Turkish State Railways (TCDD) : Infrastructure Development & Regulations in Railway Sector

The document discusses the historical development, current state, key projects, and vision 2023 of the Turkish State Railways (TCDD). It outlines that TCDD was established in 1927 and has expanded the railway network from 4,136 km to over 12,000 km today. The key projects mentioned include the first high speed rail line completed in 2009 and ongoing expansion projects. The vision is to further develop transportation corridors connecting Turkey to Europe, Asia, the Middle East and North Africa by 2023.

Uploaded by

임동우
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
175 views32 pages

Turkish State Railways (TCDD) : Infrastructure Development & Regulations in Railway Sector

The document discusses the historical development, current state, key projects, and vision 2023 of the Turkish State Railways (TCDD). It outlines that TCDD was established in 1927 and has expanded the railway network from 4,136 km to over 12,000 km today. The key projects mentioned include the first high speed rail line completed in 2009 and ongoing expansion projects. The vision is to further develop transportation corridors connecting Turkey to Europe, Asia, the Middle East and North Africa by 2023.

Uploaded by

임동우
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 32

Ministry of Transport, 

Maritime Affairs and Communications

TURKISH STATE RAILWAYS (TCDD)
Infrastructure Development & Regulations in Railway Sector

1
CONTENTS

Historical Development

State of Play

Key Projects

Vision 2023

The Law on Liberalization of Rail Transport in Turkey
CONTENTS

Historical Development

State of Play

Key Projects

Vision 2023

The Law on Liberalization of Rail Transport in Turkey
HISTORICAL DEVELOPMENT OF RAILWAYS
10 million passengers were transported. «The Law on Liberalization of Rail Transport in Turkey»
YEAR 2013 entered into force on 1st May 2013

YEAR 2009
The first high speed
YEAR 2008 The first high speed line was completed. line were completed.

Total length of railways:


YEAR 2004 Total length of railways increased to 10.991 km and 6 of our 10.991 km
ports were included in the privatisation programme.

YEAR 2003 Rail transport operations were opened to private sector. Rail transport operations
were opened to private sector.
Became a Public Economic
YEAR 1984 Became a Public Economic Institution. Institutiıon

Became a State Economic


YEAR 1953 Became a State Economic Enterprise. Enterprise

Total length of railways reached to Total length of railways:


YEAR 1950 9.204 km
9.204 km.

General Administration of Ports were attached to


YEAR 1927 State Railways and Ports. the Railways
(5.500 km)
4.000 km long railways
YEAR 1924 Nationalization were nationalised
of the Railways

YEAR 1856 The first railway construction between İzmir-


Aydin
HISTORICAL DEVELOPMENT OF RAILWAYS

EDİRNE
ZONGULDAK

SAMSUN
İSTANBUL KARS

ERZURUM
BANDIRMA
ANKARA ERZİNCAN
BURSA ESKİŞEHİR SİVAS

POLATLI

AFYON
ELAZIĞ
TATVAN VAN
İZMİR KAYSERİ

MALATYA
KONYA DİYARBAKIR

ADANA GAZİANTEP

MERSİN

2012 : 12,008 km ( Conventional+ High Speed)   

Rail Network before the REPUBLIC 4,136 km Mainline


The First Years of the REPUBLIC (1923-1950) 3,764 km Mainline (avg. 134 km per annum)
From 1951 to 2002 945 km Mainline (avg. 18 km per annum)
From 2005 to end of 2012 1,094 km Mainline (avg. 137km per annum)
Lines under construction 3,400 km Mainline
CONTENTS

Historical Development

State of Play

Key Projects

Vision 2023

The Law on Liberalization of Rail Transport in Turkey
ORGANIZATION

İSTANBUL
SAMSUN
ÇAMAF
TÜVASAŞ
H.PAŞA
ADAPAZARI ÇANKIRI
DERİNCE
EUROTEM VADEMSAŞ
BANDIRMA ANKARA
ESKİŞEHİR TÜDEMSAŞ
TÜLOMSAŞ SİVAS
SİVAS BT TRV
ADF
SİTAŞ
AFYON
İZMİR
MALATYA
IZBAN
İZMİR
AFYON BT TRV
KONYA

