0% found this document useful (0 votes)
41 views10 pages

Change Request Template: CR Contacts

This change request template contains sections for collecting details about a proposed network change including priority, location, description, affected equipment, schedule, contacts, and work details. It requests information to analyze impact and provide fallback planning. Contact information is gathered for multiple parties involved in approving, executing and overseeing the change.

Uploaded by

Gaurav Sethi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views10 pages

Change Request Template: CR Contacts

This change request template contains sections for collecting details about a proposed network change including priority, location, description, affected equipment, schedule, contacts, and work details. It requests information to analyze impact and provide fallback planning. Contact information is gathered for multiple parties involved in approving, executing and overseeing the change.

Uploaded by

Gaurav Sethi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

Change Request Template

CR No Circle
Cluster Network Element
Date of Submitting Time
Technology Domain NPO/CORE/BSS/TX
CR Contacts
Name Designation Phone
Originator
Approver 1
Approver 2
Approver 3
Executor
Executor's Manager
Circle SPOC
GNSC SPOC
Operator Contact
CR detail
Type of Work/Activity Priority
Location Address
Site id / Number
Change Request Description
(Objective)
Pre-Test Plan

Work Description (MOP)

SW Version/CD Level
Supporting Documents
IMPACT Analysis
Post Test Plan

Fall Back Plan

List of Affected
Equipment and Circuits
Affected parties contact information
Name Designation Company email
To be filled by Circle Team
Work detail information
Schedule Date Start END
Schedule Time Start END
Outage Date Start END
Outage Time Start END
Reschedule Date Start End
Reschedule Time Start End
Reschedule Outage Date Start End
Reschedule Outage Time Start End
Work Result
Reason
(if Work not finished)
Status
quest Template
work Element

Outage Severity
Contacts
Phone Email

R detail
Priority

contact information
email Phone
ail information
DL Regular NPO Outage Critical
HR Urgent CORE Non Outage Major
PJ BSS Minor
HP TX
UE
UW
KA
TN
KL
AP
KO
WB
BH
MH
OR
GJ
RJ
MP
CH

MU
JK
NE
CURRENT CKT IN POOL OLD MSS/MGW NEW MSS/MGW

OSS AMR NON AMR BSC SPC NAME SPC NAME


NEW MSS/MGW

SPC
REHOMING DAT
Sr No ET SLC OLD POOL NUMBER OLD CGR NUMBER OLD POOL NAME OLD CIC
REHOMING DATABASE
OLD CKTS IN CIC tcpcm NEW POOL TYPE NEW CGR NEW POOL NAME TCPCM CKTS IN CIC
New CIC New MSS E1

You might also like