HPT’s Activity
for
Thermal Power Plants
Hitachi Plant
Technologies, Ltd
July, 2006
Business Area
¾ Gas Turbine
¾ Steam Turbine
¾ Generator
¾ HRSG
¾ Conventional Boiler (Coal,
Oil, Gas)
¾ Combined Cycle
¾ Co-generation Plant etc
Hitachi Plant Technologies 2
Type of Project
) Installation of New Equipment
) Refurbishment
) Overhaul
) Renovation
) Replacement
) Maintenance etc
Hitachi Plant Technologies 3
Scope of Work: Overview
Construction
Materials
Planning Fabrication
Detail
Design
BOP
Engineering Supply
Design
of BOP Spare Parts
Project
Management
Civil &
Field Maintenance Field Building
Work & Repair Work Electrical
Supply of Work
Piping Mechanical
Fabrication &
Work Erection
Materials
Hitachi Plant Technologies 4
Division of Works: Case-1
OWNER
Main Contractor
Supplier HPC
• Main Equipment • M & E Field Wok
• Basic Engineering • BOP Design & Supply
• Detail Eng. / Material Supply
• Civil & Building
Hitachi Plant Technologies 5
Division of Works: Case 2
OWNER
Main Contractor
Supplier HPC
• Main Equipment • M & E Field Wok
• Basic Engineering • Detail Engineering
• BOP Design & Supply • Material Supply
• Civil & Building
Hitachi Plant Technologies 6
Major Mail stone
¾ JAPAN:
- First power plant : year1957
- 250 units constructed in Japan
¾ OVERSEAS:
- First power plant - in India: year 1963
- Erection Experience in over 20 counties
Hitachi Plant Technologies 7
Execution Record in Overseas: Overview
PAKISTAN
CANADA
GTG 16unit &TG:
TG 19 projects:
1,140MW
5,520MW
IRAN JAPAN
GTG 23unit & TG: 83 projects: 41.815MW
600MW Br: 16 projects
BTG: 25 projects
TG:25 projects
KUWAIT
CC: 11 projects
GTG 8 units:
BAHAMA GTG: 6 projects
225 MW
GTG 2unit: 50 MW
EGYPT CHINA
GTG 4units : 100MW BTG:250MW
MEXICO
GTG 7 units & TG: NIGERIA THAILAND
456 MW GTG 6 units & BTG: CC & BTG: 79MW
1,690 MW
CUBA
GTG 3unit & BTG: PHILIPIPINES
229MW TG & Br: 850MW
INDIA
SAUDIARAB IA GTG 2unit, BTG
GTG 10 units: & TG: 200 MW SINGAPORE
VENEZUELA 350 MW GTG 2units, CC,
Br 3units: 1,200MW MALAYSIA TG: 2,650 MW
GTG 7 units:
170MW
TOTAL: 64,000 MW
ARGENTINA
AUSTRALIA
TG 2units: 360MW
GTG 5units, TG & Br: 3,856MW
Hitachi Plant Technologies 8
Execution Records : Overseas
PERU THAILAND
Ilo Thermal Power MAPUTAPHUT
125 MW Power Station 70MW x 2 GT-G
(Marker: Hitachi, Ltd.) (Maker : GE)
Completed in Year 2000 Completed in Year 1997
Hitachi Plant Technologies 9
Execution Records : Overseas
NIGERIA NIGERIA
Lagos Thermal Power Delta Power Station
Boiler/Turbine H25 Gas Turbine 6Unit
Rehabilitation Work (Maker: HITACHI)
(Maker: HITACHI)
Hitachi Plant Technologies 10
Execution Records : Overseas
BAHAMA
Bahama Electricity Co.
25MW x 2 Gas Turbines
(Marker: Hitachi, Ltd.)
Completed in Year 2003
Hitachi Plant Technologies 11
Execution Records : Overseas
BAHAMA
1. Contract Formation: Hitachi
HitachiLtd.
Ltd. Main Equipment Supply
Bahamas
BahamasElectricity
ElectricityCorp.
Corp. Sumitomo
SumitomoCorp.
Corp.
Foundation work,
Hitachi
HitachiPlant
Plant Installation work &
2. Location: Material Supply
Replacement
Replacement of
of GTG
GTG (F5
(F5
class)
class) to
to H25
H25 (25MW)
(25MW)
Hitachi Plant Technologies 12
Major Projects: Overseas
EGYPT
Cairo North 750MW Combined Cycle Power Station
Erection Works
250MW x 2 Gas Turbines and Generators
(Maker: Mitsubishi Heavy Industries)
250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.)
Hitachi Plant Technologies 13
Execution Records: Singapore - Overview
Senoko P.S.
