PROJECT :PROPOSED G+6+GYM RESIDENTIAL BLDG. SUMMARY OF LOAD AREA :AL WARQAA - 1
CONSULTANT :
SR. CIRCUIT SP/ RATING-AMPS FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP ACB MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT
DB NO. KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
OUTGOING
1 LV PANEL 4P 2500A 65 2*1C*150 464,22 463,61 465,17 1393,00 42 1 2400/5 check meter
MDB - CONNECTED TO : DEWA LVDB/TRANSF. TOTAL CONNECTED LOAD PER PHASE 464,22 463,61 465,17
DEMAND FACTOR: 0,85 KW MA. DEMAND: 1184,1 KW TOTAL CONNECTED LOAD: 1393,00 KW
Type of Meter (Rating of Incomer) : (1) UPTO 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT…………………/…………A
(1 PHASE) (3 PHASE)
PAGE-SCH - 2
PROJECT :PROPOSED G+6+GYM RESIDENTIAL BLDG. SUMMARY OF LOAD AREA :AL WARQAA - 1
CONSULTANT :
SR. CIRCUIT SP/ RATING-AMPS FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECT ED LOAD-KW KWH MET ER REMARKS
NO. FEEDER DBNO: TP ACB MCCB MCB DUT Y SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT
INCOMMER KA mm2 mm2 CABLE (Mtrs.) mm2 KW KW KW KW (1) (2) (3) (4)
L.V PANEL-01 4P 2500A 65 ← BY Utility → 2*1C*150 464,22 463,61 465,17 1393,00 2 1 2400/5 check meter
SMDB-PV-ROOF TOP TP 350A 50 XLPE/SWA/PVC 3CX300 1C x 150 60,00 60,00 60,00 180,00 PV ROOF TOP SYSTEM
OUTGOING
1 SMDB-LL TP 200A 50 XLPE/SWA/PVC 4CX95 1CX50 30,90 30,90 30,90 92,70 6 1
2 SMDB-1F TP 350A 50 XLPE/SWA/PVC 4CX240 1CX120 57,33 57,23 57,24 171,80 6
3 SMDB-2F TP 350A 50 XLPE/SWA/PVC 4CX240 1CX120 57,33 57,23 57,24 171,80 6
4 SMDB-3F TP 350A 50 XLPE/SWA/PVC 4CX240 1CX120 57,33 57,23 57,24 171,80 6
5 SMDB-4F TP 350A 50 XLPE/SWA/PVC 4CX240 1CX120 57,33 57,23 57,24 171,80 6
6 SMDB-5F TP 350A 50 XLPE/SWA/PVC 4CX240 1CX120 57,33 57,23 57,24 171,80 6
7 SMDB-6F TP 350A 50 XLPE/SWA/PVC 4CX240 1CX120 57,33 57,23 57,24 171,80 6
8 SMDB-GYM TP 350A 50 XLPE/SWA/PVC 4CX240 1CX120 57,84 57,83 57,83 173,50
9 SMDB-PUMP TP 300A 50 XLPE/SWA/PVC 4CX185 1CX95 31,50 31,50 31,50 94,50
10 DB-SS SP 32A 50 3CX10 1,50 1,50
11 CAPACITOR BANK TP 1000A 50 XLPE/SWA/PVC 3X4CX300 3X1CX150 450KVAR
MDB - CONNECTED T O : DEWA LVDB/T RANSF. TOTAL CONNECTED LOAD PER PHASE 464,22 463,61 465,17
DEMAND FACTOR: 0,85 MAX. DEMAND: 1184,05 KW TOT AL CONNECT ED LOAD (3 PH) 1393,00 KW
Type of Meter (Rating of Incomer) : (1) UPT O 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT …………………/…………A
(1 PHASE) (3 PHASE)
PAGE-SCH -3
PROJECT :PROPOSED G+6+GYM RESIDENTIAL BLDG. SUMMARY OF LOAD AREA :AL WARQAA - 1
CONSULTANT :
SR. CIRCUIT SP/ RATING-AMPS FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP ACB MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT
MDB - CONNECTED T O : DEWA LVDB/T RANSF(1) TOTAL CONNECTED LOAD PER PHASE 30,90 30,90 30,90
92,70
SMDB-CONNECT ED T O: MDB(1) TOTAL CONNECTED LOAD 3 PHASE 6 1 TOTAL
DEMAND FACTOR: 0,9 KW MA. DEMAND: 83,43 KW TOTAL CONNECTED LOAD: 92,70 KW
Type of Meter (Rating of Incomer) : (1) UPT O 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT…………………/…………A
