation for retrofit of precipitators
fabric filter plant Swankbank ‘B’.
) Cabling, light & power services for Callide ‘A’ re-
powering

Hitachi Plant Technologies 23


Execution Records : Venezuela - CADAFE

) 1978– 1984

) PLANTA CENTRO THERMAL POWER STATION UNITS 3 & 4,


and Unit 5

) Owner: COMPAÑÍA ANONIMA DE ADMINISTRACION Y


FOMENTO (CADAFE)

) Unit:3 & 4: Installation of Two 1400 Ton/Hour Boilers and


Associated equipment for 400 MW generating Units No 3 & 4,
AFE including erection of Steel Structures of the Boilers.

) Unit 5: Installation of 1,400 Ton/Hour boiler for 400 MW


generation unit.

Hitachi Plant Technologies 24


Execution Records : Venezuela - Tacoa DCS

) Construction period: 2004-2005

) Project Name: Tacoa Power plant unit 7, 8 & 9 - DCS (Distributed


digital controls) project

) Owner: La Electricidad de Caracas (EDC)

) Purchaser: Toshiba Corporation (Mitsui & Co., ltd)

) Site: Caracas

) HPC & VHPC’s scope

- Installation and electrical works

- Supply of cables & materials


Hitachi Plant Technologies 25
Execution Records : Venezuela - Tacoa DCS

Hitachi Plant Technologies 26


Execution Records : Venezuela - ELEVAL H25

) Construction period: 2005-2006

) Project name: ELEVAL H25 GTG x 1 units

) Owner : ELEVAL

) Purchaser: Hitachi Ltd (Mitsui & Co., ltd)

) Site: VALENCIA

) HPC & VHPC’s scope

- Installation and electrical works

- Foundation work

- Inland transportation and material supply

Hitachi Plant Technologies 27


Execution Records : Venezuela - ELEVAL H25

Hitachi Plant Technologies 28


Execution Records : Japan

ISOGO FUTTSU
600 MW Coal Fired Futtsu Power Station
Turbine Generator 1520MW Combined Cycle
System Installation
(Maker: Hitachi, Ltd.)
(Maker: Fuji – Siemens)
Completed in Year 2003
Completed in Year 2002

Hitachi Plant Technologies 29


Execution Records:Combined Cycle Plant in
Japan:Overview

Kanden/Himeji 6 (670MW C/C)1996

Chugokuden/Yanai 1 (700MW C/C)1992
          2 (700MW C/C)1996 Toden/Chiba 2 (720MW C/C)2000

Toden/Futtsu 2(1000MW C/C)1988 
     Futtsu 3(1520MW C/C) 2005

Toden/Yokohama 8 (1400MW C/C)1998

Chubuden/Kawagoe 3 (1650MW C/C)1996
Kyusyuden/Shinoita 1 (690MW C/C)1991
           3 (700MW C/C) 1998

Hitachi Plant Technologies 30


Execution Records:Shin-Oita CC Plant

Chipping Work for Sole Plates

Hitachi Plant Technologies 31


Execution Records:Shin-Oita CC Plant

Contact Check for Sole Plate Pads

Hitachi Plant Technologies 32


Execution Records:Shin-Oita CC Plant

Handling of Condenser Lower Shell

Hitachi Plant Technologies 33


Execution Records:Shin-Oita CC Plant

Gas Turbine Lift-up with Lifting Jack

Hitachi Plant Technologies 34


Execution Records:Shin-Oita CC Plant

Installation done by
Lifting Jack

Hitachi Plant Technologies 35


Execution Records:Shin-Oita CC Plant

Gas Turbine Setting Completed

Hitachi Plant Technologies 36


BOP: Air Pollution Control System

) Dry and Wet Type Electrostatic Precipitators


) Moving-Electrode Type Electrostatic
) Harmful Gas Removal Units
(Including Hydrogen Chloride Gas)
) Fuel Gas Temperature Regulators
) Ash & Dust Conveying Systems
) Precipitators
) Bag Filters

Senoko Power Station


Singapore (Electrostatic Precipitator)
Hitachi Plant Technologies 37
ISO certificate & QC

Hitachi Plant Technologies 38


Our Advantages: Benefits to Customer
Our Advantages Benefits to Customer
Cost
‹ Wide Range of Work Scope
‹ Accumulated Project Knowledge & Experience
‹ Advanced Construction Technology Minimum
Minimum
‹ Global Networks Cost
Cost
‹ Skillful Human Recourses
‹ Pre-engineering Service

Schedule
‹ Advanced Project Management
‹ Systematic Schedule Management On
OnTime
Time
‹ Interface management with Other Parties

Reliability
‹ Long-term Experience
‹ Sound financial background Total
TotalSatisfaction
Satisfaction
‹ QA/QC, Safety Policy

Hitachi Plant Technologies 39


Pre-Engineering : Benefits to Customers

Engineering
Engineering Procurement
Procurement Construction
Construction

Pre-Engineering
Feed-Back
Feed-Back Service
¾Suggestion of Design for
Benefits  optimizing Erection Work &
 Construction Schedule
¾Realization of Effective
¾Introduction of Advanced
 Construction Schedule
 Erection Technology
¾Reduction of Total Project Cost
¾Assistance of making
 by minimizing Erection Cost
 Documentation for
¾Reduction of Documentation
 construction planning
 Cost
¾Advice of site work
¾Smoothing Site work
 conditions
Hitachi Plant Technologies 40