ADANA

MERSİN

İSKENDERUN Conventional Lines
High Speed Lines 

8 REGIONAL DIRECTORATES İSTANBUL, ANKARA (2 Directorates), İZMİR, SİVAS, MALATYA, ADANA, AFYON

7 PORTS H.PAŞA, DERİNCE, İZMİR,(MERSİN, İSKENDERUN, SAMSUN and BANDIRMA  privatized.)

3 AFFILIATED COMPANIES TÜLOMSAŞ, TÜVASAŞ, TÜDEMSAŞ

4  PARTICIPATIONS EUROTEM, İZBAN, VADEMSAŞ, SİTAŞ 4 Participations have been established since 2003. 

5 FACTORIES ADF and RAIL WELDING, AFYON and  SİVAS CONCRETE SLEEPER, ÇAMAF
CONTENTS

Historical Development

State of Play

Key Projects

Vision 2023

The Law on Liberalization of Rail Transport in Turkey
RAIL INVESTMENTS
Million 
TL 
7.929
8.000
6.854
7.000

6.000
4.843
5.000 4.558

4.000

3.000 2.350
2.184 2.281
2.000 1.460
964 1.060
1.000 488

0
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

While the appropriation allocated for railways were 488 million TL in 2003, it reached

7 billion 929 million TL in 2013 increasing by 16 times.


TRANSPORTATION CORRIDORS 
(PROJECTED)
Istanbul‐Basra, Istanbul‐Kars‐Tbilisi‐Baku, Kavqaz‐Samsun‐Basra, 
Istanbul‐Aleppo‐Makkah, Istanbul‐Aleppo‐the North Africa/the South East Asia 
transportation corridors will be developed.

Far East Asia

The Central and North Asia

Samsun‐Kavqaz

Kars‐Tbilisi‐Baku

Marmaray
Lake Van Crossing
Tekirdağ‐Muratlı
Kurtalan‐ Nusaybin‐ Iraq
Kars‐Nahcevan‐Iran

South East Asia
North Africa
The Middle East
MARMARAY PROJECT
1. The Bosphorus Crossing (BC1)
–Immersed tube tunnel (1,4 km), Üsküdar
–Immersed tube depth is 60 m,
–12 km bored tunnels & cut-cover tunnels,
–4 new stations.

2. The Upgrading of the Commuter Rail


(CR1/CR3)
– New high standard triple track line (~ 65 km),
– 37 new stations.

3. Procurement of new Rolling Stocks Sirkeci


(CR2)
– 440 new train sets.
Ayrılıkçeşm
e

Yenikapı

Total length : Approx. 77 km
– At grade, European side 19.6 
km 
– At grade, Asian side 43.4 km
Kazlıçeşme – Bored tunnels 12.2 km
– Immersed tube tunnel 1.4 km
Marmaray (Ayrılıkçeşme-Kazlıçeşme) was commissioned on 29th October 2013. The line and
station renewal works are ongoing on Pendik-Söğütlüçeşme and Kazlıçeşme–Halkalı sections.
MARMARAY PROJECT
Inauguration: October 29, 2013
HIGH SPEED RAILWAY NETWORK IS EXPANDING

EDİRNE

ZONGULDAK SAMSUN
İSTANBUL KARS
KARABÜK
TEKİRDAĞ

ÇANKIRI AMASYA
İZMİT

BURSA 105 km ERZURUM


Bandırma
BİLECİK
KIRIKKALE ERZİNCAN
Yenişehir ANKARA
533 km SİVAS
BALIKESİR ESKİŞEHİR

Yerköy 405 km
Polatlı

MUŞ
AFYONKARHİSAR
ELAZIĞ VAN
İZMİR MANİSA 212 km
UŞAK KAYSERİ

NİĞDE MALATYA
624 km
KONYA BATMAN
ISPARTA DİYARBAKIR
K.MARAŞ
AYDIN
DENİZLİ
BURDUR MARDİN

OSMANİYE
GAZİANTEP

KARAMAN
ADANA
MERSİN

Current YHT lines (888 km)
YHT lines under construction
YHT lines with final drawing completed
YHT lines with final drawing under development

High Speed Trains (YHTs) are in operation between Ankara-Eskişehir since 13th March 2009.
High Speed Trains (YHTs) are in operation between Ankara-Konya since 24th August 2011.
High Speed Trains (YHTs) are in operation between Eskişehir-Konya since 23th March 2013.
High Speed Trains (YHTs) will be put into operation between Ankara-Istanbul in 2014.
High Speed Trains will be put into operation in Bursa-Bilecik, Ankara-İzmir and Ankara-Sivas by 2016.
CONVENTIONAL RAILWAY PROJECTS

EDİRNE
Bartın

ZONGULDAK
Muratlı Ereğli
Ispartakule SAMSUN
KARS
KARABÜK
Halkalı İSTANBUL
TEKİRDAĞ Karasu
A.pazarı ÇANKIRI AMASYA
İZMİT Arifiye
Gemlik Pamukov
a ERZURUM
Bandırma
BİLECİK Dilucu
KIRIKKALE
BURSA ANKARA ERZİNCAN
SİVAS
ESKİŞEHİR
BALIKESİR

Enveriye
Tavşanlı Polatlı
Bergam
a
AFYONKARHİSAR
KONVANSİYONEL DEMİRYOLU PROJELERİ 2023 HEDEFİ MUŞ

Aliağa MANİSA ELAZIĞ VAN


İZMİR Palu
Turgutlu UŞAK KAYSERİ

K.paşa Kiraz NİĞDE


Cumaovası MALATYA
Ödemiş
AYDIN KONYA DİYARBAKIR BATMAN
Tepeköy ISPARTA
Tire K.MARAŞ 8

Narlı
DENİZLİ MARDİN
BURDUR

Bahçe
Güllük
Ulukışla A.göze Habur
OSMANİYE Ş.URFA
Nusaybin

Nurdağ

B.pınar
KARAMAN

Toprakkal
ADANA

M.yavuz
e
MERSİN

Constructed lines (153 km)
Lines under construction (978km)
Lines at the phase of construction tender (298 km)
Lines with final drawings produced (202km)
Lines with final drawings in progress (4.038 km)
TRACKS UNDER RENEWAL 
Hudut
Hudut
KIRKLARELİ
KIRKLARELİ

ZONGULDAK
ZONGULDAK
Uzunköprü
Uzunköprü Gelemen
Gelemen
SAMSUN Doğukapı
Doğukapı
SAMSUN
Muratlı
Muratlı
Haydarpaşa
Haydarpaşa Çarşamba
Çarşamba
KARS
KARS
TEKİRDAĞ
TEKİRDAĞ Halkalı
Halkalı
Adapazarı
Adapazarı

Arifiye
Arifiye
Bandırma
Bandırma
P.ova
P.ova
ANKARA
ANKARA Irmak
ESKİŞEHİR Irmak ERZURUM
ERZURUM
ESKİŞEHİR
BALIKESİR
BALIKESİR SİVAS
SİVAS
Nusrat
Nusrat Seyitömer
Seyitömer
ERZİNCAN
ERZİNCAN
Gökçedağ Polatlı
Polatlı
Gökçedağ
Yenifakılı Çetinkaya
Çetinkaya MUŞ
MUŞ
Yenifakılı
Aliağa
Aliağa
AFYON
AFYON
MANİSA ELAZIĞ
ELAZIĞ Kapıköy
MANİSA Kapıköy
Menemen
Menemen Boğazköprü
Boğazköprü Tatvan
Tatvan VAN
KAYSERİ MALATYA VAN
KAYSERİ MALATYA
Çivril
Çivril BATMAN
BATMAN
İZMİR
İZMİR
Ödemiş
Ödemiş
Torbalı Karakuyu
Karakuyu DİYARBAKIR
DİYARBAKIR
Torbalı
KONYA
KONYA Kurtalan
Kurtalan
Ereğli
Ereğli
Söke K.MARAŞ
K.MARAŞ
Söke
DENİZLİ BURDUR Ulukışla
Ulukışla
DENİZLİ BURDUR ISPARTA
ISPARTA

Yenice ADANA
ADANA Nusaybin
Yenice Nusaybin
KARAMAN
KARAMAN
T.kale
T.kale G.ANTEP
G.ANTEP Karkamış
Karkamış
MERSİN
MERSİN

Renewed tracks
Tracks to be renewed

7.261 km tracks were renewed during the last decade.

The total length of tracks to be renewed in 2013 is 1.098 km.