Senoko P.S.No.1~8
No.1~8
120MW×3
120MW×3
250MW×5
250MW×5
Jurong P.S.
Jurong P.S. No.1~4
No.1~4
60MW×4
60MW×4
Tuas stage
Tuas stage 22
Phase2
Phase2 720MW
720MW C/C
C/C
Tuas Stage1No.1,2
Tuas Stage1No.1,2 Sakura
Sakura P.S.
P.S. 800MW
800MW C/C
C/C Seraya
Seraya P.S.
P.S. No.4~6
No.4~6 HPC
HPC
600MW×2
600MW×2 250MW×3
250MW×3 Singapore
Singapore Branch
Branch
Hitachi Plant Technologies 14
Execution Records: Singapore - Tuas
SINGAPORE
Tuas Stage I 600 MW x Tuas Stage II 360 MWx2
2ST-G (Maker:Hitachi,Ltd.) Combined Cycle Power Station
Completed in Year 1999 (Maker: Mitsubishi Heavy Industries)
Hitachi Plant Technologies 15
Execution Records in Australia STANWELL:
1,400MW(350MW×4)
Maker: Hitachi,Ltd.
Completed in year 1996
TARONG:
1400MW(350MW×4)
MUNGARRA:
Maker: Hitachi,Ltd. TARONG NORTH:
37MW (F6×1)
Completed in year 1988 450MW(450MW×1)
Maker: Hitachi,Ltd.
Maker: Toshiba,Ltd.
Completed in year
Completed in year 2002
1989
BRISBANE
MELBOURNE SYDNEY
PERTH
LOY YANG B:
PINJAR: KALGOORIE: 1,000MW(500MW×2)
37MW (F6×1) 37MW (F6×1) Maker :Hitachi,Ltd.
Maker : Hitachi,Ltd. Maker: Hitachi,Ltd. Completed in year 1996
Completed in year 1990 Completed in year 1989
Hitachi Plant Technologies 16
Execution Records: Australia- Queensland
Tarong Power Station
350MW x 4 Steam Turbines
(Maker: Hitachi, Ltd.)
Completed in Year 1988
Hitachi Plant Technologies 17
Execution Records: Australia- Queensland
Tarong North Power Station
450MW x 1 Steam Turbines
(Maker: Toshiba, Ltd.)
Completed in Year 2002
Hitachi Plant Technologies 18
Execution Records: Australia- Queensland
Stanwell Power Station
350MW x 4 TG & Auxiliaries
(Maker: Hitachi, Ltd.)
Completed in Year 1996
Hitachi Plant Technologies 19
Execution Records: Australia- Victoria
Loy Yang ‘B’:
500MW x 2 TG & Auxiliaries
(Maker: Hitachi, Ltd.)
Completed in Year 1996
Hitachi Plant Technologies 20
Execution Records: Australia- Western
Australia
- Mungarra : 37MW x 1 F6 Gas Turbine
(Maker: Hitachi, Ltd.) Completed in year 1989
- Kalgoorlie: 37MW x 1 F6 Gas Turbine
(Maker: Hitachi, Ltd.) Completed in year 1989
- Pinjar: 37MW x 1 F6 Gas Turbine
(Maker: Hitachi, Ltd.) Completed in year 1990
Hitachi Plant Technologies 21
Execution Records: Kogan Creek 750MW (
under construction)
) Project Name: Kogan Creek Power plant 750MW coal
fired power station
) Location: Queensland, Australia
) Owner: CEPA(Kogan Creek)Holding Pty Ltd.
) Manufacture: SIEMENS Ltd. Australia
) Scope of our work: Installation work
) Date of Contract: Aug 2005
) Date of Completion: Aug, 2007
Hitachi Plant Technologies 22
Execution Records: Australia
) Waste Water Treatment Plant for Sydney Metropolitan
Waste Disposal Authority
) Major overhaul of Tarong U1 Turbine
) Refurbishment and re-commissioning of Swankbank
‘A’ Sootblowers
) Electrical & instrumentation for retrofit of precipitators
fabric filter plant Swankbank ‘B’.
) Cabling, light & power services for Callide ‘A’ re-
powering
Hitachi Plant Technologies 23
Execution Records : Venezuela - CADAFE
) 1978– 1984
) PLANTA CENTRO THERMAL POWER STATION UNITS 3 & 4,
and Unit 5
) Owner: COMPAÑÍA ANONIMA DE ADMINISTRACION Y
FOMENTO (CADAFE)
) Unit:3 & 4: Installation of Two 1400 Ton/Hour Boilers and
Associated equipment for 400 MW generating Units No 3 & 4,
AFE including erection of Steel Structures of the Boilers.
