TurnOver - Engineering Manager
TurnOver - Engineering Manager
TOWER 1 TOWER 2
L25 L14
L29 L15
L30
L31
L32
L33
ELECTRICAL MERALCO
SUPPLY WITH BACK UP POWER PROVIDED BY THE BUILDING
WATER MAYNILAD
SUPPLY
ELECTRICAL MERALCO
SUPPLY WITH BACK UP POWER PROVIDED BY THE BUILDING
WATER MAYNILAD
SUPPLY
EMAIL ADD
[email protected]
[email protected]
WORK ORDER NO.2 OVERVIEW OF SERVICES
1) TECHNICAL MANAGEMENT OF CRITICAL EQUIPMENT
2) REPAIR AND MAINTENANCE OF CRITICAL EQUIPMENT
3) COORDINATION WITH BUILDING ADMINISTRATION
4) MANAGEMENT OF ENERGY AND UTILITIES
5) AUDIO AND VISUAL MANAGEMENT
6) SERVICE INSIGHT MONITORING
7) CREATING REPORT FOR CBRE LOCAL AND REGIONAL
Name of Vendor Vendor Scope Contact person Contact Number
Alvin Pascual
Preventive maintenance 63 917 854 7593
EMERSON NETWORK
of critical equipment Elizabeth Jalea 63 920 9612944
POWER
(PACU, UPS & FM200)
HOTLINE 63 2 7207400
JM Montero
CBRE Technical
Ad hoc Services
Services Karl Alcantara 63 906 3234700, 63 915
4110777, 63 947 5246580
Jinky Nono 63 926 6312964
LANDLINE 63 2 893 9325, 63 2 894 5120
Preventive maintenance Thess Co 63 917 8190236
System 10 of access security, CCTV Dante Razon 63 917 8190237
and alarm system
LANDLINE 63 2 771 2021
63 947 7258452, 63 925
Rodel Gracian
3795901
Preventive maintenance
63 925 5488 367
HUMIDTEMP of Back up air con (FCU Ms.Claire
& VAV) Francisco Dacid Jr. 63 925 4913973
LANDLINE 63 2 5795160
[email protected]
10th floor National life Building Ayala Avenue
Makati City
[email protected] , [email protected], [email protected]
[email protected]
[email protected]
Block 11, L0t 17, Mangoville Subd., Salitran 4,
Damarinas Cavite
Weekly
Create weekend activity and send to Facilities Manager
Monitor the preventive maintenance activity of critical equipment (if there is a schedule)
Inspect back up aircon functionality
Inspect facility safety (check any office hazard)
Monthly
Create monthly report to be submitted to Engineering Lead and upload to Filesite
Create monthly report to be Facilities Manager and CBRE Phil. Operations Manager
EQUIPMENT NAME MODEL SERIAL NUMBER
UPS NXA0F0080U 2101200607209700
UPS NXA0F0080U 2101200607209800
UPS NXA0F0030U 2101200604209700
UPS NXA0F0030U 2101200604209700
UPS NXRE0305005 21012007282127EA002B
UPS NXRE0305005 21012007282127EA002E
UPS A01200537 2101200537213703000C
UPS A01200537 2101200537213703000B
UPS NXA0F0030U 2101200103206C000054
PACU CW038DCSD14110A C09H140214
PACU CW038DCSD14110A C09H140215
PACU CW038UCSD C09H140293
PACU CW038UCSD C09H140294
PACU PEX AIR CONDITIONER 21F0105041212B010001
PACU PEX AIR CONDITIONER 21F0105041212B010002
PACU PEX AIR CONDITIONER 21F0105042212B010001
PACU PEX AIR CONDITIONER 21F0105042212B010002
SPU CARRIER 63613
SPU CARRIER 63620
Fire suppresion system Kidde / Aegis
Fire suppresion system Kidde / Aegis
Fire suppresion system FM200
CAPACITY LOCATION
80kVA TEC 1 L30
80kVA TEC 1 L30
30kVA TEC 1 L30
30kVA TEC 1 L30
120kVA TEC 2 L14
120kVA TEC 2 L14
90kVA TEC 1 L32
90kVA TEC 1 L32
30kVA 6750 L22
8TR TEC 1 L30
8TR TEC 1 L30
8TR TEC 1 L30
8TR TEC 1 L30
8TR TEC 2 L14
8TR TEC 2 L14
8TR TEC 2 L14
8TR TEC 2 L14
5TR 6750 L22
5TR 6750 L22
TEC 1 L30
TEC 2 L14
6750 L22
FCU and VAV DATA
Capacity
FLOOR FCU NO.