15
SIGNALLED RAILWAY NETWORK IS BECOMING WIDESPREAD

EDİRNE

ZONGULDAK SAMSUN
İSTANBUL KARS
KARABÜK
TEKİRDAĞ
68 km
ÇANKIRI AMASYA
İZMİT 410 km
134 km 495 km
ERZURUM
Bandırma
BİLECİK BAŞKENTRAY
BURSA KIRIKKALE ERZİNCAN
ANKARA
SİVAS
ESKİŞEHİR
BALIKESİR 374 km
183 km
356 km
KÜTAHYA Divriği

MUŞ
Aliağa
70 km AFYONKARHİSAR
ELAZIĞ VAN
İZMİR MANİSA 415 km 410 km
UŞAK KAYSERİ
467 km
C.ovası 67 km MALATYA
NİĞDE
Tepeköy 52 km 176 km 376 km
Selçuk KONYA BATMAN
ISPARTA DİYARBAKIR
K.MARAŞ
Ortaklar AYDIN
DENİZLİ 393 km 581 km
BURDUR 214 km MARDİN

Ulukışla
OSMANİYE
136 km GAZİANTEP 697 km
KARAMAN T.kale
67 km
MERSİN ADANA
İskenderun

Operational signalled lines  ( 3.128 km)
Lines under construction (2.493 km) 
Lines at the phase of construction tender(583 km) 
Lines with final drawings produced (67 km) 
Lines with final drawings in progress (2.998 km)
NEW SIGNALLING SYSTEM IS DEVELOPED

EDİRNE BARTIN

SAMSUN
İSTANBUL Ereğli
Karasu
TRABZON
Kartal
Halkalı Sapanca KARS
ADAPAZARI
Gemlik
BİLECİK
ANKARA
BALIKESİR BURSA ESKİŞEHİR Sincan Yerköy ERZURUM
Polatlı ERZİNCAN
Hanlı
Aliağa ELAZIĞ
MANİSA UŞAK
Turgutlu AFYON
AFYON Boğazköprü
İZMİR KAYSERİ
DİYARBAKIR
Torbalı MALATYA
GONCALI
AYDIN
GONCALI EĞİRDİR
EĞİRDİR KONYA Cizre
MARDİN
Ulukışla ŞANLIURFA
Narlı Nusaybin Habur
Güllük DENİZLİ
IISSP ADANA GAZİANTEP
BBU PAAR Karkamış
UR RTTA Yenice Mürşitpınar
ANTALYA RDDUU A KARAMAN
RR
Manavgat
MERSİN
Alanya
Kamu 
Kamu
HALEP
Sektörü
National Railway Signaling System is developed by the cooperation of ;
¾TCDD Özel
¾TÜBİTAK (The Scientific and Technological research Council of Turkey )
Sektör

¾ İTÜ (Istanbul Technical University)

The signaling project of Afyon-Denizli-Isparta line section (21 stations and 338 km length) will be
achieved by TCDD, TÜBİTAK and İTÜ. This signaling system is aimed to become widespread in
the country.
ELECTRIFIED RAILWAY NETWORK IS BECOMING WIDESPREAD

EDİRNE

ZONGULDAK SAMSUN
İSTANBUL KARS
KARABÜK
TEKİRDAĞ
68 km
ÇANKIRI AMASYA
İZMİT
495 km
134 km 410 km
ERZURUM
Bandırma BAŞKENTRAY
BİLECİK
BURSA KIRIKKALE ERZİNCAN
ANKARA
SİVAS
ESKİŞEHİR
BALIKESİR 374 km
183 km
356 km
KÜTAHYA Divriği
920 km
MUŞ
Aliağa
70 km AFYONKARHİSAR
ELAZIĞ
İZMİR MANİSA
415 km 410 km VAN
UŞAK KAYSERİ

C.ovası 67 km NİĞDE MALATYA


Tepeköy
52 km 552 km
Selçuk KONYA BATMAN
ISPARTA DİYARBAKIR
K.MARAŞ
AYDIN
DENİZLİ 507 km 581 km MARDİN
BURDUR

Ulukışla
OSMANİYE
GAZİANTEP
136 km 67 km
KARAMAN T.kale
KARAMAN ADANA T.kale
MERSİN
ADANA
MERSİN
İskenderun
İskenderun

