Details Works Executed For JVVNL

The document summarizes details of works executed by Star Rising Energy Pvt. Ltd. over the last 5 financial years for various ordering authorities. It lists 14 projects with descriptions of works, work order details including numbers, dates and amounts. It provides timelines for each including stipulated completion periods and actual start and end dates. Values of works executed each financial year are also listed.

Uploaded by

priyanka236
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views4 pages

Details Works Executed For JVVNL

The document summarizes details of works executed by Star Rising Energy Pvt. Ltd. over the last 5 financial years for various ordering authorities. It lists 14 projects with descriptions of works, work order details including numbers, dates and amounts. It provides timelines for each including stipulated completion periods and actual start and end dates. Values of works executed each financial year are also listed.

Uploaded by

priyanka236
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Bidder’s Name & Address : Star Rising Energy Pvt. Ltd., 75, Link Road, Opp.

New Grain Mandi S.C. Road, Jaipur


Details Works Executed last Five financial years
Order Description of Work Order Stipulated Date of Date of Value of Work actually executed ( as per completion Certificate)during Remarks
awarding works Completion commence- actual last
Authority Period ment completion FY 2010-11,2011-12,2012-13,2013-14& 2014-15
No.& Amount 2010- 2011-12 2012-13 2013-14 2014-15 TOTAL
Date (Rs. In Lac.) 11
RHB Electrification RE/Electrical/WO 2197929.55 15.11.2011 16.08.11 16.08.12
/Street Light /2011-12/410/
28.07.2011

RHB Electrification RE/Electrical/WO/ 4843344.67 15.11.2011 16.08.11 13.12.11


/Street Light 2011-12/411/
28.07.2011

RHB Electrification RE/Electl/WO/ 537532.75 30.04.2012 01.03.12 01.03.13


/Street Light 2011-12/1088/
13.02.2012

UIT Electrification UIT/Acctts/works 1953899.86 15.01.2012 25.08.11 15.01.12


EWS quarters in /6577/11
Budh Vihar Dt.29.07.2011

UIT Electrification UIT/Acctts/works 1234801.18 07.10.2011 25.08.11 01.11.11


EWS quarters in /6583/11
Arawali Vihar Dt.29.07.2011
UIT Electrification UIT/Acctts/works 4788236.04 12.01.2012 25.08.11 12.01.12
EWS quarters in /6857/11
Arawali Vihar Dt.29.07.2011
EIL Erection and EIL/RJ/kannoi 66055845.00 25.03.2012 25.01.12 30.03.12
supply 33 kV line /JSM/10.01/
10.1.2012

RSRDC Shifting works of RD/JP/ELECT.III 5953512.24 11.04.13 12.12.12 08.10.13


HT/LT Lines on /2012-13/31
kekri - deoli road Dtd. 12.12.2012
Value of Work actually executed ( as per completion Certificate)during
Order Work Order Stipulated Date of Date of last Remarks
Description of FY 2010-11,2011-12,2012-13,2013-14& 2014-15
awarding Completion commence- actual
works
Authority No.& Amount Period ment completion 2010- 2011-12 2012-13 2013-14 2014-15 TOTAL
Date (Rs. In Lac.) 11
JDVVNL Erection and JDVVNL/SE (TW) 141890528.02
supply 11 & 33 /S/F TN-TW-157/
kV line WONO.52/
ERECTION/D2560 Dtd.
13.11.13
& JDVVNL/SE (TW)
/S/F TN-TW-157/
WO O.51/Supply
/D2559 Dtd. 13.11.13
JDVVNL Erection and Supply & Erection of 3 42200000
supply 11 & 33 phase 4 line on 8 Mtr
kV line
PCC pole with ACSR
RABBIT Cond. length of
line 7.75 KM Aprox.
With span 40 Mtr R-
APDRP scheme of
CHURU city order
No.JdVVNL /SE(TW)/TN-
TW-157 D.WO No.52
/Erection /D.2560 and
supply wo No.51
D.2559 dt 13.11.2013

JVVNL Rural supply and 275200000


Electricity execute/complete the
infrastructure erection work of
for House “Providing of Rural
hold Electricity infrastructure
electrification for House hold
electrification of works
in selected blocks under
Rajiv Gandhi Grameen
Vidhyutikaran Yojna
schemes on turnkey
basis in Sawai
Madhopur (Lot-1)order
no.JPD/SE(TW)
/XEN(TW-II) TN-
302./STAR/D.647 dated
02.06.2015

JVVNL Rural supply and 217700000


Electricity execute/complete the
infrastructure erection work of
for House “Providing of Rural
hold Electricity infrastructure
electrification for House hold
electrification of works
in selected blocks under
Rajiv Gandhi Grameen
Vidhyutikaran Yojna
schemes on turnkey
basis in Sawai
Madhopur (Lot-II)order
no.JPD/SE(TW)/XEN(TW-
II)TN-303./STAR/D.648
dated 02.06.2015
MPPKVVCL Feeder for execution of 461428502
Separation Madhya Pradesh Poorva
Project Kshetra Vidyut Vitran
Company Ltd.- 11 KV
Feeder Separation
Project of Chhindwara
(East) District (Lot No.-
16R) PO NO.
SREPL/NCPL-
JPR/MPPKVVCL-
Chhindwara FSP-Lot-
16R/2016-17/01 Dated
01.09.2016
JDVVNL Rural for Rural Electrification 729888004
Electrification works of Baytoo block
works of Barmer District in
Jodhpur PO No.
JdVVNL/SE
(DDUGJY)/S.XEN
(DDUGJY) TNTW-
360/WO-
l98/5upply/D.4199
dtd.22.03.2017 and
D.4200
dtd.22.03.2017