PURPOSE & JUSTIFICATION REASON FOR THE PROJECT – MAY REFER TO BUSINESS CASE, STRATEGIC OBJECTIVES OR EXTERNAL
FACTORS
OBJECTIVES MULTIPLE OBJECTIVES FOR THE SCOPE, SCHEDULE, COST, QUALITY, CUSTOMER SATISFACTION, ETC
HIGH LEVEL REQUIREMENTS INITIAL HIGH LEVEL BUSINESS & COMPLIANCE REQUIREMENTS THAT MEETS CUSTOMER
EXPECTATIONS
ASSUMPTIONS & CONSTRAINTS INTIAL ASSUMPTION ABOUT SCOPE, RESOURCES, FUNDING, LIMITATION, BUDGET OR FIXED DUE
DATE
HIGH LEVEL PROJECT DESCRIPTION SUMMART OF THE PROJECT’S DELIVERABLES & APPROACH TO BUDGETS
HIGH LEVEL RISKS INITIAL RISK THAT WILL LATER BE PROGRESIVELY ELABORATED
SUMMARY MILESTONE SIGNIFICANT EVENTS OF DELIVERABLES: PHASE COMPLETION, DELIVERABLES & ACCEPTANC
STAKEHOLDER LIST INITIAL LIST OF PEOPLE WHO CAN INFLUENCE OR BE INFLUENCED BY THE PROJECT
APPROVAL REQUIREMENTS WHO CAN APPROVE & SIGN OFF ON EACH DELIVERABLE & CRITERIA FOR ACCEPTANCE
PM AUTH ON STAFFING, TECHNICAL AUTHORITY TO HIRE, FIRE, DISCPLINE, ACCEPT OR REJECT. AUTH TO MAKE TECHNICAL DECISIONS
DECISION, CONFLICT RESOLUTION, OR APPROACH, TO RESOLVE CONFLICT WITHIN TEAMS OR EXTERNAL STAKEHOLDERS & TO COMMIT
BUDGET MGMT & MANAGE FUNDS VARIANCE
SPONSOR, PM & OTHER RELEVENT DEMONSTRATE COMMITMENT & APPROVAL FOR THE PROJECT
CONTRACT
ENTERPRISE (IF ANY)
ENVIRONMENT BUSINESS
AL
FACTOR (EEF) CASE
ORGANIZATIONAL
PROCESS
ASSETS PROJECT
(OPA) STATEMENT
OF WORK
(SOW)
TOOLS &
TECHNIQUES
• THE INFORMATION IN THE PROJECT MANAGEMENT PLAN COMES FROM ALL THE PLANNING
PROCESSES (EXCEPT CHANGE MANAGEMENT PLAN & CONFIGURATION MANAGEMENT
PLAN)
• FACILITATION TECHNIQUES
• BRAINSTORMING
• PROBLEM SOLVING
• CONFLICT RESOLUTION
• MEETING MANAGEMENT
CHANGE CONTROL SYSTEM
• THE PROJECT MANAGEMENT PLAN INCLUDES BASELINES OF THE SCOPE,
SCHEDULE, AND BUDGET THAT CAN BE CHANGED. THUS WHEN CHANGE IS
ENCOUNTERED, THE PROJECT MANAGEMENT PLAN MUST BE CONSULTED FIRST
TO DECIDE HOW TO PROCEED.
• CHANGE CONTROL SYSTEM IS A SET OF PROCEDURES THAT DESCRIBES HOW
MODIFICATION TO THE PROJECT DELIVERABLES & DOCUMENTATION ARE
MANAGED & CONTROLLED
• HOW CHANGE REQUESTS TO BE MADE,
• THE PROCESS TO EVALUATE THE REQUESTS
• WHO SHOULD SIT ON THE CHANGE CONTROL BOARD
• LEVELS OF AUTHORITY FOR APPROVING CHANGES
CONFIGURATION MANAGEMENT SYSTEM
• A SUBSYSTEM OF THE OVERALL PROJECT MANAGEMENT SYSTEM.