(TR)
25 1 2
25 2 2
25 3 3
25 4 3
25 5 3
25 6 3
25 7 3
25 8 2
25 9 2
25 10 2
25 11 2
25 12 2
25 13 2
25 14 3
25 15 3
25 16 3
25 17 3
25 18 3
25 19 1.5
TOTAL 19 47.5
Capacity
FLOOR FCU NO.
(TR)
29 1 4
29 2 2
29 3 2
29 4 2
29 5 2
29 6 2
29 7 2
29 8 2
29 9 2
29 10 3
29 11 2
29 12 3
29 13 3
29 14 3
29 15 4
29 16 4
29 17 4
29 18 4
29 19 1.5
29 20 3
29 21 3
29 22 3
29 23 3
TOTAL 23 63.5
Capacity
FLOOR FCU NO.
(TR)
30 1 1.71
30 2 2.03
30 3 1.54
30 4 1.63
30 5 1.54
30 6 1.3
30 7 1.3
30 8 1.3
30 9 1.3
30 10 1.47
30 11 1.47
30 12 1.72
30 13 0.96
30 14 0.96
30 15 1.21
30 16 1.21
30 17 1.57
30 18 1.02
30 19 0.89
30 20 1.31
30 21 1.56
30 22 2.6
30 PACU 1 7.86
30 PACU 2 7.86
30 PACU 3 7.2
30 PACU 4 7.2
TOTAL 22 61.72
Capacity
FLOOR FCU NO.
(TR)
31 1 1.83
31 2 2.17
31 3 1.89
31 4 1.51
31 5 1.37
31 6 0.6
31 7 0.6
31 8 1.11
31 9 0.52
31 10 0.57
31 11 2.19
31 12 1.83
31 13 1.83
31 14 0.88
31 15 0.88
31 16 1
31 17 1
31 18 1.11
31 19 1.11
31 20 1.87
31 21 1.57
31 22 1.4
31 23 1.92
31 24 0.99
TOTAL 24 31.75
Capacity
FLOOR FCU NO. VAV NO.
(TR)
32 1 5 1
32 2 3 2
32 3 3 3
32 4 3 4
32 5 3 5
32 6 3 6
32 7 3
32 8 3
32 9 3
32 10 3
32 11 3
32 12 3
32 13 3
32 14 5
32 15 3
32 16 3
32 17 3
32 18 3
TOTAL 18 58 6
Capacity
FLOOR FCU NO. VAV NO.
(TR)
33 1 3.99 1
33 2 2.8 2
33 3 2.8 3
33 4 2.8 4
33 5 2.8 5
33 6 3.8 6
33 7 1.87 7
33 8 1.87
33 9 5
33 10 3
33 11 3
33 12 3
33 13 3
33 14 5
TOTAL 14 44.73 7
Capacity
FLOOR FCU NO. VAV NO.
(TR)
14 1 4 1
14 2 4 2
14 3 3 3
14 4 3 4
14 5 3 5
14 6 3
14 7 5
14 8 4
14 9 4
14 10 4
14 11 4
14 12 4
14 13 5
14 14 2
TOTAL 14 52 5
Capacity
FLOOR FCU NO. VAV NO.
