0% found this document useful (0 votes)
61 views1 page

Daily Report PDF

National Technical Services submitted a final excavation progress report to Shell NDP Terminal B near a warehouse. The report describes the excavation work completed by National Technical Services for Shell Pakistan Limited. It was reviewed by a site engineer and signed by a representative of National Technical Services.

Uploaded by

hafiz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views1 page

Daily Report PDF

National Technical Services submitted a final excavation progress report to Shell NDP Terminal B near a warehouse. The report describes the excavation work completed by National Technical Services for Shell Pakistan Limited. It was reviewed by a site engineer and signed by a representative of National Technical Services.

Uploaded by

hafiz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1

NATIONAL TECHNICAL SERVICES


Final Excavation Progress Report (DPR)
Client Name SHELL NDP TERMINAL B Review BY site engineer
Project Name WATCH TOWER Date: 12/9/2018
Project Location NEAR WARE HOUSE Report NO:

Description of Work

NATIONAL TECHNICAL SERVICES SHELL PAKISTAN LIMITED


Name:
Designation:
Signature: