Branch Losses Summary Report (Max. Loading) : Location: Project: Date
Branch Losses Summary Report (Max. Loading) : Location: Project: Date
Project: Page: 1
12.6.0H
Location: Date: 07-08-2018
Contract: SN:
Engineer: Revision: Base
Study Case: OCP
Filename: PELATIHAN 2018 Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
TRAFO II 1.134 0.069 -1.134 -0.064 0.1 5.4 100.0 100.0 0.04
SKTM MLG KOTA 1.134 0.064 -1.134 -0.067 0.1 -3.1 100.0 100.0 0.01
Line1 1.134 0.067 -1.130 -0.069 4.1 -1.5 100.0 99.6 0.39
Line3 1.068 0.029 -1.066 -0.031 2.2 -1.2 99.6 99.4 0.21
WAAA 0.062 0.039 -0.061 -0.038 1.2 1.8 99.6 96.9 2.69
Line2 -0.841 0.089 0.848 -0.101 6.9 -11.6 98.7 99.4 0.68
Line5 0.841 -0.089 -0.818 0.052 22.9 -36.9 98.7 96.3 2.35
Line6 0.218 0.131 -0.218 -0.133 0.0 -1.4 99.4 99.3 0.03
WAAA1 -0.060 -0.037 0.062 0.039 1.2 1.8 96.6 99.3 2.68
Line7 0.156 0.094 -0.156 -0.095 0.0 -1.4 99.3 99.3 0.02
WAAA2 -0.060 -0.037 0.062 0.039 1.2 1.8 96.6 99.3 2.68
Line10 0.095 0.056 -0.095 -0.057 0.0 -1.4 99.3 99.3 0.01
Line11 0.063 0.038 -0.063 -0.039 0.0 -1.4 99.3 99.3 0.01
WAAA4 -0.141 -0.087 0.144 0.092 2.9 4.3 92.5 95.1 2.62
Line13 -0.807 0.035 0.818 -0.052 11.4 -17.3 95.1 96.3 1.23
Line14 0.663 0.416 -0.663 -0.417 0.3 -0.8 95.1 95.0 0.07
WAAA5 -0.281 -0.174 0.287 0.183 5.7 8.5 92.4 95.0 2.62
WAAA6 -0.282 -0.174 0.287 0.183 5.7 8.6 92.4 95.0 2.62
Line15 0.375 0.234 -0.375 -0.235 0.1 -1.1 95.0 95.0 0.05
Line16 0.088 0.052 -0.088 -0.053 0.0 -1.3 95.0 95.0 0.01
Line17 0.059 0.035 -0.059 -0.036 0.0 -1.3 95.0 95.0 0.01
66.0 -49.7