• COLLECTION OF FORMAL DOCUMENTED PROCEDURES USED TO APPLY TECHNICAL &
ADMINISTRATIVE DIRECTIONS & SURVEILLANCE TO:
• IDENTIFY & DOCUMENT THE FUNCTIONAL & PHYSICAL CHARACTERISTIC OF THE PROJECT
OUTPUT
• CONTROL ANY CHANGES TO SUCH CHARACTERISTICS
• RECORD & REPORT EACH CHANGE & ITS IMPLEMENTATION STATUS
• SUPPORT THE AUDIT OF THE PROJECT OUTPUT TO VERIFY CONFORMANCE TO
REQUIREMENTS
• INCLUDES DOCUMENTATION, TRACKING SYSTEM & DEFINED APPROVAL LEVELS NECESSARY
FOR AUTHORIZING & CONTROLLING CHANGES
STKHOL QUALITY
DR MGMT
PROJECT REQUIRE MGMT COST PLAN PROCESS
MT
ENTERPRISE CHARTER PLAN PRFRMNC IMPRVMN
MGMT E T
ENVIRONMENT
SCOPE PLAN SCHEDUL COMM
AL E
BASELINE PLAN
MGMT MGMT
FACTOR (EEF) PLAN
SCHEDULE BASELINE PLAN
ORGANIZATIONAL HUMAN PRCRMNT
TOOLS &
TECHNIQU
ES
EXPERT PROJECT
JUDGEMENTS & MANAGEMENT
OUTPUTS
MEETINGS INFORMATION SYSTEM
WORK PROJECT
PERFORMANC CHANGE PROJECT
MNAGEMENT
DELIVERABLES E DOCUMENTS
REQUESTS PLAN
UPDATES
DATA UPDATES
UNIQUE & VERIFIABLE PRODUCT, RESULT OR CAPABILY TO PERFORM A
DELIVERABLES SERVICE THAT IS REQUIRED TO BE PRODUCED TO COMPLETE A PROCESS,
PHASE OR PROJECT.
IT IS A TANGIBLE COMPONENT
WORK RAW OBSERVATIONS & MEASUREMENTS IDENTIFIED DURING PERFORMANCE
PERFORMANCE OF ACTIVITIES TO CARRY OUT PROJECT WORK.
DATA EX: KPI, TECHNICAL PERFORMANCE, START & FINISH DATES, # OF DEFECTS,
ACTUAL COST
TOOLS &
TECHNIQU
ES 3. PROJECT MANAGEMENT
1. EXPERT INFORMATION SYSTEM
JUDGEMENTS 4. MEETINGS
2. ANALYTICAL
OUTPUTS
TECHNIQUES
• THIS PROCESS IS CONDUCTED THROUGHOUT THE LIFE OF THE PROJECT & IT’S THE
ULTIMATE RESPONSIBILITY OF THE PM. THE PROJECT MANAGEMENT PLAN, PROJECT
SCOPE STATEMENT & OTHER DELIVERABLES ARE MAINTAINED BY CAREFULLY
MANAGING CHANGES.
• WHEN REQUIRED, PERFORM INTEGRATED CHANGE CONTROL PROCESS INCLUDES A
CHANGE CONTROL BOARD (CCB)
• CCB IS A FORMALLY CHARTERED GROUP RESPONSIBLE FOR REVIEWING, EVALUATING,
APPROVING, DELAYING OR REJECTING CHANGES TO THE PROJECT AND RECORDING
SUCH DECISIONS.
• CUSTOMER OR SPONSOR APPROVAL MAY STILL BE NEEDED UNLESS THEY ARE ALSO
PART OF THE CCB
CONFIGURATION MANAGEMENT
• CONFIGURATION CONTROL IS FOCUSED ON THE SPECIFICATION OF BOTH OF THE
DELIVERABLES & THE PROCESSES.
• WHILE CHANGE CONTROL IS FOCUSED ON IDENTIFYING, DOCUMENTING, APPROVING
OR REJECTING CHANGES TO THE PROJECT’S DELIVERABLES
• SOME OF THE CONFIGURATION MANAGEMENT ACTIVITIES INCLUDED IN THE
PERFORM INTEGRATED CHANGE CONTROL PROCESS ARE:
• CONFIGURATION IDENTIFICATION – PROVIDE BASIS DEFINITION & VERIFICATION.
PRODUCTS & DOCUMENTS ARE LABELLED, CHANGES MANAGED & ACCOUNTABILITY
MAINTAINED
• CONFIGURATION STATUS ACCOUNTING – INFO LIKE LISTING OF APPROVED
CONFIGURATION IDENTIFICATION, STATUS & IMPLEMENTATION OF PROPOSED CHANGES
ARE RECORDED & REPORTED.
• CONFIGURATION VERIFICATION & AUDIT – ENSURES THAT THE COMPOSITION &
CONFIGURATION ITEMS ARE TRACKED, CORRECTLY IMPLEMENTED TO MEET THE DEFINED
CONFIGURATION DOCUMENT.
ENTERPRISE PROJEC
ENVIRONMENTA T
MGMT
CHANGE
REQUESTS
L PLAN
FACTOR (EEF)
ORGANIZATION
AL WORK
PROCESS PERFORMAN
ASSETS CE MANUAL OR AUTOMATED
(OPA) REPORTS MAY BE USED BASED ON
NEEDS
ORGANIZATION
AL ACCEPTED
PROCESS • REGRESSION ANALYSIS
DELIVERABLE
ASSETS • GROUPING METHODS
S
(OPA) • CAUSAL ANALYSIS
• ROOT CAUSE ANALYSIS
• FORECASTING SCENARIOS
• FAILURE MODE & EFFECT
ANALYSIS
• TREND ANALYSIS
TOOLS & • EARNED VALUE MANAGEMENT
TECHNIQU (EVM)
• VARIANCE ANALYSIS
ES