) Unit 5: Installation of 1,400 Ton/Hour boiler for 400 MW
generation unit.
Hitachi Plant Technologies 24
Execution Records : Venezuela - Tacoa DCS
) Construction period: 2004-2005
) Project Name: Tacoa Power plant unit 7, 8 & 9 - DCS (Distributed
digital controls) project
) Owner: La Electricidad de Caracas (EDC)
) Purchaser: Toshiba Corporation (Mitsui & Co., ltd)
) Site: Caracas
) HPC & VHPC’s scope
- Installation and electrical works
- Supply of cables & materials
Hitachi Plant Technologies 25
Execution Records : Venezuela - Tacoa DCS
Hitachi Plant Technologies 26
Execution Records : Venezuela - ELEVAL H25
) Construction period: 2005-2006
) Project name: ELEVAL H25 GTG x 1 units
) Owner : ELEVAL
) Purchaser: Hitachi Ltd (Mitsui & Co., ltd)
) Site: VALENCIA
) HPC & VHPC’s scope
- Installation and electrical works
- Foundation work
- Inland transportation and material supply
Hitachi Plant Technologies 27
Execution Records : Venezuela - ELEVAL H25
Hitachi Plant Technologies 28
Execution Records : Japan
ISOGO FUTTSU
600 MW Coal Fired Futtsu Power Station
Turbine Generator 1520MW Combined Cycle
System Installation
(Maker: Hitachi, Ltd.)
(Maker: Fuji – Siemens)
Completed in Year 2003
Completed in Year 2002
Hitachi Plant Technologies 29
Execution Records:Combined Cycle Plant in
Japan:Overview
Kanden/Himeji 6 (670MW C/C)1996
Chugokuden/Yanai 1 (700MW C/C)1992
2 (700MW C/C)1996 Toden/Chiba 2 (720MW C/C)2000
Toden/Futtsu 2(1000MW C/C)1988
Futtsu 3(1520MW C/C) 2005
Toden/Yokohama 8 (1400MW C/C)1998
Chubuden/Kawagoe 3 (1650MW C/C)1996
Kyusyuden/Shinoita 1 (690MW C/C)1991
3 (700MW C/C) 1998
Hitachi Plant Technologies 30
Execution Records:Shin-Oita CC Plant
Chipping Work for Sole Plates
Hitachi Plant Technologies 31
Execution Records:Shin-Oita CC Plant
Contact Check for Sole Plate Pads
Hitachi Plant Technologies 32
Execution Records:Shin-Oita CC Plant
Handling of Condenser Lower Shell
Hitachi Plant Technologies 33
Execution Records:Shin-Oita CC Plant
Gas Turbine Lift-up with Lifting Jack
Hitachi Plant Technologies 34
Execution Records:Shin-Oita CC Plant
Installation done by
Lifting Jack
Hitachi Plant Technologies 35
Execution Records:Shin-Oita CC Plant
Gas Turbine Setting Completed
Hitachi Plant Technologies 36
BOP: Air Pollution Control System
) Dry and Wet Type Electrostatic Precipitators
) Moving-Electrode Type Electrostatic
) Harmful Gas Removal Units
(Including Hydrogen Chloride Gas)
) Fuel Gas Temperature Regulators
) Ash & Dust Conveying Systems
) Precipitators
) Bag Filters
Senoko Power Station
Singapore (Electrostatic Precipitator)
Hitachi Plant Technologies 37
ISO certificate & QC
Hitachi Plant Technologies 38
Our Advantages: Benefits to Customer
Our Advantages Benefits to Customer
Cost
Wide Range of Work Scope
Accumulated Project Knowledge & Experience
Advanced Construction Technology Minimum
Minimum
Global Networks Cost
Cost
Skillful Human Recourses
Pre-engineering Service
Schedule
Advanced Project Management
Systematic Schedule Management On
OnTime
Time
Interface management with Other Parties
Reliability
Long-term Experience
Sound financial background Total
TotalSatisfaction
Satisfaction
QA/QC, Safety Policy
Hitachi Plant Technologies 39
Pre-Engineering : Benefits to Customers
Engineering
Engineering Procurement
Procurement Construction
Construction
Pre-Engineering
Feed-Back
Feed-Back Service
¾Suggestion of Design for
Benefits optimizing Erection Work &
Construction Schedule
¾Realization of Effective
¾Introduction of Advanced
Construction Schedule
Erection Technology
¾Reduction of Total Project Cost
¾Assistance of making
by minimizing Erection Cost
Documentation for
¾Reduction of Documentation
construction planning
Cost
¾Advice of site work
¾Smoothing Site work
conditions
Hitachi Plant Technologies 40