NDP KMR Terminal B
Underground Piping Modification Project NDP SHELL
Misc Civil Works at NDP
Construction Of Treench NDP
Dimensions (meter) Quantity
No's of
S.No Discription Dia of bar C/C Nos Total Unit Total Shapes
bars Length Lengt Weigh kg
Weight
h t
1 Trench BBS At NDP
Footing main bar T/B & Both way 1/2" 150mm 13 2 24 624 0.302 188.45 kg 6" 6"
23'
2 Footing dist. bar T/B & Both way
1/2" 150mm 2 44 6.25 550 0.302 166.1 kg 6" 6"
5'3"
3 Vertical bar long wall side
1/2" 150mm 2 47 6.58 618.5 0.302 186.79 kg
4'7"
2'
4 5"
Vertical bar long wall inside 1/2" 150mm 2 47 5.42 509.5 0.302 153.86 kg
4'7"
2'
5
Vertical bar foam tank wall inside 1/2" 150mm 2 12 6.08 145.9 0.302 44.068 kg
. 4'7"
6 5''
Vertical bar foam tank wall side 1/2" 150mm 2 12 4.92 118.1 0.302 35.66 kg
. 4'2''
2'
7
Horizontal Bar Long wall Both ways
1/2" 150mm 2 19 20.17 766.5 0.302 231.47 kg
25'
8
Horizontal Bar Foam Tank wall 1/2" 150mm 2 19 6 228 0.302 68.856 kg 6" 6"
5'
9 Steel Chairs For Double Mesh 2'
1/2" 300mm 6 5 7 210 0.302 63.42 kg
6" 6"
2' 2'
10 Trench Pipe Support
Vertical Bar 1/2" 150mm 18 2 2.75 99 0.302 29.898 kg
9"
2'
11 Trench Support
Horizontal Bar 1/2" 150mm 4 2 6 48 0.302 14.496 kg 6" 6"
5'
12 Steel Used For Anchor Lugs in
Plates & Grating Angle
1/2" 800mm 8 8 1.5 96 0.302 28.992 kg 1'6"
Total weight kg
1212.1