0% found this document useful (0 votes)
234 views

Pneumetic Roller: Item No. Per 13.14 1 Cum Cum 40 Mm. Th. Premix Carpet Asphalt Concrete Per SQM

The document provides cost estimates for various road construction materials and tasks including: - Asphalt concrete with compaction using materials like bitumen, aggregate, cement, and equipment like asphalt plants, rollers, and trucks. - Premix carpet asphalt concrete and gravel subbase laying using bitumen, aggregate, rollers, and wood. - Base course construction using crushed stone aggregate and equipment like graders, rollers, and loaders. - The document lists unit costs of materials, labor, and equipment to estimate total costs.

Uploaded by

slash
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
234 views

Pneumetic Roller: Item No. Per 13.14 1 Cum Cum 40 Mm. Th. Premix Carpet Asphalt Concrete Per SQM

The document provides cost estimates for various road construction materials and tasks including: - Asphalt concrete with compaction using materials like bitumen, aggregate, cement, and equipment like asphalt plants, rollers, and trucks. - Premix carpet asphalt concrete and gravel subbase laying using bitumen, aggregate, rollers, and wood. - Base course construction using crushed stone aggregate and equipment like graders, rollers, and loaders. - The document lists unit costs of materials, labor, and equipment to estimate total costs.

Uploaded by

slash
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Skilled m.d. 0.03 1000.

00
Unsilled m.d. 0.13 800.00
Foreman md 0.01 800.00
Bitumen Kg 117.00 70.00
Aggregate cum. 1.200 2500.00
Cement t 0.022 20000.00
Providing, Mixing, and Laying Asphalt Concrete
diesel lit 10.450 90.00
with Compaction
Asphelt m.Plant Hrs 0.044 7000.00
wheel loader Hrs 0.660 1200.00
Asphalt pever Hrs 0.220 1400.00
Steel tyred roller Hrs 0.550 500.00
pneumetic Roller Hrs 0.550 1200.00
Tipper, Truck Hrs 0.3 450.00
Item No. per Sub-Total
13.14 1 Cum
Norms: DOR 13.10 Page 13-4 U.Rate cum
40 mm. th. Premix Carpet Asphalt Concrete per Sqm

Skilled m.d. 0.45 1000.00


Unsilled m.d. 4.50 800.00
Providing, Mixing, Laying and Compaction of Bitumen Kg 77.00 70.00
Premix Carpet Aggregate cum. 1.200 2500.00
Roller Hrs 0.500 500.00
Wood kg 24.0 18.00
Item No. per Sub-Total
13.13 1 Cu.m
Norms: DOR 13.09 Page 13-4 U.Rate cu.m.
20 mm. th. Premix Carpet per cft

Skilled m.d. 0.0050 1000.00


UnSkilled m.d. 0.0400 800.00
Natural gravel cu.m. 1.28 1500.00
Providing, Laying, Spreading, Watering,
Leveling and Compaction of Gravel Subbase Diesel Litre 0.7920 90.00
grading as per Table 12.1 of Standard Vib. Roller Hrs 0.0220 500.00
Specification lead upto 10m
Grader Hrs 0.0200 2000.00
Water Tanker Hrs 0.0380 800.00
Loader Hrs 0.0110 1200.00
Item No. per Sub-Total
13.8 1 Cu.m
Norms: DOR 12.01 Page 12-1 U.Rate cu.m.
Sub Base Course per cft
Skilled m.d. 0.0050 1000.00
UnSkilled m.d. 0.0200 800.00
Base Agg cu.m. 1.2000 3000.00
Providing, Laying, Spreading, Watering, Diesel Lit 0.990 90.00
Leveling and Compaction of Crusher run
materials for base Course lead upto 10m Grader Hrs 0.0330 1200.00
Vib. Roller Hrs 0.0330 900.00
Water Tanker Hrs 0.0330 800.00
Loader Hrs 0.0110 1200.00
Item No. per Sub-Total
13.9 1 Cu.m
Norms: DOR 12.06 Page 12-2 U.Rate cu.m.
Base Course (crusher run materials) per cft
30.00
104.00
8.00
79.10 9254.70
3000.00
440.00
940.50
308.00
792.00
308.00
275.00
660.00
144.00
16264.20
16264.20
16264.20
650.57

450.00
3600.00
79.10 6090.70
3000.00
250.00
432.00
13822.70
13822.70
13822.70
391.42

5.00
32.00
1920.00
71.28
11.00
40.00
30.40
13.20
2122.88
2122.88
2122.88
60.11
5.00
16.00
3600.00
89.10
39.60
29.70
26.40
13.20
3819.00
3819.00
3819.00
108.14