0% found this document useful (0 votes)
59 views1 page

01 Quality Objectives Summary

This document is a quality objectives action plan summary for a department in 2009. It lists 5 quality objectives with details on the target, action plan, responsibilities, and timeline to achieve each objective. The status of completing the action plan for each objective is monitored on a scale of 0-25%, 26-50%, 51-75%, and 76-100%. The summary is prepared by a quality engineer, reviewed by the quality assurance manager, and approved by the department manager.

Uploaded by

Helton Mota
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views1 page

01 Quality Objectives Summary

This document is a quality objectives action plan summary for a department in 2009. It lists 5 quality objectives with details on the target, action plan, responsibilities, and timeline to achieve each objective. The status of completing the action plan for each objective is monitored on a scale of 0-25%, 26-50%, 51-75%, and 76-100%. The summary is prepared by a quality engineer, reviewed by the quality assurance manager, and approved by the department manager.

Uploaded by

Helton Mota
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

<Company Name>

Quality Objectives Action Plan Summary 2009


<Dept. Name>

Current Update:

Summary of Target Monitoring Status (% completion)


Action Plan Responsible
Sr. Objectives Target Date Achievements
(How) (Who) 0 – 25% 26-50% 51-75% 76-100%
(What, Why, Where) (When)

1.

2.

3.

4.

5.

ACHIEVED PENDING
Prepared By: Reviewed By: Approved By:

________________________ _______________________ _______________________


Sr. QA Engineer QAM Dept. Manager

QF750-1-7A – Quality Objectives Summary


Issue: 1 Rev: 0 Page 1 of 1