BoQ OSP Backbone Phase-2

This document contains a price schedule for an outside plant (OSP) backbone project from Solo to Yogyakarta and Solo to Surabaya. It lists the materials, civil works, installation, and management costs required for the project. The materials listed include fiber optic cable, HDPE pipes, joint closures, termination boxes, markers, racks, and warning tape. Civil works involve handhole construction, trenching, duct installation, reinstatement, boring, crossings, and slumping. Design, survey, project management, transport, testing and as-built drawings are covered under management costs. Unit prices and amounts are not provided for any line items. The total costs are not calculated in the price schedule.

Uploaded by

adeng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
125 views2 pages

BoQ OSP Backbone Phase-2

This document contains a price schedule for an outside plant (OSP) backbone project from Solo to Yogyakarta and Solo to Surabaya. It lists the materials, civil works, installation, and management costs required for the project. The materials listed include fiber optic cable, HDPE pipes, joint closures, termination boxes, markers, racks, and warning tape. Civil works involve handhole construction, trenching, duct installation, reinstatement, boring, crossings, and slumping. Design, survey, project management, transport, testing and as-built drawings are covered under management costs. Unit prices and amounts are not provided for any line items. The total costs are not calculated in the price schedule.

Uploaded by

adeng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

LAMPIRAN 4

5/6

PRICE SCHEDULE
OUTSIDE PLANT (OSP) BACKBONE JAWA
SECTION: SOLO ‐ YOGYAKARTA

NO. DESCRIPTION  QTY  UNIT  UNIT PRICE (IDR)   AMOUNT (IDR) 

A. MATERIAL
Fiber Optic Cable, Single Mode G.652D, Duct 
A.1 m
Application, 96 cores
HDPE pipe having 40 mm outside diameter and 3.5 
A.2 m                                 ‐
mm thickness (40/33 mm)
Universal (straight/branch) 4‐holes joint closure for 
A.3 pcs                                 ‐
single mode fiber optic cable, 96 cores
Optical Termination Box, ETSI 19" rack mounted type,
A.4 fully equiped with 2 m pigtails using FC/PC adaptor, 96 pcs                                 ‐
cores
A.5 Ball Marker pcs                                 ‐
A.6 Open rack 19" for OTB placement pcs                                 ‐
A.7 Warning tape, metalized 15 cm wide m                                 ‐
SUBTOTAL MATERIAL (A)                                ‐ 
B. CIVIL WORKS & INSTALLATION
Construction of handhole, concrete K225/ 20cm 
B.1 thickness  ‐ LxWxH: 110 x 120 x 150 cm with complete  unit                                 ‐
accessories
Excavation, trenching, & backfilling for duct placement, 
B.2 m                                 ‐
120 cm depth in, on ALL CONDITIONS
Installation of HDPE pipe having 40 cm outside 
diameter & 3.5 mm thickness for fiber optic cable with 
B.3 m                                 ‐
sand surround and warning tape, applicable for normal 
depth of trench
B.4 Reinstatement on ALL CONDITIONS m                                 ‐
Machine boring using HDPE pipe having 125 mm OD & 
B.5 m                                 ‐
7.4 mm thickness
Manual boring using PVC pipe having 4" or 5" inside 
B.6 m                                 ‐
diameter & 5.5 mm thickness
Railway crossing by machine boring using HDPE pipe 
B.7 m                                 ‐
having 125 mm OD & 7.4 mm thickness 
River crossing by new steel duct bridge using self 
B.8 m                                 ‐
supporting or steel wire
Duct Slump using PVC pipe having 4" inside diameter & 
B.9 m                                 ‐
5.5 mm thickness
B.10 Installation of fiber optic cable m                                 ‐
B.11 Jointing of fiber optic cable, 96 cores pcs                                 ‐
Testing & Commissioning of Fiber Optik Link (from OTB 
B.12 link                                 ‐
to OTB), 
SUBTOTAL CIVIL WORKS & INSTALLATION (B)                                ‐ 
C DESIGN & PROJECT MANAGEMENT
C.1 Site Survey & Design lot                                 ‐
Project Management, including: warehouse, transport, 
C.2 lot                                 ‐
supervision, acceptance test, etc.
C.3 As‐Built drawing set                                 ‐
SUBTOTAL DESIGN & PROJECT MANAGEMENT (C )                                ‐ 

GRAND TOTAL (A+B+C)                                ‐ 

COMPANY NAME:

SIGNATURE:
LAMPIRAN 4
6/6

PRICE SCHEDULE
OUTSIDE PLANT (OSP) BACKBONE JAWA
SECTION: SOLO ‐ SURABAYA

NO. DESCRIPTION  QTY  UNIT  UNIT PRICE (IDR)   AMOUNT (IDR) 

A. MATERIAL
Fiber Optic Cable, Single Mode G.652D, Duct 
A.1 m
Application, 96 cores
HDPE pipe having 40 mm outside diameter and 3.5 
A.2 m                                 ‐
mm thickness (40/33 mm)
Universal (straight/branch) 4‐holes joint closure for 
A.3 pcs                                 ‐
single mode fiber optic cable, 96 cores
Optical Termination Box, ETSI 19" rack mounted type,
A.4 fully equiped with 2 m pigtails using FC/PC adaptor, 96 pcs                                 ‐
cores
A.5 Ball Marker pcs                                 ‐
A.6 Open rack 19" for OTB placement pcs                                 ‐
A.7 Warning tape, metalized 15 cm wide m                                 ‐
SUBTOTAL MATERIAL (A)                                ‐ 
B. CIVIL WORKS & INSTALLATION
Construction of handhole, concrete K225/ 20cm 
B.1 thickness  ‐ LxWxH: 110 x 120 x 150 cm with complete  unit                                 ‐
accessories
Excavation, trenching, & backfilling for duct placement, 
B.2 m                                 ‐
120 cm depth in, on ALL CONDITIONS
Installation of HDPE pipe having 40 cm outside 
diameter & 3.5 mm thickness for fiber optic cable with 
B.3 m                                 ‐
sand surround and warning tape, applicable for normal 
depth of trench
B.4 Reinstatement on ALL CONDITIONS m                                 ‐
Machine boring using HDPE pipe having 125 mm OD & 
B.5 m                                 ‐
7.4 mm thickness
Manual boring using PVC pipe having 4" or 5" inside 
B.6 m                                 ‐
diameter & 5.5 mm thickness
Railway crossing by machine boring using HDPE pipe 
B.7 m                                 ‐
having 125 mm OD & 7.4 mm thickness 
River crossing by new steel duct bridge using self 
B.8 m                                 ‐
supporting or steel wire
Duct Slump using PVC pipe having 4" inside diameter & 
B.9 m                                 ‐
5.5 mm thickness
B.10 Installation of fiber optic cable m                                 ‐
B.11 Jointing of fiber optic cable, 96 cores pcs                                 ‐
Testing & Commissioning of Fiber Optik Link (from OTB 
B.12 link                                 ‐
to OTB), 
SUBTOTAL CIVIL WORKS & INSTALLATION (B)                                ‐ 
C DESIGN & PROJECT MANAGEMENT
C.1 Site Survey & Design lot                                 ‐
Project Management, including: warehouse, transport, 
C.2 lot                                 ‐
supervision, acceptance test, etc.
C.3 As‐Built drawing set                                 ‐
SUBTOTAL DESIGN & PROJECT MANAGEMENT (C )                                ‐ 

GRAND TOTAL (A+B+C)                                ‐ 

COMPANY NAME:

SIGNATURE: