Engineering Surveys Lecture
Engineering Surveys Lecture
Project
Identification
Preliminary
Design Design
Design Supplemental
Development
Engineering Design Stage
Stage
Stage
Execute
Control
Design Design
Revised
Data Plan Plan
Close-out
ENGINEERING SURVEYS DEFINED
Topographic Plan Survey Report
Right-of-Way/ Hydrographic
Parcellary Plan Survey Plan
Survey Data
External Factors
Hydrologic Data Surveying is a means of making (PESTEL)
relatively large-scale, accurate
measurements of the Earth’s surfaces.
ENGINEERING SURVEYS DEFINED
Rough Estimation
Feasibility Studies
and Alignment
Engineering
Surveys
Project Execution Design Data
Design Development
Engineering Project
Project Execution
Surveys Controls
Quality Control
RWT Retaining, head and wing walls, top back 0.015 0.005
Roadway/Railroads/Parking Areas
CRS Center of roadway, surfaced 0.015 0.005
CRUS Center of roadway, unsurfaced 0.030 0.030
EP Edge of Pavement 0.015 0.005
EPS Edge of Paved Shoulder 0.015 0.005
ESD Edge of surfaced driveway 0.015 0.005
ESPL Edge of surface parking lot 0.015 0.005
ETW Edge of travelled way 0.015 0.005
EUR Edge of unsurfaced road 0.030 0.030
EUSD Edge of unsurfaced driveway 0.030 0.030
EUSPL Edge of unsurfaced parking lot 0.030 0.030
PAV Selected pavement point 0.015 0.005
RRBS Railroad bed shoulder 0.030 0.030
TRL Pack trail or two-track vehicle rail 0.030 0.030
Survey Standards
Buildings/Sidewalks/Curb & Gutter/Concrete Items
BLD Buildings 0.015 0.005
CON Selected concrete point 0.015 0.005
CSP Concrete slope protection 0.015 0.005
FLC Flow line of curb 0.015 0.005
SLAB Concrete slab 0.015 0.005
SWC Sidewalk edge, concrete 0.015 0.005
SWE Sidewalk edge, not concrete 0.030 0.030
TBC Top, back of curb 0.015 0.005
Storage Tanks
TANK Storage tank 0.030 0.030
Water/Drainages
CLBD Concrete line ditch, bottom 0.015 0.005
CLDT Concrete line ditch, top
DBI Drainage bottom, irrigation 0.030 0.030
DFL Drainage flow line, natural ground 0.030 0.030
Survey Standards
Code Description Horizontal Accuracy (m) Vertical Accuracy (m)
Bridges/Barriers/Guardrails
BREJ Bridge Expansion Joint 0.015 0.005
BRG Bridge 0.015 0.005
BRP Bridge Pier 0.015 0.005
COB Concrete Barrier 0.015 0.005
COPB Concrete post barrier 0.015 0.005
GR Bridge and roadway guardrails 0.015 0.005
SRCP Structure roadway clearing point 0.015 0.005
Railroads
RCS Railroad crossing signal 0.030 0.030
RR Railroad; center of tracks, any other tracks 0.030 0.030
IBM-3
IBM-2
IBM-1
END OF SURVEY.