Operational electrified lines (Current2.328 km) 
Lines under construction(1.446 km) 
Lines at the phase of construction tender(1.289 km)
Lines with final drawings produced( 562 km) 
Lines with final drawings in progress (2.486 km) 
LOGISTIC CENTERS ARE BEING ESTABLISHED

Yeşilbayır/İstanbul Gelemen/Samsun

Kars
Köseköy/İzmit
Halkalı/İstanbul

Bozüyük/Bilecik
Sivas
Gökköy/Balıkesir
Palandöken/Erzurum

Hasanbey/Eskişehi
r
Uşak

Boğazköprü/Kayseri
Kayacık/Konya
Türkoğlu/K.mara Habur
ş Mardin
Kaklık/Denizli

Yenice/Mersin

It is planned to construct 18 Logistics Centers.


5 logistics centers in Samsun, Uşak, Denizli (Kaklık), Köseköy and Halkalı were
put into operation.
The construction works are going on in 6 logistics centers in Eskişehir, Balıkesir,
Bozüyük, Mardin, Erzurum, Mersin (Yenice).
The final drawings and expropriation studies are going on for 7 logistics centers.
CONNECTIONS ARE BEING IMPROVED WITH TRAIN‐FERRY TRAFFIC

Samsun Kavkaz
Poti
Varna

Mersin

Samsun(Turkey)-Kavkaz ( Russia) train ferry line through Black Sea, was


officially put into service on 19th February 2013.
KARS – TBILISI – BAKU PROJECT

GEORGIA
Total Length  : 101 km
Kars ‐ Georgia  : 73 km
Turkey ‐ Ahilkelek : 28 km Construction in Georgia: 29 km Existing Line in Georgia
Construction in Georgia started on
21.11.2007
Construction in Turkey: 76 km
Construction in Turkey started on
24.7.2008 and will be completed in 
TURKEY
2013. 
Existing Line in Turkey

21
PROCUREMENT of NEW FERRIES
To be operated between Tatvan – Van;
2 Ferries with a capacity of 50 wagons along with repairing of landing piers and
construction of warehouse for ferries
The ferries is being manufactured.
Planned to be ready for operation at the end of 2014.

EDİRNE

ZONGULDAK SAMSUN
İSTANBUL KARS
KARABÜK
TEKİRDAĞ

ÇANKIRI AMASYA
İZMİT

BURSA ERZURUM
Bandırma
BİLECİK KIRIKKALE ERZİNCAN
ANKARA
ESKİŞEHİR SİVAS
BALIKESİR

Yerköy
Polatlı

MUŞ
AFYONKARHİSAR
ELAZIĞ VAN
İZMİR MANİSA TATVAN
UŞAK KAYSERİ

NİĞDE MALATYA

KONYA BATMAN
ISPARTA DİYARBAKIR
K.MARAŞ
AYDIN
DENİZLİ
BURDUR MARDİN

OSMANİYE
GAZİANTEP

KARAMAN

MERSİN ADANA

22
RAILWAY CORRIDORS IN OUR REGION
There is a 75‐billion USD transport potential between Europe and Asia.
Istanbul‐Kars‐Tbilisi‐Baku, Nusaybin‐Iraq, Kars‐Nakhchivan‐Iran, Kavkaz‐Samsun‐Basra, 
Istanbul‐Aleppo‐Makkah & Istanbul‐Aleppo‐North Africa  transport corridors are being developed.

The Central & 
Europe North Asia
Samsun‐Kavkaz
Marmaray
Kars‐Tbilisi‐Baku

Tekirdağ‐
Muratlı Kars‐Nakhchivan‐Iran Far East Asia
Lake Van Crossing

Nusaybin‐ Iraq

North Africa The Middle East

South East Asia

After the completion of the railway projects in Turkey, the Silk Road will gain more importance and
Europe, Asia, esp. the Middle East, and the Central and Far East Asia will be interconnected by rail.
THE IMPORTANCE OF R&D IS INCREASING

State

Corporation

R&D

INDUSTRY UNIVERSITY

Manufacture Training

Railway Research and Technology Center, which aims to become bridge


between local industry and universities and implement new technologies is
established within TCDD.
CONTENTS