(TR)
15 1 4 1
15 2 4 2
15 3 3 3
15 4 3 4
15 5 3 5
15 6 3 6
15 7 5 7
15 8 3 8
15 9 3
15 10 3
15 11 3
15 12 3
15 13 3
15 14 3
15 15 5
15 16 5
TOTAL 16 56 8
Lighting Inventory
Total PM
Equipment Serial Number 14-Oct 14-Nov
Visits
TEC 1 L30 NXA0F0080U 2101200607209702 (UPS) 4 21-Nov-15
TEC 1 L30 NXA0F0080U 2101200607209803 (UPS) 4 21-Nov-15
TEC 1 L30 NXA0F0030U 2101200604209701 (UPS) 4 21-Nov-15
TEC 1 L30 NXA0F0030U 2101200604209702 (UPS) 4 21-Nov-15
TEC 2 L14 NXRE0305005 (120Kva) 21012007282127EA002B (UPS) 4 21-Nov-15
TEC 2 L14 NXRE0305005 (120Kva) 21012007282127EA002E (UPS) 4 21-Nov-15
TEC 1 L32 A01200537 (NXR 90kVA) 2101200537213703000C (UPS) 4 21-Nov-15
TEC 1 L32 A01200537 (NXR 90kVA) 2101200537213703000B (UPS) 4 21-Nov-15
TEC 2 L14 PEX AIR CONDITIONER 21F0105041212B010001 (PACU) 12 17-Oct-15 7-Nov-15
TEC 2 L14 PEX AIR CONDITIONER 21F0105041212B010002 (PACU) 12 17-Oct-15 7-Nov-15
TEC 2 L14 PEX AIR CONDITIONER 21F0105042212B010001 (PACU) 12 17-Oct-15 7-Nov-15
TEC 2 L14 PEX AIR CONDITIONER 21F0105042212B010002 (PACU) 12 17-Oct-15 7-Nov-15
TEC 1 L30 CW038DCSD14110A C09H140214 (PACU) 12 17-Oct-15 7-Nov-15
TEC 1 L30 CW038DCSD14110A C09H140215 (PACU) 12 17-Oct-15 7-Nov-15
TEC 1 L30 CW038UCSD C09H140293 (PACU) 12 17-Oct-15 7-Nov-15
TEC 1 L30 CW038UCSD C09H140294 (PACU) 12 17-Oct-15 7-Nov-15
IRScan_2101200604209701 1
Thermal Imaging
IRScan_2101200604209702 1
Thermal Imaging
IRScan_2101200607209702 1
Thermal Imaging
IRScan_2101200607209803 1
Thermal Imaging
IRScan_21012007282127EA002B 1
Thermal Imaging
IRScan_21012007282127EA002E 1
Thermal Imaging
IRScan_2101200537213703000C 1
Thermal Imaging
IRScan_2101200537213703000B 1
Thermal Imaging
TEC 2 L14 PREACTION FIRE PROTECTION SYS 4 17-Oct-15
TEC 1 L30 PREACTION FIRE PROTECTION SYS 4 17-Oct-15
Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16
12-Dec-15 23-Jan-16 27-Feb-16 24-Mar-16 23-Apr-16 28-May-16 25-Jun-16 23-Jul-16 27-Aug-16 24-Sep-16
12-Dec-15 23-Jan-16 27-Feb-16 24-Mar-16 23-Apr-16 28-May-16 25-Jun-16 23-Jul-16 27-Aug-16 24-Sep-16
13-Feb-16 24-Mar-16 25-Jun-16 24-Sep-16
24-Sep-16
28-Feb-15 24-Mar-16 25-Jun-16
1-Dec 14-Jan 14-Feb 14-Mar 14-Apr 14-May 14-Jun 14-Jul 14-Aug 14-Sep
Project Description
SPU in 6750 will not run automatically if there will be a
power fluctuation.
Pending projects
Relocation of fail over control from L14 TEC 2 to L25 TEC 1
Project Description
Fail over control in L14 TEC 2 was deactivated after
purchasing CRAC for comms room
Pending projects
Tapping of Research & Settlements to UPS power
Project Description
Research and Settlements will be connected to UPS
Research have their own portable UPS but not adviseable
Action Item/s Attached copy of emails; documents as reference
Created draft business case subject for Engineering
Lead approval
RE for your approval - Fail Over control in L25 and 6750 comm
control in L25 and 6750 comms rm_Small Project Business Case Approval_04.msg
s reference
control in L25 and 6750 comms rm_Small Project Business Case Approval_04.msg
s reference
Service Insight Pending Tickets
Jan Mo Report.zip
Jan-15 Patrick Tse
Feb Mo Report.zip
Feb-15 Patrick Tse
Mar Mo Report.zip
Mar-15 Patrick Tse
Apr Mo Report.zip
Apr-15 Patrick Tse
May Mo Report.zip
May-15 Patrick Tse
Jun Mo Report.zip
Jun-15 Patrick Tse
Jul Mo Report.zip
Jul-15 Patrick Tse
Aug Mo Report.zip
Aug-15 Patrick Tse
List of Documents to be turned over