(1 PHASE) (3 PHASE)
PAGE-SCH -3
PROJECT :PROPOSED G+6+GYM RESIDENTIAL BLDG. SUMMARY OF LOAD AREA :AL WARQAA - 1
CONSULTANT :
SR. CIRCUIT SP/ RATING-AMPS FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP ACB MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT
MDB - CONNECTED T O : DEWA LVDB/T RANSF(1) TOTAL CONNECTED LOAD PER PHASE 57,33 57,23 57,24
171,80
SMDB-CONNECT ED T O: MDB(1) TOTAL CONNECTED LOAD 3 PHASE 6 TOTAL
DEMAND FACTOR: 0,9 KW MA. DEMAND: 154,62 KW TOTAL CONNECTED LOAD: 171,80 KW
Type of Meter (Rating of Incomer) : (1) UPT O 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT…………………/…………A
(1 PHASE) (3 PHASE)
PAGE-SCH -3
PROJECT :PROPOSED G+6+GYM RESIDENTIAL BLDG. SUMMARY OF LOAD AREA :AL WARQAA - 1
CONSULTANT :
SR. CIRCUIT SP/ RATING-AMPS FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP ACB MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT
MDB - CONNECTED T O : DEWA LVDB/T RANSF(1) TOTAL CONNECTED LOAD PER PHASE 57,84 57,83 57,83
173,50
SMDB-CONNECT ED T O: MDB(1) TOTAL CONNECTED LOAD 3 PHASE TOTAL
DEMAND FACTOR: 0,9 KW MA. DEMAND: 156,15 KW TOTAL CONNECTED LOAD: 173,50 KW
Type of Meter (Rating of Incomer) : (1) UPT O 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT…………………/…………A
(1 PHASE) (3 PHASE)
PAGE-SCH -3
PROJECT :PROPOSED G+6+GYM RESIDENTIAL BLDG. SUMMARY OF LOAD AREA :AL WARQAA - 1
CONSULTANT :
SR. CIRCUIT SP/ RATING-AMPS FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP ACB MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT
1 TRANSFER PUMP TP 63A 35 XLPE/SWA/PVC 4CX16 1CX16 6,00 6,00 6,00 18,00 30mA ELCB
2 SUMP PUMP TP 40A 35 XLPE/SWA/PVC 4CX10 1CX10 0,50 0,50 0,50 1,50 30mA ELCB
3 FIRE PUMP TP 250A 35 XLPE/SWA/PVC 4CX150 1CX70 25,00 25,00 25,00 75,00 ELS+SHUNT+ALARM
MDB - CONNECTED T O : DEWA LVDB/T RANSF(1) TOTAL CONNECTED LOAD PER PHASE 31,50 31,50 31,50
94,50
SMDB-CONNECT ED T O: MDB(1) TOTAL CONNECTED LOAD 3 PHASE TOTAL
Type of Meter (Rating of Incomer) : (1) UPT O 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT…………………/…………A
(1 PHASE) (3 PHASE)
PAGE-SCH -3
PROJECT :PROPOSED G+6+GYM RESIDENTIAL BLDG. SUMMARY OF LOAD AREA :AL WARQAA - 1
CONSULTANT :
SR. CIRCUIT SP/ RATING-AMPS FAULT PVC/XLPE CABLE SIZE LENGTH ECC CONNECTED LOAD-KW KWH METER REMARKS
NO. FEEDER TP ACB MCCB MCB DUTY SWA/PVC 2/4 x 1C 2/3/4C OF SIZE-1C R-PHASE Y-PHASE B-PHASE TOTAL 1 Ph 3 Ph 3 Ph LV/HV CT
1 ST RING INVERT ER-01 TP 125 35 XLPE/SWA/PVC 3CX50 1CX25 20,00 20,00 20,00 60,00 30mA ELCB
2 ST RING INVERT ER-02 TP 125 35 XLPE/SWA/PVC 3CX50 1CX25 20,00 20,00 20,00 60,00 30mA ELCB
3 ST RING INVERT ER-03 TP 125 35 XLPE/SWA/PVC 3CX50 1CX25 20,00 20,00 20,00 60,00 30mA ELCB
MDB - CONNECTED T O : DEWA LVDB/T RANSF(1) TOTAL CONNECTED LOAD PER PHASE 60,00 60,00 60,00
180,00
SMDB-CONNECT ED T O: MDB(1) TOTAL CONNECTED LOAD 3 PHASE TOTAL
Type of Meter (Rating of Incomer) : (1) UPT O 60A (2) UPTO 100A (3) 125 - 160A (4) LV CT / HV CT…………………/…………A
(1 PHASE) (3 PHASE)