Historical Development

State of Play

Key Projects

Vision 2023

The Law on Liberalization of Rail Transport in Turkey
VISION 2023 HIGH SPEED LINES

EDİRNE

ZONGULDAK SAMSUN
İSTANBUL KARS
KARABÜK TRABZON
TEKİRDAĞ

ÇANKIRI AMASYA
İZMİT

BURSA ERZURUM
Bandırma
BİLECİK
KIRIKKALE ERZİNCAN
Yenişehir ANKARA
533 km SİVAS
BALIKESİR ESKİŞEHİR

Yerköy 405 km
Polatlı

MUŞ
AFYONKARHİSAR
ELAZIĞ VAN
İZMİR MANİSA 212 km
UŞAK KAYSERİ

NİĞDE MALATYA
624 km
KONYA BATMAN
ISPARTA DİYARBAKIR
K.MARAŞ
AYDIN
DENİZLİ
BURDUR MARDİN

OSMANİYE
GAZİANTEP

KARAMAN
ADANA
MERSİN
Çobanbey

Constructed HSLs (Ankara‐Eskişehir, Ankara‐Konya ‐ 888 km)
HSLs under construction ( 1.748 km) 
HSLs at the stage of construction tender(454 km) 
HSLs with final drawings produced (4.728 km) 
HSLs with final drawings in progress ( 2.212 km)
VISION 2023 CONVENTIONAL LINES

EDİRNE
Bartın

ZONGULDAK
Muratlı Ereğli
Ispartakule SAMSUN
KARS
KARABÜK
Halkalı İSTANBUL
TEKİRDAĞ Karasu
A.pazarı ÇANKIRI AMASYA
İZMİT Arifiye
Gemlik Pamukov
a ERZURUM
Bandırma
BİLECİK Dilucu
KIRIKKALE
BURSA ANKARA ERZİNCAN
ESKİŞEHİR SİVAS
BALIKESİR

Enveriye
Tavşanlı Polatlı
Bergam
a
AFYONKARHİSAR
KONVANSİYONEL DEMİRYOLU PROJELERİ 2023 HEDEFİ MUŞ

Aliağa MANİSA ELAZIĞ VAN


İZMİR Palu
Turgutlu UŞAK KAYSERİ

K.paşa Kiraz NİĞDE


Cumaovası MALATYA
Ödemiş
AYDIN KONYA DİYARBAKIR BATMAN
Tepeköy ISPARTA
Tire K.MARAŞ 8

Narlı
DENİZLİ MARDİN
BURDUR

Bahçe
Güllük
Ulukışla A.göze Habur
OSMANİYE Ş.URFA
Nusaybin

Nurdağ

B.pınar
KARAMAN

Toprakkal
ADANA

M.yavuz
e
MERSİN

Constructed conventional lines (153 km) 
Conventional lines under construction (978km) 
Conventional Lines at the stage of construction tender(298 km)
Conventional Lines with final drawings produced (202km) 
Conventional Lines with final drawings in progress (4.038 )
CONTENTS

Historical Development

State of Play

Key Projects

Vision 2023

The Law on Liberalization of Rail Transport in Turkey
RE‐ORGANISATION OF RAILWAY SECTOR IN TURKEY

DECREE LAW No:655 (in 2011)

¾ Directorate General for Regulation of Railways

9 Regulatory Body

9 Safety Authority

9 Contract Manager for PSO

¾ Accident Search & Investigation Board


For All
¾ DG for Infrastructure Investments Transport
Modes
¾ DG for Regulation of Dangerous Goods and Combined Transport

29
NEW LAW on SECTOR LIBERALIZATION

The  Law  No:  6461  on  Liberalization  of  Rail  Transport in  Turkey  was 
entered into force on 1 May 2013.

Main Objectives:
¾ Restructuring of TCDD as Infrastructure Manager
¾ Establishment of New Railway Undertaking (TCDD Transport JSC)
¾ Opening up of the railway sector for competition
¾ Arrangement of Public Service Obligations
¾ Enabling the private sector to invest in rail infrastructure

Further Needs:
¾ Capacity Improvement for Regulatory Bodies
¾ Elaboration of necessary secondary legislation by Regulatory Bodies
FUTURE RAILWAY SECTOR IN TURKEY

31